As longwall caving mining method prevails rapidly in China coal mines, amount of gas emission from longwall faces and goaf area increased significantly. Using traditional gas drainage methods, such as drilling upward ...As longwall caving mining method prevails rapidly in China coal mines, amount of gas emission from longwall faces and goaf area increased significantly. Using traditional gas drainage methods, such as drilling upward holes to roof strata in tailgate or drilling inseam and cross-measure boreholes, could not meet methane drainage requirements in a gassy mine. The alternative is to drill boreholes from surface down to the Iongwall goaf area to drain the gas out. As soon as a coal seam is extracted out, the upper rock strata above the goaf start to collapse or become fractured depending upon the rock characteristics and the height above the coal seam. During overlying rock strata being fractured, boreholes in the area may be damaged due to ground movement after the passage of the Iongwall face. The sudden damage of a borehole may cause a Iongwall production halt or even a serious mine accident. A theoretical calculation of the stability of surface boreholes in mining affected area is introduced along with an example of determination of borehole and casing diameters is given for demonstration. By using this method for the drilling design, the damage of surface boreholes caused by excessive mining induced displacement can be effectively reduced if not totally avoided. Borehole and casing diameters as well as characteristics of filling materials can be determined using the proposed method by calculating the horizontal movement and vertical stain at different borehole depths.展开更多
The purpose of underground methane drainage technology is to prevent methane disasters and enable the efficient use of coal mine methane(CMM),and the sealing depth is a key factor that affects the performance of under...The purpose of underground methane drainage technology is to prevent methane disasters and enable the efficient use of coal mine methane(CMM),and the sealing depth is a key factor that affects the performance of underground methane drainage.In this work,the layouts of in-seam and crossing boreholes are considered to analyze the stress distribution and failure characteristics of roadway surrounding rock through a numerical simulation and field stress investigation to determine a reasonable sealing depth.The results show that the depths of the plastic and elastic zones in two experimental coal mines are 16 and 20 m respectively.Borehole sealing minimizes the air leakage through the fractures around the roadway when the sealing material covers the failure and plastic zones,and the field test results for CMM drainage at different sealing depths indicate that the CMM drainage efficiency increases with increasing sealing depth but does not change once the sealing depth exceeds the plastic zone.Moreover,sealing in the high-permeability roadway surrounding rock does not have a strong influence on the borehole sealing performance.Considering these findings,a new CMM drainage system for key sealing in the low-permeability zone was developed that is effective for improving the CMM drainage efficiency and prolonging the high-concentration CMM drainage period.The proposed approach offers a valuable quantitative analysis method for selecting the optimum sealing parameters for underground methane drainage,thereby improving considerably the drainage and utilization rates of CMM.展开更多
In order to study the influence of a fault on the movement law of the overlying strata as well as its effect on the gas drainage boreholes, based on the practical situation of 1242(1) panel at Xieqiao Mine in Huaina...In order to study the influence of a fault on the movement law of the overlying strata as well as its effect on the gas drainage boreholes, based on the practical situation of 1242(1) panel at Xieqiao Mine in Huainan, the Finite Element Method (FEM) model was built up, and the distribution of the stress field and the displacement field of the overlying strata in the stope with a fault were simulated by using the FEM software ANSYS. The results indicate that because of the existence of the fault, the horizontal displacement of overlying strata near the gas drainage borehole becomes larger than that in the stope without a fault, and the distribution of the stress field of the overlying strata changes greatly. When the working face is far away from the fault, the distribution of the stress field is approximately symmetrical. As the working face advances to the place 50 m away from the fault, the stress range at the right side goaf area is as twice as that at the left side. Here, the stress distribution area of goaf area and the fault plane run through, the fracture-connected-zone is formed. It can be presumed that the gas adsorbed in the coal and rock will flow into the fault zone along the fracture-connected-zone, which causes the quantity of gas drainage reduce remarkably.展开更多
Using self-researched gas drainage borehole stability dynamic monitoring device, three-dimensional deformation characteristics of borehole under steady vertical load were researched experimentally and systematically. ...Using self-researched gas drainage borehole stability dynamic monitoring device, three-dimensional deformation characteristics of borehole under steady vertical load were researched experimentally and systematically. This research indicated that under the action of steady loading, the mechanical deformation path of the simulated gas drainage borehole is gradually complicated, and the decay of the borehole circumferential strain is an important characterization of the prediction and early warning of borehole instability and collapse. The horizontal position of borehole occurs compressive strain, and the vertical of which occurs tensile strain under the action of vertical stress. At the initial stage of loading, the vertical strain is more sensitive than that in the horizontal direction. After a certain period of time, the horizontal strain is gradually higher than the vertical one, and the intersection of the borehole horizontal diameter and the hole wall is the stress concentration point. With the increase of the depth of hole, the strain shows a gradual decay trend as a whole, and the vertical strain decays more observably, but there is no absolute position correlation between the amount of strain decay and the increase in borehole depth,and the area within 1.5 times the orifice size is the borehole stress concentration zone.展开更多
Borehole leakage not only affects the gas drainage effect but also presents considerable risk to human security. For the research on the leakage mechanism of gas drainage borehole, the rheological and visco-elastic-pl...Borehole leakage not only affects the gas drainage effect but also presents considerable risk to human security. For the research on the leakage mechanism of gas drainage borehole, the rheological and visco-elastic-plastic characteristics were considered to establish the mechanical model of coal mass around borehole, which is used to analyze the leakage mechanism and deduce the dynamic leakage model. On the basis of the real coal seam conditions, the variation rules of the stress, leakage ring, and air leakage amount were analyzed through numerical simulation, and the influence factors of air leakage amount were also investigated to provide the theoretical basis for the sealing technology. Results show that the air leakage amount of borehole is inversely proportional to the increase in supporting stress and sealing length, and directly correlated with the increase in borehole radius and softening modulus. Using theoretical analysis, we design a novel active supporting sealing technology that can use grouting material to seal the fractures to reduce the leakage channels and also provide supporting stress to prevent borehole deformation. The engineering test results indicate that the average gas concentration with the novel active supporting sealing technology is increased by 162.12% than that of traditional polyurethane sealing method. Therefore, this technology not only effectively resolves borehole leakage but also significantly improves the gas drainage effect.展开更多
China's rapid economic development has increased the demand for coal.These results in Chinese coal mines being extended to deeper levels.The eastern Chinese,more economical developed,regions have a long history of...China's rapid economic development has increased the demand for coal.These results in Chinese coal mines being extended to deeper levels.The eastern Chinese,more economical developed,regions have a long history of coal mining and many coal mines have now started deep mining at a depth from 800 to 1500 m.This increase in mining depth,geostresses,pressures,and gas content of the coal seam complicates geologic construction conditions.Lower permeability and softer coal contribute to increasing numbers of coal and gas outburst,and gas explosion,disasters.A search on effective methods of preventing gas disasters has been provided funds from the Chinese government since 1998.The National Engineering Research Center of Coal Gas Control and the Huainan and Huaibei Mining Group have conducted theoretical and experimental research on a regional gas extraction technology.The results included two important findings.First,grouped coal seams allow adoption of a method where a first,key protective layer is mined to protect upper and lower coal seams by increasing permeability from 400 to 3000 times.Desorption of gas and gas extraction in the protected coal seam of up to 60%,or more,may be achieved in this way.Second,a single seam may be protected by using a dense network of extraction boreholes consisting of cross and along-bed holes.Combined with this is increased use of water that increases extraction of coal seam gas by up to 50%.Engineering practice showed that regional gas drainage technology eliminates regional coal and gas outburst and also enables mining under low gas conditions.These research results have been adopted into the national safety codes of production technology.This paper systematically introduces the principles of the technology,the engineering methods and techniques,and the parameters of regional gas drainage.Engineering applications are discussed.展开更多
The siphon drainage is an effective measure for the slope groundwater control. However,for the traditional siphon drainage, limitations such as siphon lift restriction and poor reliability in longterm service prevent ...The siphon drainage is an effective measure for the slope groundwater control. However,for the traditional siphon drainage, limitations such as siphon lift restriction and poor reliability in longterm service prevent it from being widely used. In this study, an improved siphon drainage method with inclined borehole penetrating the deep part of the slope is proposed to overcome the limitations suffered by the traditional method. Through experimental research, theoretical analysis and engineering practice,the reliability and capability of the proposed method are investigated. The results demonstrate that with the inclined pipe the height difference between the control point of the groundwater level and the orifice can be controlled to be less than the height of the water column corresponding to the local atmospheric pressure. As a result, deep drainage can be achieved.In addition, by controlling the diameter of siphon drainage pipe not larger than 4 mm, a plug flow can be formed in the siphon pipe, which can prevent air accumulation in the siphon process and a continuous and effective siphon drainage is achieved. Through a practical project running smoothly since September 2013, it is found that the proposed method can effectively drain the groundwater deep in the slope and the maximum drawdown of groundwater level in boreholes can reach 8.5 m with an average drainage flow of 5.5 m3/d. The practical results also illustrate that 4 mm siphon pipe can be used to realize deep slope drainage and restart siphon automatically.展开更多
When an extremely thick rock bed exists above a protected coal seam in the bending zone given the condition of a mining protective seam, this extremely thick rock bed controls the movement of the entire overlying stra...When an extremely thick rock bed exists above a protected coal seam in the bending zone given the condition of a mining protective seam, this extremely thick rock bed controls the movement of the entire overlying stratum. This extremely thick rock bed, called a "main key stratum", will not subside nor break for a long time, causing lower fractures and bed separations not to close and gas can migrate to the bed separation areas along the fractures. These bed separations become gas enrichment areas. By analyzing the rule of fracture evolution and gas migration under the main key stratum after the deep protective coal seam has been mined, we propose a new gas drainage method which uses bore holes, drilled through rock and coal seams at great depths for draining pressure relief gas. In this method, the bores are located at a high level suction roadway (we can also drill them in the drilling field located high in an air gateway). Given the practice in the Haizi mine, the gas drainage rate can reach 73% in the middie coal group, with a gas drainage radius over 100 m.展开更多
Gas emissions of workfaces in steeply inclined and extremely thick coal seams differ from those under normal geological conditions, which usually feature a high gas concentration and a large emission quantity. This st...Gas emissions of workfaces in steeply inclined and extremely thick coal seams differ from those under normal geological conditions, which usually feature a high gas concentration and a large emission quantity. This study took the Wudong coal mine in Xinjiang province of China as a typical case. The gas occurrence of the coal seam and the pressure-relief range of the surrounding rock(coal) were studied by experiments and numerical simulations. Then, a new method to calculate the gas emission quantity for this special geological condition was provided. Based on the calculated quantity, a further gas drainage plan, as well as the evaluation of it with field drainage data, was finally given. The results are important for engineers to reasonably plan the gas drainage boreholes of steeply inclined and extremely thick coal seams.展开更多
This study established numerical modeling using COMSOLTMto examine the influence of horizontal location and drainage ability of surface borehole on spontaneous combustion in longwall working face gob. Rescaled Range A...This study established numerical modeling using COMSOLTMto examine the influence of horizontal location and drainage ability of surface borehole on spontaneous combustion in longwall working face gob. Rescaled Range Analysis(R/S analysis) was employed to investigate the chaos characteristic of N_2/O_2 ratio from a surface borehole in 10416 working face gob, Yangliu Colliery, China. The simulation results show that there is always a circular ‘‘dissipation zone" around the drainage borehole and an elliptic ‘‘spontaneous combustion zone" in deep gob. Little influence was found on spontaneous combustion zone on the intake side of the gob but the width of spontaneous combustion zone in middle gob is enlarged, while the depth of spontaneous combustion zone near the return side is reduced. The R/S analysis indicates that the influence of surface borehole on spontaneous combustion can be divided into two stages by the chaos feature of N_2/O_2: safety drainage stage and spontaneous combustion initiating stage. It can be concluded that the methane drainage from gob through surface borehole can intervene in the distribution of spontaneous combustion zone in gob and the chaos feature of N_2/O_2 from surface borehole can effectively reflect coal spontaneous combustion condition in gob.展开更多
Computational fluid dynamics(CFD) simulation is an effective approach to develop and optimise gas drainage design for underground longwall coal mining. As part of the project supported by the Australian Government Coa...Computational fluid dynamics(CFD) simulation is an effective approach to develop and optimise gas drainage design for underground longwall coal mining. As part of the project supported by the Australian Government Coal Mining Abatement Technology Support Package(CMATSP), threedimensional CFD simulations were conducted to test and optimise a conceptual design which proposes using horizontal boreholes to replace vertical boreholes at an underground coal mine in Australia.Drainage performance between a vertical borehole and a horizontal borehole was first carried out to compare their capacity and effectiveness. Then a series of cases with different horizontal borehole designs were simulated to optimise borehole configuration parameters such as location, diameter, and number of boreholes. The study shows that the horizontal borehole is able to create low pressure sinks that protect the workings from goaf gas ingresses by changing goaf gas flow directions, and that it has the advantage to continuously maintain such low pressure sinks near the tailgate as the longwall advances. An example of optimising horizontal borehole locations in the longwall lateral direction is also given in this paper.展开更多
文摘As longwall caving mining method prevails rapidly in China coal mines, amount of gas emission from longwall faces and goaf area increased significantly. Using traditional gas drainage methods, such as drilling upward holes to roof strata in tailgate or drilling inseam and cross-measure boreholes, could not meet methane drainage requirements in a gassy mine. The alternative is to drill boreholes from surface down to the Iongwall goaf area to drain the gas out. As soon as a coal seam is extracted out, the upper rock strata above the goaf start to collapse or become fractured depending upon the rock characteristics and the height above the coal seam. During overlying rock strata being fractured, boreholes in the area may be damaged due to ground movement after the passage of the Iongwall face. The sudden damage of a borehole may cause a Iongwall production halt or even a serious mine accident. A theoretical calculation of the stability of surface boreholes in mining affected area is introduced along with an example of determination of borehole and casing diameters is given for demonstration. By using this method for the drilling design, the damage of surface boreholes caused by excessive mining induced displacement can be effectively reduced if not totally avoided. Borehole and casing diameters as well as characteristics of filling materials can be determined using the proposed method by calculating the horizontal movement and vertical stain at different borehole depths.
基金This research was supported by the National Natural Science Foundation of China(51974300)the Fundamental Research Funds for the Central Universities(2021YCPY0206 and 2020ZDPY0224)the Postgraduate Research&Practice Innovation Program of Jiangsu Province(KYCX21_2467),and as a project funded by the Priority Academic Program Development of Jiangsu Higher Education Institutions.
文摘The purpose of underground methane drainage technology is to prevent methane disasters and enable the efficient use of coal mine methane(CMM),and the sealing depth is a key factor that affects the performance of underground methane drainage.In this work,the layouts of in-seam and crossing boreholes are considered to analyze the stress distribution and failure characteristics of roadway surrounding rock through a numerical simulation and field stress investigation to determine a reasonable sealing depth.The results show that the depths of the plastic and elastic zones in two experimental coal mines are 16 and 20 m respectively.Borehole sealing minimizes the air leakage through the fractures around the roadway when the sealing material covers the failure and plastic zones,and the field test results for CMM drainage at different sealing depths indicate that the CMM drainage efficiency increases with increasing sealing depth but does not change once the sealing depth exceeds the plastic zone.Moreover,sealing in the high-permeability roadway surrounding rock does not have a strong influence on the borehole sealing performance.Considering these findings,a new CMM drainage system for key sealing in the low-permeability zone was developed that is effective for improving the CMM drainage efficiency and prolonging the high-concentration CMM drainage period.The proposed approach offers a valuable quantitative analysis method for selecting the optimum sealing parameters for underground methane drainage,thereby improving considerably the drainage and utilization rates of CMM.
基金Supported by the National Natural Science Foundation of China(50534080) the National Basic Research Program of China(2005CB221504) Taishan Scholar Engineering Construction Foundation of Shandong Province
文摘In order to study the influence of a fault on the movement law of the overlying strata as well as its effect on the gas drainage boreholes, based on the practical situation of 1242(1) panel at Xieqiao Mine in Huainan, the Finite Element Method (FEM) model was built up, and the distribution of the stress field and the displacement field of the overlying strata in the stope with a fault were simulated by using the FEM software ANSYS. The results indicate that because of the existence of the fault, the horizontal displacement of overlying strata near the gas drainage borehole becomes larger than that in the stope without a fault, and the distribution of the stress field of the overlying strata changes greatly. When the working face is far away from the fault, the distribution of the stress field is approximately symmetrical. As the working face advances to the place 50 m away from the fault, the stress range at the right side goaf area is as twice as that at the left side. Here, the stress distribution area of goaf area and the fault plane run through, the fracture-connected-zone is formed. It can be presumed that the gas adsorbed in the coal and rock will flow into the fault zone along the fracture-connected-zone, which causes the quantity of gas drainage reduce remarkably.
基金financial support of Distinguished scholars of yueqi (NO. 800015Z1179)National Science Fund subsidized project (51474220)Basic scientific research project of the CPC Central Committee (NO. 2009QZ03)
文摘Using self-researched gas drainage borehole stability dynamic monitoring device, three-dimensional deformation characteristics of borehole under steady vertical load were researched experimentally and systematically. This research indicated that under the action of steady loading, the mechanical deformation path of the simulated gas drainage borehole is gradually complicated, and the decay of the borehole circumferential strain is an important characterization of the prediction and early warning of borehole instability and collapse. The horizontal position of borehole occurs compressive strain, and the vertical of which occurs tensile strain under the action of vertical stress. At the initial stage of loading, the vertical strain is more sensitive than that in the horizontal direction. After a certain period of time, the horizontal strain is gradually higher than the vertical one, and the intersection of the borehole horizontal diameter and the hole wall is the stress concentration point. With the increase of the depth of hole, the strain shows a gradual decay trend as a whole, and the vertical strain decays more observably, but there is no absolute position correlation between the amount of strain decay and the increase in borehole depth,and the area within 1.5 times the orifice size is the borehole stress concentration zone.
基金supported by the National Natural Science Foundation of Youth Science Fund Project of China (No. 51604096)Funded by Hebei State Key Laboratory of Mine Disaster Prevention of China (No. KJZH2017K08)+1 种基金Funded by the Research Fund of State and Local Joint Engineering Laboratory for Gas Drainage & Ground Control of Deep Mines (Henan Polytechnic University) of China (No. G201609)He Nan Research Program of Application Foundation and Advanced Technology of China (No. 162300410031)
文摘Borehole leakage not only affects the gas drainage effect but also presents considerable risk to human security. For the research on the leakage mechanism of gas drainage borehole, the rheological and visco-elastic-plastic characteristics were considered to establish the mechanical model of coal mass around borehole, which is used to analyze the leakage mechanism and deduce the dynamic leakage model. On the basis of the real coal seam conditions, the variation rules of the stress, leakage ring, and air leakage amount were analyzed through numerical simulation, and the influence factors of air leakage amount were also investigated to provide the theoretical basis for the sealing technology. Results show that the air leakage amount of borehole is inversely proportional to the increase in supporting stress and sealing length, and directly correlated with the increase in borehole radius and softening modulus. Using theoretical analysis, we design a novel active supporting sealing technology that can use grouting material to seal the fractures to reduce the leakage channels and also provide supporting stress to prevent borehole deformation. The engineering test results indicate that the average gas concentration with the novel active supporting sealing technology is increased by 162.12% than that of traditional polyurethane sealing method. Therefore, this technology not only effectively resolves borehole leakage but also significantly improves the gas drainage effect.
基金the State Key Basic Research Program of China(No.2011CB201204)the National Natural Science Foundation of China(Nos.51074160 and 50904068)
文摘China's rapid economic development has increased the demand for coal.These results in Chinese coal mines being extended to deeper levels.The eastern Chinese,more economical developed,regions have a long history of coal mining and many coal mines have now started deep mining at a depth from 800 to 1500 m.This increase in mining depth,geostresses,pressures,and gas content of the coal seam complicates geologic construction conditions.Lower permeability and softer coal contribute to increasing numbers of coal and gas outburst,and gas explosion,disasters.A search on effective methods of preventing gas disasters has been provided funds from the Chinese government since 1998.The National Engineering Research Center of Coal Gas Control and the Huainan and Huaibei Mining Group have conducted theoretical and experimental research on a regional gas extraction technology.The results included two important findings.First,grouped coal seams allow adoption of a method where a first,key protective layer is mined to protect upper and lower coal seams by increasing permeability from 400 to 3000 times.Desorption of gas and gas extraction in the protected coal seam of up to 60%,or more,may be achieved in this way.Second,a single seam may be protected by using a dense network of extraction boreholes consisting of cross and along-bed holes.Combined with this is increased use of water that increases extraction of coal seam gas by up to 50%.Engineering practice showed that regional gas drainage technology eliminates regional coal and gas outburst and also enables mining under low gas conditions.These research results have been adopted into the national safety codes of production technology.This paper systematically introduces the principles of the technology,the engineering methods and techniques,and the parameters of regional gas drainage.Engineering applications are discussed.
基金financially supported by the National Key R&D Program of China (Grant No. 2018YFC1504704)the National Natural Science Foundation of China (Grant No. 41772276)Key R&D project of Zhejiang Province (Grant No. 2017C03006)
文摘The siphon drainage is an effective measure for the slope groundwater control. However,for the traditional siphon drainage, limitations such as siphon lift restriction and poor reliability in longterm service prevent it from being widely used. In this study, an improved siphon drainage method with inclined borehole penetrating the deep part of the slope is proposed to overcome the limitations suffered by the traditional method. Through experimental research, theoretical analysis and engineering practice,the reliability and capability of the proposed method are investigated. The results demonstrate that with the inclined pipe the height difference between the control point of the groundwater level and the orifice can be controlled to be less than the height of the water column corresponding to the local atmospheric pressure. As a result, deep drainage can be achieved.In addition, by controlling the diameter of siphon drainage pipe not larger than 4 mm, a plug flow can be formed in the siphon pipe, which can prevent air accumulation in the siphon process and a continuous and effective siphon drainage is achieved. Through a practical project running smoothly since September 2013, it is found that the proposed method can effectively drain the groundwater deep in the slope and the maximum drawdown of groundwater level in boreholes can reach 8.5 m with an average drainage flow of 5.5 m3/d. The practical results also illustrate that 4 mm siphon pipe can be used to realize deep slope drainage and restart siphon automatically.
基金Projects 2005CB221503 supported by the National Basic Research Program of China70533050 and 50674089 by the National Natural Science Foundation of China2005BA813B-3-06 by the National Tenth 5-Year Key Scientific and Technological Project
文摘When an extremely thick rock bed exists above a protected coal seam in the bending zone given the condition of a mining protective seam, this extremely thick rock bed controls the movement of the entire overlying stratum. This extremely thick rock bed, called a "main key stratum", will not subside nor break for a long time, causing lower fractures and bed separations not to close and gas can migrate to the bed separation areas along the fractures. These bed separations become gas enrichment areas. By analyzing the rule of fracture evolution and gas migration under the main key stratum after the deep protective coal seam has been mined, we propose a new gas drainage method which uses bore holes, drilled through rock and coal seams at great depths for draining pressure relief gas. In this method, the bores are located at a high level suction roadway (we can also drill them in the drilling field located high in an air gateway). Given the practice in the Haizi mine, the gas drainage rate can reach 73% in the middie coal group, with a gas drainage radius over 100 m.
基金provided by the National Science and Technology Major Project (No. 2016ZX05043-005)
文摘Gas emissions of workfaces in steeply inclined and extremely thick coal seams differ from those under normal geological conditions, which usually feature a high gas concentration and a large emission quantity. This study took the Wudong coal mine in Xinjiang province of China as a typical case. The gas occurrence of the coal seam and the pressure-relief range of the surrounding rock(coal) were studied by experiments and numerical simulations. Then, a new method to calculate the gas emission quantity for this special geological condition was provided. Based on the calculated quantity, a further gas drainage plan, as well as the evaluation of it with field drainage data, was finally given. The results are important for engineers to reasonably plan the gas drainage boreholes of steeply inclined and extremely thick coal seams.
基金provided by the National Natural Science Foundation of China (No. 51174198)China Scholarship Council (No. 201506420024)
文摘This study established numerical modeling using COMSOLTMto examine the influence of horizontal location and drainage ability of surface borehole on spontaneous combustion in longwall working face gob. Rescaled Range Analysis(R/S analysis) was employed to investigate the chaos characteristic of N_2/O_2 ratio from a surface borehole in 10416 working face gob, Yangliu Colliery, China. The simulation results show that there is always a circular ‘‘dissipation zone" around the drainage borehole and an elliptic ‘‘spontaneous combustion zone" in deep gob. Little influence was found on spontaneous combustion zone on the intake side of the gob but the width of spontaneous combustion zone in middle gob is enlarged, while the depth of spontaneous combustion zone near the return side is reduced. The R/S analysis indicates that the influence of surface borehole on spontaneous combustion can be divided into two stages by the chaos feature of N_2/O_2: safety drainage stage and spontaneous combustion initiating stage. It can be concluded that the methane drainage from gob through surface borehole can intervene in the distribution of spontaneous combustion zone in gob and the chaos feature of N_2/O_2 from surface borehole can effectively reflect coal spontaneous combustion condition in gob.
基金the Department of Industry and Science,Australian Government for funding this researchthe management and staff of Glencore Bulga Underground Operations for their significant contributions in this project
文摘Computational fluid dynamics(CFD) simulation is an effective approach to develop and optimise gas drainage design for underground longwall coal mining. As part of the project supported by the Australian Government Coal Mining Abatement Technology Support Package(CMATSP), threedimensional CFD simulations were conducted to test and optimise a conceptual design which proposes using horizontal boreholes to replace vertical boreholes at an underground coal mine in Australia.Drainage performance between a vertical borehole and a horizontal borehole was first carried out to compare their capacity and effectiveness. Then a series of cases with different horizontal borehole designs were simulated to optimise borehole configuration parameters such as location, diameter, and number of boreholes. The study shows that the horizontal borehole is able to create low pressure sinks that protect the workings from goaf gas ingresses by changing goaf gas flow directions, and that it has the advantage to continuously maintain such low pressure sinks near the tailgate as the longwall advances. An example of optimising horizontal borehole locations in the longwall lateral direction is also given in this paper.