期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Optimization of drilling and blasting operations in an open pit mine——the SOMAIR experience 被引量:4
1
作者 AFENI Thomas Busuyi 《Mining Science and Technology》 EI CAS 2009年第6期736-739,共4页
Drilling and blasting play vital roles in opencast mining. These operations not only affect the cost of production directly but as well and significantly, the overall operational costs. This research was carried out t... Drilling and blasting play vital roles in opencast mining. These operations not only affect the cost of production directly but as well and significantly, the overall operational costs. This research was carried out to find a possible way of optimizing the drilling and blasting operations in an open pit mine of Somair (Société des Mines de l’Air), in the Niger Republic. In order to optimize the drilling operation, the time taken by two drilling machines to accomplish the same task was analyzed statistically. The result indicates that the Down the Hole Hammer Drilling Rig (DMNo406) is more efficient than the Drill Master (DM405). The relative unit consumption of two explosives (Explus and Nitram 9), when used under the same operating conditions, were also considered and the results indicate Explus to be more economical per unit consumption with a range of 0.15 g/t–0.183 g/t, when compared with Nitram 9 with a unit consumption range of 0.19 g/t-0.24 g/t in the study area. 展开更多
关键词 DRILLING BLASTING cumulative time unit consumption explosive
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部