A new multifunctional testing device for rock fragmentation was introduced, which can conduct many experiments such as single cutting under static load, crushing under impact load, thrusting under static load and cutt...A new multifunctional testing device for rock fragmentation was introduced, which can conduct many experiments such as single cutting under static load, crushing under impact load, thrusting under static load and cutting-impact test under the dynamic and static load. The results of granite and concrete抯 experiments with polycrystalline diamond compact (PDC) flat cutters and carbide alloy cutters under different loadings show that the device has good performance, and the characteristics of broken rock under the combined loads are similar to that under the single static pressure or impact crushing the rock, and the combined loads can increase the effect of rock fragmentation obviously. The experimental methods and effects have the important meaning for studying new drill-ing tool on hard rock fragmentation.展开更多
The accurate performance evaluation of a cutterhead is essential to improving cutterhead structure design and predicting project cost. Through extensive research, this paper evaluates the performance of a tunnel borin...The accurate performance evaluation of a cutterhead is essential to improving cutterhead structure design and predicting project cost. Through extensive research, this paper evaluates the performance of a tunnel boring machine(TBM) cutterhead for cutting ability and slagging ability. This paper propose cutting efficiency, stability, and continuity of slagging as the evaluation indexes of comprehensive cutterhead performance. On the basis of research of true TBM engineering applications, this paper proposes a calculation method for each index. A slagging efficiency index with a ratio of the maximum di erence between the slagging amount and average slagging is established. And a slagging stability index with a ratio of the maximum slagging fluctuation and average slagging is presented. Meanwhile, a cutting efficiency index by the weighed average value of multistage rock fragmentation of a cutter’s specific energy is established. The Robbins and China Railway Construction Corporation(CRCC) cutterheads are evaluated. The results show that under the same thrust and torque, the slagging stability of the CRCC scheme is worse, but the slagging continuity of the CRCC scheme is better. The cutting ability index shows that the CRCC cutterhead is more efficient.展开更多
Time interval of short delay ignition is an important factor to affect theefficiency of blasting cuts. The motion process of rock pieces in the cut cavity is analyzed, amechanical model to calculate the delay time of ...Time interval of short delay ignition is an important factor to affect theefficiency of blasting cuts. The motion process of rock pieces in the cut cavity is analyzed, amechanical model to calculate the delay time of parallel hole cuts is presented for tunnel blasting,and a theoretical method to determine the volume ratio (the clearage rate) of the rock pieceswithin the cut cavity at different moments is proposed for the blasting cut with an empty hole.Numerical analysis results show that the optimal delay interval is proportional to the boreholedepth. The suggested results are of practical value to the optimal design of the delay interval inmillisecond blasting related to the parallel hole cuts with an empty hole.展开更多
文摘A new multifunctional testing device for rock fragmentation was introduced, which can conduct many experiments such as single cutting under static load, crushing under impact load, thrusting under static load and cutting-impact test under the dynamic and static load. The results of granite and concrete抯 experiments with polycrystalline diamond compact (PDC) flat cutters and carbide alloy cutters under different loadings show that the device has good performance, and the characteristics of broken rock under the combined loads are similar to that under the single static pressure or impact crushing the rock, and the combined loads can increase the effect of rock fragmentation obviously. The experimental methods and effects have the important meaning for studying new drill-ing tool on hard rock fragmentation.
基金Supported by National basic research program of China(973 Project,Grant No.2013CB035400)National Natural Science Foundation of China(Grant No.51375001)+1 种基金Major Projects of Liaoning Science and Technology Plan(Grant No.2015106016)Basic Research Project of Central University(Grant No.DUT16QY11)
文摘The accurate performance evaluation of a cutterhead is essential to improving cutterhead structure design and predicting project cost. Through extensive research, this paper evaluates the performance of a tunnel boring machine(TBM) cutterhead for cutting ability and slagging ability. This paper propose cutting efficiency, stability, and continuity of slagging as the evaluation indexes of comprehensive cutterhead performance. On the basis of research of true TBM engineering applications, this paper proposes a calculation method for each index. A slagging efficiency index with a ratio of the maximum di erence between the slagging amount and average slagging is established. And a slagging stability index with a ratio of the maximum slagging fluctuation and average slagging is presented. Meanwhile, a cutting efficiency index by the weighed average value of multistage rock fragmentation of a cutter’s specific energy is established. The Robbins and China Railway Construction Corporation(CRCC) cutterheads are evaluated. The results show that under the same thrust and torque, the slagging stability of the CRCC scheme is worse, but the slagging continuity of the CRCC scheme is better. The cutting ability index shows that the CRCC cutterhead is more efficient.
基金This work was financially supported by the National Natural Science Foundation of China (No. 59974019)
文摘Time interval of short delay ignition is an important factor to affect theefficiency of blasting cuts. The motion process of rock pieces in the cut cavity is analyzed, amechanical model to calculate the delay time of parallel hole cuts is presented for tunnel blasting,and a theoretical method to determine the volume ratio (the clearage rate) of the rock pieceswithin the cut cavity at different moments is proposed for the blasting cut with an empty hole.Numerical analysis results show that the optimal delay interval is proportional to the boreholedepth. The suggested results are of practical value to the optimal design of the delay interval inmillisecond blasting related to the parallel hole cuts with an empty hole.