The large thermal cutting equipment——The DHG. CNC numerical control plasma cutting machine is produced by The Ha’erbin Welding & Cutting Equipment Co. It specializes in the precise formation and baiting of nonf...The large thermal cutting equipment——The DHG. CNC numerical control plasma cutting machine is produced by The Ha’erbin Welding & Cutting Equipment Co. It specializes in the precise formation and baiting of nonferrous boards and thin carbon steel plates at a high speed. It avoids the disadvantage of flame cutting, which cannot cut nonferrous and thin steel plates.展开更多
In order to control cutting force and its direction i n milling operation, a new milling head was developed. The head has two milling cutters, which are connected by a pair of gears and rotate in opposite direction re...In order to control cutting force and its direction i n milling operation, a new milling head was developed. The head has two milling cutters, which are connected by a pair of gears and rotate in opposite direction respectively. Both up-cut and down-cut can be carried out simultaneously by t hese milling cutters. The each depth of cut, the ratio of up/down cutting depth , by these cutters can be also selected. The cutting force characteristics were experimentally discussed by changing the ratio. The cutting force and its locus can be also changed by the selection of the ratio of up/down cutting depth. For practical usage of the head the analytical prediction method of the cutting forc e characteristics under selected cutting condition was proposed based on the ene rgy approach method proposed, in which both of cutting force characteristics of a single milling cutter and the combined milling cutter under a selected up/dow n cutting depth ratio were analytically estimated based on the two dimensional c utting data. It was experimentally shown that in NC milling machine the cutting force locus was controlled in pre-determined direction under various tool paths .展开更多
This paper analyses the fragmenting principle of static blasting agent (SBA) and the action of its cutting fragmentation. Using SBA for sterming material proved very useful and advantageous. Here we analyse in detail ...This paper analyses the fragmenting principle of static blasting agent (SBA) and the action of its cutting fragmentation. Using SBA for sterming material proved very useful and advantageous. Here we analyse in detail the cutting action of pre- stress and stress wave in pre-stressing force blasting.展开更多
A mathematical model of the computer numerical control (CNC) heavy cuttingservo system including chatter in cutting courses was constructed for the chatter in CNC heavycutting. The theoretical analysis, computer simul...A mathematical model of the computer numerical control (CNC) heavy cuttingservo system including chatter in cutting courses was constructed for the chatter in CNC heavycutting. The theoretical analysis, computer simulation and orthogonal tests on this model show thatincreasing the gain of position K_(pp) can improve the rapid tracking performance of machine tools,and decreasing the delay time of speed loop τ_s can quickly eliminate the static error in thesystem, but the limited cutting width b_(lim) will descend correspondingly; excessively large orexcessively small gain of speed loop K_(ps) can result in decreasing b_(lim); optimizing K_(pp),τ_s and K_(ps) can improve the dynamic and static performance of the system and increase b_(lim).It is easy and feasible to optimize the servo parameters by the orthogonal test. This method caneffectively improve the system's stability and limited cutting width and it is suitable for the CNCheavy cutting of heavy-duty machine tools.展开更多
In this paper, by in-depth geological research of Kalamkas Oilfield in Central Asia, the geological body has been re-ascertained; combined with fine study of reservoir engineering, based on the understanding of the di...In this paper, by in-depth geological research of Kalamkas Oilfield in Central Asia, the geological body has been re-ascertained; combined with fine study of reservoir engineering, based on the understanding of the distribution of remaining oil horizontal wells have been given full play to stabilizing oil production and controlling water cut, reducing the producing pressure drop, improving well productivity and other advantages, and the development and deployment has been optimized; horizontal wells have been applied to solve problems such as old well casing damages, shutting down wells, low-productivity and low- efficiency wells, and high water cut wells to improve the utilization rate of old wells; through separate layer system improved injection production pattern, adjustment wells have been optimized and deployed, and part measures wells have been preferably selected to tap the residual oil improve the degree of reserves control realize the stabilization of oil production and control of water cut in an old oilfield, and further improve the development effects.展开更多
Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pr...Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pre- stressed bolting theory was used to design a roof control method for a large span roadway. By reducing the span and applying equal strength coordinated supports the rock could be stabilized. The control prin- ciples and methods are given herein along with the analysis. A double micro arch cross section roadway is defined and its use in solving the current problem is described. Beam arch theory was used to build a model of the double micro arch cross section roadway. A support reverse force model for the arch foot intersection was also derived. A support method based upon reducing the width of the large span in the cut hole is presented. These results show that the reduced span of the roadway roof plus the use of cable anchors and single supports gives an effective way to control the large span cut hole. On site monitoring showed that the reduced span support from the double micro arch cross section roadway design had a significant effect. The roadway surface displacement was small and harmful deformation of the cut hole was effectively controlled. This will ensure its long term stability.展开更多
The new Austrian tunneling method (NATM) is widely applied in design and construction of underground engineering projects. When the type and distribution of unfavorable geological bodies (UGBs) associated with the...The new Austrian tunneling method (NATM) is widely applied in design and construction of underground engineering projects. When the type and distribution of unfavorable geological bodies (UGBs) associated with their influences on geoengineering are complicated or unfortunately are overlooked, we should pay more attentions to internal features of rocks grades IV and V (even in local but mostly controlling zones). With increasing attentions to the characteristics, mechanism and influences of engineering construction-triggered geohazards, it is crucial to fully understand the disturbance of these geohazards on project construction. A reasonable determination method in construction procedure, i.e. the shape of working face, the type of engineering support and the choice of feasible procedure, should be considered in order to mitigate the construction-triggered geohazards. Due to their high sensitivity to groundwater and in-situ stress, various UGBs exhibit hysteretic nature and failure modes. To give a complete understanding on the internal causes, the emphasis on advanced comprehensive geological forecasting and overall reinforcement treatment is therefore of more practical significance. Compre- hensive evaluation of influential factors, identification of UGB, and measures of discontinuity dynamic controlling comprises the geoengineering condition evaluation and dynamic controlling method. In a case of a cut slope, the variations of UGBs and the impacts of key environmental factors are presented, where more severe construction-triggered geohazards emerged in construction stage than those predicted in design and field investigation stages. As a result, the weight ratios of different influential factors with respect to field investigation, design and construction are obtained.展开更多
In order to determine the influence of shearer's cutting and neighboring shields' advance on the support resistance variation, leg pressure data of all 235 shields in the panel LW61 of Cumberland coal mine wer...In order to determine the influence of shearer's cutting and neighboring shields' advance on the support resistance variation, leg pressure data of all 235 shields in the panel LW61 of Cumberland coal mine were analyzed. The results show that the relationship between the leg pressure increment and the distance from shield to front drum of shearer is a quadratic function and that the higher leg pressure increment before shield advance tends to be related to adverse roof conditions. In addition, the three proposed leg pressure increment-related parameters and the three traditional parameters(time-weighted average pressure, setting pressure, and final pressure) of approximately 32000 shield supporting cycles were calculated by a self-developed software package to analyze the correlation between them. The results show that there is a powerful connection between them, and that the three proposed leg pressure increment-related parameters could be used as the indexes to evaluate the interaction between shields and the roof, and to identify the periodic weighting.展开更多
On the tasis of study in the mathematical model of 3-dimensional ruled surface (RS),this paper introduces a new concept of distance paramcter (DP) and also puts forward that themethod of modeling a RS depends on not o...On the tasis of study in the mathematical model of 3-dimensional ruled surface (RS),this paper introduces a new concept of distance paramcter (DP) and also puts forward that themethod of modeling a RS depends on not only two boundary curves but also DP. According toabove theory, the formulas to calculate corresponding point coordinates to any kind of top and bot-tom profile of a workpiece and formulas to calcuate the maximum inclination angle of ruling linehave been obtained. Then a different top and bottom RS mathining method including profile withline-are combination as well as parametric curves has been achieved by 4-axes simultancous con-trol programming proposed.展开更多
There are a number of geotechnical systems used at open cut operations of Anglo American's Metallurgical Coal business unit in Australia. These systems are mainly mine site specific, based on geological informatio...There are a number of geotechnical systems used at open cut operations of Anglo American's Metallurgical Coal business unit in Australia. These systems are mainly mine site specific, based on geological information and used as hazard plans. They are qualitative and reliant upon the experienced judgement of site based engineers and the general workforce. They are not suitable for calculating the associated risks of geological structures and mining responses. A uniform risk rating system that can be used to provide an unbiased, standard and quantifiable assessment of the risk from highwall and lowwall failures is therefore developed using the experience gained with such systems in Anglo American's South African operations. This system is a semi-quantitative risk rating system and takes into account the relative differences in the importance of hazards as experienced at each mine site as a result of different combinations of geotechnical factors and mining conditions. It is based on critical geotechnical and other parameters that have been identified by site mining engineers, geologists and geotechnical engineers. The primary advantage of this risk rating system is that all open cut mines in the Anglo American's Metallurgical Coal operations use a near identical system, which enables the user to compare the risk after each blast and with other mines. The system can be adjusted to meet local mine specific requirements. The implementation of this system, a computer program that automatically calculates the risks and recommends predetermined controls, has been made as practical and as easy to use as possible. This program can be used by personnel from other mining disciplines not directly related to geotechnical engineering.展开更多
文摘The large thermal cutting equipment——The DHG. CNC numerical control plasma cutting machine is produced by The Ha’erbin Welding & Cutting Equipment Co. It specializes in the precise formation and baiting of nonferrous boards and thin carbon steel plates at a high speed. It avoids the disadvantage of flame cutting, which cannot cut nonferrous and thin steel plates.
文摘In order to control cutting force and its direction i n milling operation, a new milling head was developed. The head has two milling cutters, which are connected by a pair of gears and rotate in opposite direction respectively. Both up-cut and down-cut can be carried out simultaneously by t hese milling cutters. The each depth of cut, the ratio of up/down cutting depth , by these cutters can be also selected. The cutting force characteristics were experimentally discussed by changing the ratio. The cutting force and its locus can be also changed by the selection of the ratio of up/down cutting depth. For practical usage of the head the analytical prediction method of the cutting forc e characteristics under selected cutting condition was proposed based on the ene rgy approach method proposed, in which both of cutting force characteristics of a single milling cutter and the combined milling cutter under a selected up/dow n cutting depth ratio were analytically estimated based on the two dimensional c utting data. It was experimentally shown that in NC milling machine the cutting force locus was controlled in pre-determined direction under various tool paths .
文摘This paper analyses the fragmenting principle of static blasting agent (SBA) and the action of its cutting fragmentation. Using SBA for sterming material proved very useful and advantageous. Here we analyse in detail the cutting action of pre- stress and stress wave in pre-stressing force blasting.
文摘A mathematical model of the computer numerical control (CNC) heavy cuttingservo system including chatter in cutting courses was constructed for the chatter in CNC heavycutting. The theoretical analysis, computer simulation and orthogonal tests on this model show thatincreasing the gain of position K_(pp) can improve the rapid tracking performance of machine tools,and decreasing the delay time of speed loop τ_s can quickly eliminate the static error in thesystem, but the limited cutting width b_(lim) will descend correspondingly; excessively large orexcessively small gain of speed loop K_(ps) can result in decreasing b_(lim); optimizing K_(pp),τ_s and K_(ps) can improve the dynamic and static performance of the system and increase b_(lim).It is easy and feasible to optimize the servo parameters by the orthogonal test. This method caneffectively improve the system's stability and limited cutting width and it is suitable for the CNCheavy cutting of heavy-duty machine tools.
文摘In this paper, by in-depth geological research of Kalamkas Oilfield in Central Asia, the geological body has been re-ascertained; combined with fine study of reservoir engineering, based on the understanding of the distribution of remaining oil horizontal wells have been given full play to stabilizing oil production and controlling water cut, reducing the producing pressure drop, improving well productivity and other advantages, and the development and deployment has been optimized; horizontal wells have been applied to solve problems such as old well casing damages, shutting down wells, low-productivity and low- efficiency wells, and high water cut wells to improve the utilization rate of old wells; through separate layer system improved injection production pattern, adjustment wells have been optimized and deployed, and part measures wells have been preferably selected to tap the residual oil improve the degree of reserves control realize the stabilization of oil production and control of water cut in an old oilfield, and further improve the development effects.
基金Financial supports are from the National Natural Science Foundation of China (No. 50874104)the Scientific Research Industrialization Project of Jiangsu Universities (No. JH07-023)
文摘Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pre- stressed bolting theory was used to design a roof control method for a large span roadway. By reducing the span and applying equal strength coordinated supports the rock could be stabilized. The control prin- ciples and methods are given herein along with the analysis. A double micro arch cross section roadway is defined and its use in solving the current problem is described. Beam arch theory was used to build a model of the double micro arch cross section roadway. A support reverse force model for the arch foot intersection was also derived. A support method based upon reducing the width of the large span in the cut hole is presented. These results show that the reduced span of the roadway roof plus the use of cable anchors and single supports gives an effective way to control the large span cut hole. On site monitoring showed that the reduced span support from the double micro arch cross section roadway design had a significant effect. The roadway surface displacement was small and harmful deformation of the cut hole was effectively controlled. This will ensure its long term stability.
基金support by the National Natural Science Foundation of China (No. 41372324)support from the Chinese Special Funds for Major State Basic Research Project under Grant No. 2010CB732001
文摘The new Austrian tunneling method (NATM) is widely applied in design and construction of underground engineering projects. When the type and distribution of unfavorable geological bodies (UGBs) associated with their influences on geoengineering are complicated or unfortunately are overlooked, we should pay more attentions to internal features of rocks grades IV and V (even in local but mostly controlling zones). With increasing attentions to the characteristics, mechanism and influences of engineering construction-triggered geohazards, it is crucial to fully understand the disturbance of these geohazards on project construction. A reasonable determination method in construction procedure, i.e. the shape of working face, the type of engineering support and the choice of feasible procedure, should be considered in order to mitigate the construction-triggered geohazards. Due to their high sensitivity to groundwater and in-situ stress, various UGBs exhibit hysteretic nature and failure modes. To give a complete understanding on the internal causes, the emphasis on advanced comprehensive geological forecasting and overall reinforcement treatment is therefore of more practical significance. Compre- hensive evaluation of influential factors, identification of UGB, and measures of discontinuity dynamic controlling comprises the geoengineering condition evaluation and dynamic controlling method. In a case of a cut slope, the variations of UGBs and the impacts of key environmental factors are presented, where more severe construction-triggered geohazards emerged in construction stage than those predicted in design and field investigation stages. As a result, the weight ratios of different influential factors with respect to field investigation, design and construction are obtained.
基金provided by the National High Technology Research and Development Program of China(No.2012AA062100)the Program for New Century Excellent Talents in University of China(No.NCET-10-0770)
文摘In order to determine the influence of shearer's cutting and neighboring shields' advance on the support resistance variation, leg pressure data of all 235 shields in the panel LW61 of Cumberland coal mine were analyzed. The results show that the relationship between the leg pressure increment and the distance from shield to front drum of shearer is a quadratic function and that the higher leg pressure increment before shield advance tends to be related to adverse roof conditions. In addition, the three proposed leg pressure increment-related parameters and the three traditional parameters(time-weighted average pressure, setting pressure, and final pressure) of approximately 32000 shield supporting cycles were calculated by a self-developed software package to analyze the correlation between them. The results show that there is a powerful connection between them, and that the three proposed leg pressure increment-related parameters could be used as the indexes to evaluate the interaction between shields and the roof, and to identify the periodic weighting.
文摘On the tasis of study in the mathematical model of 3-dimensional ruled surface (RS),this paper introduces a new concept of distance paramcter (DP) and also puts forward that themethod of modeling a RS depends on not only two boundary curves but also DP. According toabove theory, the formulas to calculate corresponding point coordinates to any kind of top and bot-tom profile of a workpiece and formulas to calcuate the maximum inclination angle of ruling linehave been obtained. Then a different top and bottom RS mathining method including profile withline-are combination as well as parametric curves has been achieved by 4-axes simultancous con-trol programming proposed.
文摘There are a number of geotechnical systems used at open cut operations of Anglo American's Metallurgical Coal business unit in Australia. These systems are mainly mine site specific, based on geological information and used as hazard plans. They are qualitative and reliant upon the experienced judgement of site based engineers and the general workforce. They are not suitable for calculating the associated risks of geological structures and mining responses. A uniform risk rating system that can be used to provide an unbiased, standard and quantifiable assessment of the risk from highwall and lowwall failures is therefore developed using the experience gained with such systems in Anglo American's South African operations. This system is a semi-quantitative risk rating system and takes into account the relative differences in the importance of hazards as experienced at each mine site as a result of different combinations of geotechnical factors and mining conditions. It is based on critical geotechnical and other parameters that have been identified by site mining engineers, geologists and geotechnical engineers. The primary advantage of this risk rating system is that all open cut mines in the Anglo American's Metallurgical Coal operations use a near identical system, which enables the user to compare the risk after each blast and with other mines. The system can be adjusted to meet local mine specific requirements. The implementation of this system, a computer program that automatically calculates the risks and recommends predetermined controls, has been made as practical and as easy to use as possible. This program can be used by personnel from other mining disciplines not directly related to geotechnical engineering.