AIM To report on a more accurate diagnostic possibility offered by endoscopic ultrasound-guided cutting of holes and deep biopsy (EUS-CHDB) for pathologic diagnosis of gastric infiltrative tumors and gastrointestinal ... AIM To report on a more accurate diagnostic possibility offered by endoscopic ultrasound-guided cutting of holes and deep biopsy (EUS-CHDB) for pathologic diagnosis of gastric infiltrative tumors and gastrointestinal submucosal tumors. METHODS Ten consecutive patients who were suspected of having gastric invasive tumors or gastrointestinal submucosal tumors underwent EUS-CHDB with a novel vertical diathermic loop. We reviewed their medical data and analysed the effectiveness and safety of this new method. The final diagnosis was based on the surgical pathology or clinical/imaging follow-up. RESULTS EUS-CHDB was performed successfully in all the ten patients. Neither severe haemorrhage nor perforation occurred in any patient. Among the ten patients, there were three cases of gastric linitis plastica, one case of gastric lymphoma, five cases of gastrointestinal stromal tumors (GISTs), and only one case of chronic non-atrophic gastritis. That is, nine (90%) of the cases CONCLUSION EUS-CHDB may be a technically feasible and safe option for patients with gastric infiltrative tumors or gastrointestinal submucosal tumors. EUS-CHDB may be used as a remedial or even preferred biopsy method for submucosal lesions. 展开更多
关键词 Endoscopic ultrasound cutting holes Deep biopsy Vertical diathermic loop Gastric linitis plastica Gastrointestinal submucosal tumors
下载PDF
Mechanism and practice of rock control in deep large span cut holes 被引量:2
2
作者 Li Chong Xu Jinhai +2 位作者 Fu Chunsheng Wu Rui Ma Qianqian 《Mining Science and Technology》 EI CAS 2011年第6期891-896,共6页
Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pr... Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pre- stressed bolting theory was used to design a roof control method for a large span roadway. By reducing the span and applying equal strength coordinated supports the rock could be stabilized. The control prin- ciples and methods are given herein along with the analysis. A double micro arch cross section roadway is defined and its use in solving the current problem is described. Beam arch theory was used to build a model of the double micro arch cross section roadway. A support reverse force model for the arch foot intersection was also derived. A support method based upon reducing the width of the large span in the cut hole is presented. These results show that the reduced span of the roadway roof plus the use of cable anchors and single supports gives an effective way to control the large span cut hole. On site monitoring showed that the reduced span support from the double micro arch cross section roadway design had a significant effect. The roadway surface displacement was small and harmful deformation of the cut hole was effectively controlled. This will ensure its long term stability. 展开更多
关键词 Deep large span cut hole Double micro arch cross-section roadway Roof control by cross cut Equal strength coordinated support
下载PDF
Influence of delay interval on blasting efficiency of parallel hole cuts with an empty hole
3
作者 QiZhang DachaoLin 《Journal of University of Science and Technology Beijing》 CSCD 2003年第4期12-15,共4页
Time interval of short delay ignition is an important factor to affect theefficiency of blasting cuts. The motion process of rock pieces in the cut cavity is analyzed, amechanical model to calculate the delay time of ... Time interval of short delay ignition is an important factor to affect theefficiency of blasting cuts. The motion process of rock pieces in the cut cavity is analyzed, amechanical model to calculate the delay time of parallel hole cuts is presented for tunnel blasting,and a theoretical method to determine the volume ratio (the clearage rate) of the rock pieceswithin the cut cavity at different moments is proposed for the blasting cut with an empty hole.Numerical analysis results show that the optimal delay interval is proportional to the boreholedepth. The suggested results are of practical value to the optimal design of the delay interval inmillisecond blasting related to the parallel hole cuts with an empty hole. 展开更多
关键词 tunnel blasting millisecond blasting parallel hole cuts rock fragmentation