Modified Shifting Bottleneck Heuristic for Scheduling Problems of Large-Scale Job Shops
1
作者 ZHOU Bing-hai PENG Tao 《Journal of Donghua University(English Edition)》 EI CAS 2016年第6期883-887,共5页
A modified shifting bottleneck algorithm was proposed to solve scheduling problems of a large-scale job shop.Firstly,a new structured algorithm was employed for sub-problems so as to reduce the computational burden an... A modified shifting bottleneck algorithm was proposed to solve scheduling problems of a large-scale job shop.Firstly,a new structured algorithm was employed for sub-problems so as to reduce the computational burden and suit for large-scale instances more effectively.The modified cycle avoidance method,incorporating with the disjunctive graph model and topological sort algorithm,was applied to guaranteeing the feasibility of solutions with considering delayed precedence constraints.Finally,simulation experiments were carried out to verify the feasibility and effectiveness of the modified method.The results demonstrate that the proposed algorithm can solve the large-scale job shop scheduling problems(JSSPs) within a reasonable period of time and obtaining satisfactory solutions simultaneously. 展开更多
关键词 shifting bottleneck algorithm large-scale job shop scheduling disjunctive graph model delayed precedence constraint(DPC) cycle avoidance method
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部