Motion state of ship out of control in bridge area was analyzed.Motion procedure after losing control was divided into two steps.One is drift step within stopping period.The other is drift step without inertia,which i...Motion state of ship out of control in bridge area was analyzed.Motion procedure after losing control was divided into two steps.One is drift step within stopping period.The other is drift step without inertia,which is induced by wind and current.Mathematical model for motion of ship out of control,considering wind-induced drift,current-induced drift,stopping ability,etc.,was established.Dangerous collision areas for main pier and auxiliary piers were analyzed according to different calculation conditions.展开更多
确定桥区水域范围是保证通航船舶和桥梁安全的一个重要因素,但是目前国内外对于如何划分桥区水域的大小并没有明确的标准。以港珠澳大桥为研究对象,从桥梁的有效航宽、拖轮施救时间和船舶失控危险区域三个方面计算了桥区水域尺度。通过...确定桥区水域范围是保证通航船舶和桥梁安全的一个重要因素,但是目前国内外对于如何划分桥区水域的大小并没有明确的标准。以港珠澳大桥为研究对象,从桥梁的有效航宽、拖轮施救时间和船舶失控危险区域三个方面计算了桥区水域尺度。通过对各种工况的计算比较,得出港珠澳段桥区水域尺度为桥梁两侧各2 n mile。展开更多
基金Supported by Disaster Reduction Foundation of Large Complex Project for Sutong Bridge(No.2006BAG04B06)
文摘Motion state of ship out of control in bridge area was analyzed.Motion procedure after losing control was divided into two steps.One is drift step within stopping period.The other is drift step without inertia,which is induced by wind and current.Mathematical model for motion of ship out of control,considering wind-induced drift,current-induced drift,stopping ability,etc.,was established.Dangerous collision areas for main pier and auxiliary piers were analyzed according to different calculation conditions.