High geostress,a typical attribute of tunnels located at significant depths,is crucial in causing stress-induced failure and influencing the stability of the tunnel crown.This study developed an analytical method for ...High geostress,a typical attribute of tunnels located at significant depths,is crucial in causing stress-induced failure and influencing the stability of the tunnel crown.This study developed an analytical method for the failure mechanism that occurs in deep-buried tunnel roofs,taking into account the influence of geostress.The limit analysis theory was utilized for deriving analytical solutions about the geometry of the collapsing surface and the limit supporting pressure.The collapsing surface obtained by the analytical solution was validated by the findings of the physical model test,which shows a high level of agreement with the actual one.An extensive investigation was done to explore the effects of the lateral pressure coefficients,the tunnel buried depth,the geological conditions of the surrounding rock,the long-short axis ratio,and the size of the tunnel profile.The findings indicate that an increase in the lateral pressure coefficient from 0.5 to 1.5 results in a reduction in the height of the collapsing zone by 2.08 m and the width of the collapsing zone by 1.15 m,while simultaneously increases the limit supporting pressure by 18.9%.The proposed upper bound method accurately determines the limit supporting pressure and the geometry of the collapsing surface,which aligns well with the results acquired through numerical modelling and on-site monitoring in actual engineering applications.The proposed analytical method can serve as a reference for similar crown failure issues of deep-buried tunnels.展开更多
A Fisher discriminant analysis (FDA) model for the prediction of classification of rockburst in deep-buried long tunnel was established based on the Fisher discriminant theory and the actual characteristics of the p...A Fisher discriminant analysis (FDA) model for the prediction of classification of rockburst in deep-buried long tunnel was established based on the Fisher discriminant theory and the actual characteristics of the project. First, the major factors of rockburst, such as the maximum tangential stress of the cavern wall σθ, uniaxial compressive strength σc, uniaxial tensile strength or, and the elastic energy index of rock Wet, were taken into account in the analysis. Three factors, Stress coefficient σθ/σc, rock brittleness coefficient σc/σt, and elastic energy index Wet, were defined as the criterion indices for rockburst prediction in the proposed model. After training and testing of 12 sets of measured data, the discriminant functions of FDA were solved, and the ratio of misdiscrimina- tion is zero. Moreover, the proposed model was used to predict rockbursts of Qinling tunnel along Xi'an-Ankang railway. The results show that three forecast results are identical with the actual situation. Therefore, the prediction accuracy of the FDA model is acceptable.展开更多
Due to the existence of a large number of discontinuous fractures and interfaces in tunnel surrounding rocks,the groundwater inflow into tunnel generally presents significant anisotropy.Therefore,it is of great signif...Due to the existence of a large number of discontinuous fractures and interfaces in tunnel surrounding rocks,the groundwater inflow into tunnel generally presents significant anisotropy.Therefore,it is of great significance to consider the anisotropic permeability when dealing with water gushing-induced engineering accidents in water-rich mountain tunnels with large burial depth.In this study,based on the complex variable method and the seepage flow theory,a theoretical model of water inflow into a deep-buried circular tunnel in a fully saturated,anisotropic and semi-infinite aquifer is developed.The influence of grouted zone,initial support and secondary lining is fully considered.By comparison to the existing analytical methods and numerical results,the reliability of this proposed analytical solution is well validated.It is indicated from the parametric study that the groundwater inflow into tunnel presents an upward trend with an increasing value of the strata permeability in the vertical direction.Moreover,the water inflow rate and the total water head decrease with the growth of the thickness of grouting circle.It is suggested that reasonable grouting thickness and permeability should be controlled to enhance the grouting effect.This study provides a practical method for estimating the water inflow into a deep-buried,grouted and lined mountain tunnel considering the anisotropic strata permeability.展开更多
When every parameter is properly scaled down in accordance with some similarity coefficients, it is possible to study the physical-mechanical properties of rock mass with a scale model. To identify the key mechanisms ...When every parameter is properly scaled down in accordance with some similarity coefficients, it is possible to study the physical-mechanical properties of rock mass with a scale model. To identify the key mechanisms of soft rock in deep buried tunnels, the proper sand, binder and ratio were selected. During the process, the model manufacture technology was introduced and typical tests were done and the results were presented. The physical and meehanieal properties effects caused by each composition were discussed. It is shown that the physical and mechanical properties of chosen ratio material such as uniaxial compressive strength tests, elasticity modulus, tensile strength, internal frictional angle, and Poisson's ratio meet with similarity relationship well. The physical and mechanical properties of deep soft rock are simulated successfully.展开更多
Complex weak structural planes and fault zones induce significant heterogeneity,discontinuity,and nonlinear characteristics of a rock mass.When an earthquake occurs,these characteristics lead to extremely complex seis...Complex weak structural planes and fault zones induce significant heterogeneity,discontinuity,and nonlinear characteristics of a rock mass.When an earthquake occurs,these characteristics lead to extremely complex seismic wave propagation and vibrational behaviors and thus pose a huge threat to the safety and stability of deep buried tunnels.To investigate the wave propagation in a rock mass with different structural planes and fault zones,this study first introduced the theory of elastic wave propagation and elastodynamic principles and used the Zoeppritz equation to describe wave field decomposition and develop a seismic wave response model accordingly.Then,a physical wave propagation model was constructed to investigate seismic waves passing through a fault,and dynamic damage was analyzed by using shaking table tests.Finally,stress wave attenuation and dynamic incompatible deformation mechanisms in a rock mass with fault zones were explored.The results indicate that under the action of weak structural planes,stress waves appear as a complex wave field decomposition phenomenon.When a stress wave spreads to a weak structural plane,its scattering may transform into a tensile wave,generating tensile stress and destabilizing the rock mass;wave dynamic energy is absorbed by a low-strength rock through wave scattering,which significantly weakens the seismic load.Wave propagation accelerates the initiation and expansion of internal defects in the rock mass and leads to a dynamic incompatible deformation.This is one of the main causes for large deformation and even instability within rock masses.These findings provide an important reference and guide with respect to stability analysis of rock mass with weak structural planes and fault zones.展开更多
The prediction of the stress field of deep-buried tunnels is a fundamental problem for scientists and engineers. In this study, the authors put forward a systematic solution for this problem. Databases from the World ...The prediction of the stress field of deep-buried tunnels is a fundamental problem for scientists and engineers. In this study, the authors put forward a systematic solution for this problem. Databases from the World Stress Map and the Crustal Stress of China, and previous research findings can offer prediction of stress orientations in an engineering area. At the same time, the Andersonian theory can be used to analyze the possible stress orientation of a region. With limited in-situ stress measurements, the Hock-Brown Criterion can be used to estimate the strength of rock mass in an area of interest by utilizing the geotechnical investigation data, and the modified Sheorey's model can subsequently be employed to predict the areas' stress profile, without stress data, by taking the existing in-situ stress measurements as input parameters. In this paper, a case study was used to demonstrate the application of this systematic solution. The planned Kohala hydropower plant is located on the western edge of Qinghai-Tibet Plateau. Three hydro-fracturing stress measurement campaigns indicated that the stress state of the area is SH - Sh 〉 Sv or SH 〉Sv 〉 Sh. The measured orientation of Sn is NEE (N70.3°-89°E), and the regional orientation of SH from WSM is NE, which implies that the stress orientation of shallow crust may be affected by landforms. The modified Sheorey model was utilized to predict the stress profile along the water sewage tunnel for the plant. Prediction results show that the maximum and minimum horizontal principal stres- ses of the points with the greatest burial depth were up to 56.70 and 40.14 MPa, respectively, and the stresses of areas with a burial depth of greater than 500 m were higher. Based on the predicted stress data, large deformations of the rock mass surrounding water conveyance tunnels were analyzed. Results showed that the large deformations will occur when the burial depth exceeds 300 m. When the burial depth is beyond 800 m, serious squeezing deformations will occur in the surrounding rock masses, thus requiring more attention in the design and construction. Based on the application efficiency in this case study, this prediction method proposed in this paper functions accurately.展开更多
The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the...The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the organization of the construction activities in the small and confined area,the horizontal transportation for shield boring and high safety management requirements.A super-long invert lining construction jumbo,as well as the matching California switch,is developed,which provides solution for the confliction between the invert lining construction and the horizontal transportation.The procedure and method for the synchronous operation of the shield boring and the secondary lining are developed by referring to the synchronous construction of the secondary lining during the boring of the TBMs in hard rocks.Due to the adoption of the synchronous operation of the shield boring and the secondary lining,the construction period is shortened and the construction cost is reduced.The paper can provide reference for the synchronous construction of the secondary lining in similar projects in the future.展开更多
基金supported partially by the National Natural Science Foundation of China(42277158,41972277,and U1934212)。
文摘High geostress,a typical attribute of tunnels located at significant depths,is crucial in causing stress-induced failure and influencing the stability of the tunnel crown.This study developed an analytical method for the failure mechanism that occurs in deep-buried tunnel roofs,taking into account the influence of geostress.The limit analysis theory was utilized for deriving analytical solutions about the geometry of the collapsing surface and the limit supporting pressure.The collapsing surface obtained by the analytical solution was validated by the findings of the physical model test,which shows a high level of agreement with the actual one.An extensive investigation was done to explore the effects of the lateral pressure coefficients,the tunnel buried depth,the geological conditions of the surrounding rock,the long-short axis ratio,and the size of the tunnel profile.The findings indicate that an increase in the lateral pressure coefficient from 0.5 to 1.5 results in a reduction in the height of the collapsing zone by 2.08 m and the width of the collapsing zone by 1.15 m,while simultaneously increases the limit supporting pressure by 18.9%.The proposed upper bound method accurately determines the limit supporting pressure and the geometry of the collapsing surface,which aligns well with the results acquired through numerical modelling and on-site monitoring in actual engineering applications.The proposed analytical method can serve as a reference for similar crown failure issues of deep-buried tunnels.
基金Supported by the National 11th Five-Year Science and Technology Supporting Plan of China(2006BAB02A02)Central South University Innovation funded projects (2009ssxt230, 2009ssxt234)
文摘A Fisher discriminant analysis (FDA) model for the prediction of classification of rockburst in deep-buried long tunnel was established based on the Fisher discriminant theory and the actual characteristics of the project. First, the major factors of rockburst, such as the maximum tangential stress of the cavern wall σθ, uniaxial compressive strength σc, uniaxial tensile strength or, and the elastic energy index of rock Wet, were taken into account in the analysis. Three factors, Stress coefficient σθ/σc, rock brittleness coefficient σc/σt, and elastic energy index Wet, were defined as the criterion indices for rockburst prediction in the proposed model. After training and testing of 12 sets of measured data, the discriminant functions of FDA were solved, and the ratio of misdiscrimina- tion is zero. Moreover, the proposed model was used to predict rockbursts of Qinling tunnel along Xi'an-Ankang railway. The results show that three forecast results are identical with the actual situation. Therefore, the prediction accuracy of the FDA model is acceptable.
基金financially supported by the National Natural Science Foundation High Speed Railway Joint Fund of China(No.U1734205)the Open Research Fund Project of Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University(No.KLETJGE-B2104)。
文摘Due to the existence of a large number of discontinuous fractures and interfaces in tunnel surrounding rocks,the groundwater inflow into tunnel generally presents significant anisotropy.Therefore,it is of great significance to consider the anisotropic permeability when dealing with water gushing-induced engineering accidents in water-rich mountain tunnels with large burial depth.In this study,based on the complex variable method and the seepage flow theory,a theoretical model of water inflow into a deep-buried circular tunnel in a fully saturated,anisotropic and semi-infinite aquifer is developed.The influence of grouted zone,initial support and secondary lining is fully considered.By comparison to the existing analytical methods and numerical results,the reliability of this proposed analytical solution is well validated.It is indicated from the parametric study that the groundwater inflow into tunnel presents an upward trend with an increasing value of the strata permeability in the vertical direction.Moreover,the water inflow rate and the total water head decrease with the growth of the thickness of grouting circle.It is suggested that reasonable grouting thickness and permeability should be controlled to enhance the grouting effect.This study provides a practical method for estimating the water inflow into a deep-buried,grouted and lined mountain tunnel considering the anisotropic strata permeability.
基金Supported by the New Century Excellent Talent Foundation from MOE of China(NCET-09-0844) the National Natural Science Foundation of China (50804060, 50921063)
文摘When every parameter is properly scaled down in accordance with some similarity coefficients, it is possible to study the physical-mechanical properties of rock mass with a scale model. To identify the key mechanisms of soft rock in deep buried tunnels, the proper sand, binder and ratio were selected. During the process, the model manufacture technology was introduced and typical tests were done and the results were presented. The physical and meehanieal properties effects caused by each composition were discussed. It is shown that the physical and mechanical properties of chosen ratio material such as uniaxial compressive strength tests, elasticity modulus, tensile strength, internal frictional angle, and Poisson's ratio meet with similarity relationship well. The physical and mechanical properties of deep soft rock are simulated successfully.
基金Fundamental Research Funds for the Central Universities,Grant/Award Number:B220202058National Natural Science Foundation of China,Grant/Award Number:41831278+1 种基金National Basic Research Program of China(973 Program),Grant/Award Number:2015CB057903ARC Future Fellowship,Grant/Award Number:FT140100019。
文摘Complex weak structural planes and fault zones induce significant heterogeneity,discontinuity,and nonlinear characteristics of a rock mass.When an earthquake occurs,these characteristics lead to extremely complex seismic wave propagation and vibrational behaviors and thus pose a huge threat to the safety and stability of deep buried tunnels.To investigate the wave propagation in a rock mass with different structural planes and fault zones,this study first introduced the theory of elastic wave propagation and elastodynamic principles and used the Zoeppritz equation to describe wave field decomposition and develop a seismic wave response model accordingly.Then,a physical wave propagation model was constructed to investigate seismic waves passing through a fault,and dynamic damage was analyzed by using shaking table tests.Finally,stress wave attenuation and dynamic incompatible deformation mechanisms in a rock mass with fault zones were explored.The results indicate that under the action of weak structural planes,stress waves appear as a complex wave field decomposition phenomenon.When a stress wave spreads to a weak structural plane,its scattering may transform into a tensile wave,generating tensile stress and destabilizing the rock mass;wave dynamic energy is absorbed by a low-strength rock through wave scattering,which significantly weakens the seismic load.Wave propagation accelerates the initiation and expansion of internal defects in the rock mass and leads to a dynamic incompatible deformation.This is one of the main causes for large deformation and even instability within rock masses.These findings provide an important reference and guide with respect to stability analysis of rock mass with weak structural planes and fault zones.
基金provided by the National Natural Science Foundation of China – China (No. 41274100)the Fundamental Research Fund for State Level Scientific Institutes (No. ZDJ2012-20)
文摘The prediction of the stress field of deep-buried tunnels is a fundamental problem for scientists and engineers. In this study, the authors put forward a systematic solution for this problem. Databases from the World Stress Map and the Crustal Stress of China, and previous research findings can offer prediction of stress orientations in an engineering area. At the same time, the Andersonian theory can be used to analyze the possible stress orientation of a region. With limited in-situ stress measurements, the Hock-Brown Criterion can be used to estimate the strength of rock mass in an area of interest by utilizing the geotechnical investigation data, and the modified Sheorey's model can subsequently be employed to predict the areas' stress profile, without stress data, by taking the existing in-situ stress measurements as input parameters. In this paper, a case study was used to demonstrate the application of this systematic solution. The planned Kohala hydropower plant is located on the western edge of Qinghai-Tibet Plateau. Three hydro-fracturing stress measurement campaigns indicated that the stress state of the area is SH - Sh 〉 Sv or SH 〉Sv 〉 Sh. The measured orientation of Sn is NEE (N70.3°-89°E), and the regional orientation of SH from WSM is NE, which implies that the stress orientation of shallow crust may be affected by landforms. The modified Sheorey model was utilized to predict the stress profile along the water sewage tunnel for the plant. Prediction results show that the maximum and minimum horizontal principal stres- ses of the points with the greatest burial depth were up to 56.70 and 40.14 MPa, respectively, and the stresses of areas with a burial depth of greater than 500 m were higher. Based on the predicted stress data, large deformations of the rock mass surrounding water conveyance tunnels were analyzed. Results showed that the large deformations will occur when the burial depth exceeds 300 m. When the burial depth is beyond 800 m, serious squeezing deformations will occur in the surrounding rock masses, thus requiring more attention in the design and construction. Based on the application efficiency in this case study, this prediction method proposed in this paper functions accurately.
文摘The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the organization of the construction activities in the small and confined area,the horizontal transportation for shield boring and high safety management requirements.A super-long invert lining construction jumbo,as well as the matching California switch,is developed,which provides solution for the confliction between the invert lining construction and the horizontal transportation.The procedure and method for the synchronous operation of the shield boring and the secondary lining are developed by referring to the synchronous construction of the secondary lining during the boring of the TBMs in hard rocks.Due to the adoption of the synchronous operation of the shield boring and the secondary lining,the construction period is shortened and the construction cost is reduced.The paper can provide reference for the synchronous construction of the secondary lining in similar projects in the future.