This paper presents a novel precision delay circuit design for high-speed data acquisition systems. Many studies have suggested that various advanced electronic measurement apparatuses require that the delay circuit s...This paper presents a novel precision delay circuit design for high-speed data acquisition systems. Many studies have suggested that various advanced electronic measurement apparatuses require that the delay circuit should have a high precision and a short delay interval. Practically, however, such measurement apparatuses are low in preci- sion and long in delay interval at present. The structure and function of a data acquisition system is introduced first; then the principle of ramp-based precision delay circuits and the digitally programmable delay generator is studied and the precision delay circuit is designed. The authors also demonstrated 8-bit programmable delay circuits with a timing pre- cision of 10 ps. Therefore the programmable precision delay circuit here presented has a higher precision, shorter inter- val and more detectable function than any other precision delay circuit.展开更多
A generalized simulation method of the tracking,telemetry and control(TT&C) channel,which is applicable to wideband and arbitrary radio frequency(RF) signal,is proposed.It can accurately simulate the dynamic tran...A generalized simulation method of the tracking,telemetry and control(TT&C) channel,which is applicable to wideband and arbitrary radio frequency(RF) signal,is proposed.It can accurately simulate the dynamic transmission delay of the arbitrary RF signal in channels,especially regardless of any prior knowledge including signal form,signal parameters,and so on.The proposed method orthogonally demodulates the wideband and arbitrary RF signal to complex baseband by a known local oscillator(LO) signal.Whereafter,it takes measures to obtain the delay reconstruction signal of baseband signals based on the dynamic transmission delay between a ground station and a responder.Meanwhile,it manages to obtain the delay reconstruction signal of LO signals.The simulation output signal(the delayed RF signal) can be achieved through the synthesis of the two delay reconstruction signals mentioned above.The principle and its related key technology are described in detail,and the realizable system architecture is given.展开更多
The mining area deformation monitoring theory and method using precise point positioning (PPP) ambi- guity resolution (AR) were studied, and an ambiguity fixing model with satellite and receiver combina- tion phas...The mining area deformation monitoring theory and method using precise point positioning (PPP) ambi- guity resolution (AR) were studied, and an ambiguity fixing model with satellite and receiver combina- tion phase delay (CPD) was proposed for zero-differenced PPP ambiguity fixing and its corresponding formula derivation was given. The data processing results for I h at six IGS stations in China show that 93% of ambiguities can be fixed within 10 min and all ambiguities can be fixed within 15 min. After ambi- guity fixing, the positioning accuracy is improved by more than 85% in the E and N directions, with abso- lute positioning accuracy reaching millimeter level, and it was improved by 70% in the U direction, reaching centimeter level; the proposed zero-differenced ambiguity fixing model can effectively improve the convergence rate and positioning accuracy in PPP. Data monitoring continuously conducted for half a year at four COPS stations of Shanxi China Coal Pingshuo Group validated the feasibility of using PPP in mining area deformation monitoring.展开更多
文摘This paper presents a novel precision delay circuit design for high-speed data acquisition systems. Many studies have suggested that various advanced electronic measurement apparatuses require that the delay circuit should have a high precision and a short delay interval. Practically, however, such measurement apparatuses are low in preci- sion and long in delay interval at present. The structure and function of a data acquisition system is introduced first; then the principle of ramp-based precision delay circuits and the digitally programmable delay generator is studied and the precision delay circuit is designed. The authors also demonstrated 8-bit programmable delay circuits with a timing pre- cision of 10 ps. Therefore the programmable precision delay circuit here presented has a higher precision, shorter inter- val and more detectable function than any other precision delay circuit.
基金supported by the Foundation of Shanghai Aerospace Science and Technology(20120541088)
文摘A generalized simulation method of the tracking,telemetry and control(TT&C) channel,which is applicable to wideband and arbitrary radio frequency(RF) signal,is proposed.It can accurately simulate the dynamic transmission delay of the arbitrary RF signal in channels,especially regardless of any prior knowledge including signal form,signal parameters,and so on.The proposed method orthogonally demodulates the wideband and arbitrary RF signal to complex baseband by a known local oscillator(LO) signal.Whereafter,it takes measures to obtain the delay reconstruction signal of baseband signals based on the dynamic transmission delay between a ground station and a responder.Meanwhile,it manages to obtain the delay reconstruction signal of LO signals.The simulation output signal(the delayed RF signal) can be achieved through the synthesis of the two delay reconstruction signals mentioned above.The principle and its related key technology are described in detail,and the realizable system architecture is given.
基金Financial support from the National Natural Science Foundation of China (No. 41074010)the Jiangsu Innovation Works Fund of Postgraduate (No. CXZZ11-0299)the Project Funded by the Priority Academic Program Development of Jiangsu Higher Education Institutions (PAPD)
文摘The mining area deformation monitoring theory and method using precise point positioning (PPP) ambi- guity resolution (AR) were studied, and an ambiguity fixing model with satellite and receiver combina- tion phase delay (CPD) was proposed for zero-differenced PPP ambiguity fixing and its corresponding formula derivation was given. The data processing results for I h at six IGS stations in China show that 93% of ambiguities can be fixed within 10 min and all ambiguities can be fixed within 15 min. After ambi- guity fixing, the positioning accuracy is improved by more than 85% in the E and N directions, with abso- lute positioning accuracy reaching millimeter level, and it was improved by 70% in the U direction, reaching centimeter level; the proposed zero-differenced ambiguity fixing model can effectively improve the convergence rate and positioning accuracy in PPP. Data monitoring continuously conducted for half a year at four COPS stations of Shanxi China Coal Pingshuo Group validated the feasibility of using PPP in mining area deformation monitoring.