The main problem existing in Guangdong electric power sources is analyzed in this paper. Based on theanalysis on energy-supply features, power demand and the technical and economic performances of various powersource...The main problem existing in Guangdong electric power sources is analyzed in this paper. Based on theanalysis on energy-supply features, power demand and the technical and economic performances of various powersources in Guangdong, the power sources construction scale and its structure are studied and analyzed in detail byusing Generation Expansion Software Package (GESP). The future development of Guangdong electric power sourcesunder the new situation of "Power from West to East" is studied as well.[展开更多
This paper introduces the energy consumption status in China, elaborate the affects of the unreasonable energy consumption structure on energy environment and sustainable development of economy. Simultaneously, it poi...This paper introduces the energy consumption status in China, elaborate the affects of the unreasonable energy consumption structure on energy environment and sustainable development of economy. Simultaneously, it points out the solution, i.e., to implement integrated resources planning (IRP)/demand side management (DSM), and gives some recommendations on the way of implementing IRP/DSM.展开更多
文摘The main problem existing in Guangdong electric power sources is analyzed in this paper. Based on theanalysis on energy-supply features, power demand and the technical and economic performances of various powersources in Guangdong, the power sources construction scale and its structure are studied and analyzed in detail byusing Generation Expansion Software Package (GESP). The future development of Guangdong electric power sourcesunder the new situation of "Power from West to East" is studied as well.[
文摘This paper introduces the energy consumption status in China, elaborate the affects of the unreasonable energy consumption structure on energy environment and sustainable development of economy. Simultaneously, it points out the solution, i.e., to implement integrated resources planning (IRP)/demand side management (DSM), and gives some recommendations on the way of implementing IRP/DSM.