A compact laser plasma accelerator that is a novel accelerator based on the interaction of ultra-intense laser and plasmas is being built now at Peking University. According to the results of experiments and numerical...A compact laser plasma accelerator that is a novel accelerator based on the interaction of ultra-intense laser and plasmas is being built now at Peking University. According to the results of experiments and numerical simulations, a beam line combining the advantages of quadrupole and analyzing magnets is designed to deliver proton beams with energy ranging from 1 to 44MeV, energy spread within ±5% and 10^6-8 protons per pulse. It turns out that the existence of space charge force of protons can be ignored for the increase of transverse and longitudinal envelopes even in the case of 10^9 protons in one pulse. To cope with the challenge to obtain a uniform distribution of protons at the final experiment target in laser acceleration, we manipulate the envelope beam waist in the Y direction to a proper position and obtain a relatively good distribution uniformity of protons with an energy spread of 0-±5%0.展开更多
Reconfigurable products and manufacturing systems have enabled manufacturers to provide "cost effective" variety to the market. In spite of these new technologies, the expense of manufacturing makes it infeasible to...Reconfigurable products and manufacturing systems have enabled manufacturers to provide "cost effective" variety to the market. In spite of these new technologies, the expense of manufacturing makes it infeasible to supply all the possible variants to the market for some industries. Therefore, the determination of the right number of product variantsto offer in the product portfolios becomes an important consideration. The product portfolio planning problem had been independently well studied from marketing and engineering perspectives. However, advantages can be gained from using a concurrent marketing and engineering approach. Concurrent product development strategies specifically for reconfigurable products and manufacturing systems can allow manufacturers to select best product portfolios from marketing, product design and manufacturing perspectives. A methodology for the concurrent design of a product portfolio and assembly system is presented. The objective of the concurrent product portfolio planning and assembly system design problem is to obtain the product variants that will make up the product portfolio such that oversupply of optional modules is minimized and the assembly line efficiency is maximized. Explicit design of the assembly system is obtained during the solution of the problem. It is assumed that the demand for optional modules and the assembly times for these modules are known a priori. A genetic algorithm is used in the solution of the problem. The basic premise of this methodology is that the selected product portfolio has a significant impact on the solution of the assembly line balancing problem. An example is used to validate this hypothesis. The example is then further developed to demonstrate how the methodology can be used to obtain the optimal product portfolio. This approach is intended for use by manufacturers during the early design stages of product family design.展开更多
The UHVAC 1 000-kV transmission system is so far the one with the most advanced transmission technique applied and highest operation voltage.There are no guidelines or standards available for the design of 1 000-kV ov...The UHVAC 1 000-kV transmission system is so far the one with the most advanced transmission technique applied and highest operation voltage.There are no guidelines or standards available for the design of 1 000-kV overhead transmission line in China.Study on key technologies and design schemes shall be carried out to ascertain the technical principles and construction standards for project construction,which are presented in this paper based on the Southeast Shanxi-Nanyang-Jingmen test and demonstration transmission line.A comparison and analysis of technical data and economic indices between UHV line and other lines are also described.展开更多
On July 14, the 2008 Summer Olympic Venue Design Competition concluded with a U.S.-China joint venture scooping the first prize. The event was held for the conceptual designs of two major venues for the Games ?the Oly...On July 14, the 2008 Summer Olympic Venue Design Competition concluded with a U.S.-China joint venture scooping the first prize. The event was held for the conceptual designs of two major venues for the Games ?the Olympic Green and the Wukesong Culture and Sports Center. A total of 87 plans were submitted since the contest was opened in April, 54 for the Olympic Green and 33 for the Wukesong Center.San Francisco-based Sasaki Associates won the top prize for the Olympic Green which was designed in partnership with Tianjin展开更多
This article analyzes the method for designing routes in road reconstruction and expansion projects,using an actual engineering project as an example.This includes an overview of a specific road reconstruction and exp...This article analyzes the method for designing routes in road reconstruction and expansion projects,using an actual engineering project as an example.This includes an overview of a specific road reconstruction and expansion project,an analysis of the preexisting road,the basic principles of the design road project,and an analysis of the design methods and steps.This study aims to offer some guidance for road reconstruction and expansion design.展开更多
Many different types of buildings were severely damaged or collapsed during the May 12, 2008 Great Wenchuan Earthquake. Based on survey data collected in regions that were subjected to moderate to severe earthquake in...Many different types of buildings were severely damaged or collapsed during the May 12, 2008 Great Wenchuan Earthquake. Based on survey data collected in regions that were subjected to moderate to severe earthquake intensities, a comparison between the observed building damage, and the three earthquake performance objectives and seismic conceptual design principles specified by the national "Code for Seismic Design of Buildings GB50011-2001," was carried out. Actual damage and predicted damage for a given earthquake level for different types of structures is compared. Discussions on seismic conceptual design principles, with respect to multiple defense lines, strong column-weak beam, link beam of shear walls, ductility detailing of masonry structures, exits and staircases, and nonstructural elements, etc. are carried out. Suggestions for improving the seismic design of structures are also proposed. It is concluded that the seismic performance objectives for three earthquake levels, i.e., "no failure under minor earthquake level, ""repairable damage under moderate earthquake level" and "no collapse under major earthquake level" can be achieved if seismic design principles are carried out by strictly following the code requirements and ensuring construction quality.展开更多
The dynamic interaction between tunnel lining and its surrounding soil is a complicated issue as the magnitude of seismic wave from bedrock to the structure can be easily influenced by the geometrical layout and struc...The dynamic interaction between tunnel lining and its surrounding soil is a complicated issue as the magnitude of seismic wave from bedrock to the structure can be easily influenced by the geometrical layout and structural stiffness of the tunnel.A series of numerical analysis was conducted to study the dynamic response of the tunnel lining of side-by-side and vertically stacked double-tube tunnel since the inertia and kinematic interactions between the tunnel lining and the surrounding soil during an earthquake could induce excessive stresses to the lining itself due to the stiffness variation between the lining and the soil.Real earthquake ground acceleration was used as an input motion in the dynamic analysis.The interactive behavior of bending moment and axial forces,and the displacement of the tunnels were used to evaluate the effect of tunnel geometrical layout on the performance of the lining.It is found that the effect of earthquake on the axial thrust of the lining is insignificant,and there is a reduction of the bending moment in the lining due to the redistribution of the surrounding soil after the earthquake.展开更多
A simplified method was proposed for the design of concrete lining in underground rock cavern/tunnel against shock loading. The loading may result from the detonation of explosives on ground surface or ground penetrat...A simplified method was proposed for the design of concrete lining in underground rock cavern/tunnel against shock loading. The loading may result from the detonation of explosives on ground surface or ground penetration projectiles exploding adjacent to the cavern/tunnel. The resulting problem necessitates the solution of the dynamics of a beam loaded by a transient pressure uniformly distributed over the span. According to mechanical characteristics of the system with rock bolt and shotcrete, a dynamic support design method based on equivalent single degree of freedom (SDOF) was put forward. The SDOF method was applied to obtaining the maximum displacement at the mid-span of the beam, which is often the controlling factor in the blast-resistant design. In the formulation of the problem, the proposed method combines the phenomena of spalling and structural dynamics theory. An example is provided to demonstrate the applicability of this simplified method.展开更多
In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel...In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel boring machine (TBM). The classification standard of surrounding rocks is put forward on the basis of physical simulations and engineering practices. Damage, deformation and evolution of surrounding rocks induced by TBM excavation are discussed. Meanwhile, the long-term deformation mechanisms and stability of surrounding rocks are also studied. On this basis, a three-dimensional constitutive model for interbedded sandstone slate and a fiat shell-joint element-foundation system for calculating internal forces of segment lining are established. The deformation features of surrounding rocks of deep and steep interbedded sandstone slate and their influences on internal forces of segment lining are presented. Finally, the design methods of segment lining constructed in deep and steep flysch are proposed.展开更多
The first medical high intensity cyclotron CYCIAE-30 and its beam line for the isotope production were built in 1994 at China Institute of Atomic Energy.Now,an upgrading beam line system is designed based on the exist...The first medical high intensity cyclotron CYCIAE-30 and its beam line for the isotope production were built in 1994 at China Institute of Atomic Energy.Now,an upgrading beam line system is designed based on the existing beam line of CYCIAE-30 to transport the beam extracted from the cyclotron to a gas target for the new isotope production,including elements location design,optics simulation and magnet design.The machining and installation of all the elements are accomplished based on the design.The beam tuning is finished and the transmission of 96.5% is obtained.展开更多
This paper describes a new design for the test light source of an L/U-band extended optical fiber line testing system and the side-band suppresser ratio of the test light should be more than 70 dB.
For the injector Scheme- I test stand of the China-ADS (Accelerator Driven subcritical System), a beam with the maximum power of 100 kW will be produced and transported to the beam dump. To solve the very high therm...For the injector Scheme- I test stand of the China-ADS (Accelerator Driven subcritical System), a beam with the maximum power of 100 kW will be produced and transported to the beam dump. To solve the very high thermal load problem at the dump, two measures are taken to deal with the huge power density at the target. One is to enlarge the contact area between the beam and the target, and this is to be accomplished by expanding the beam profile at the target and using slanted target plates. The other is to produce a more homogenous beam profile at the target to minimize the maximum power density. Here the beam dump line is designed to meet the requirement of beam expansion and homogenization at 3 different energies (3.2 MeV, 5 MeV and 10 MeV), and the step-like field magnets are employed for the beam spot homogenization. Taking into account the fact that the space charge effects are very strong at such low beam energies, the simulations have included space charge effects and errors which show that the beam line can meet the requirements very well. In the meantime, the alternative beam design using standard multipole magnets is also presented.展开更多
基金Supported by the National Natural Science Foundation of China under Grant No 11575011the National Grand Instrument Project under Grant No 2012YQ030142
文摘A compact laser plasma accelerator that is a novel accelerator based on the interaction of ultra-intense laser and plasmas is being built now at Peking University. According to the results of experiments and numerical simulations, a beam line combining the advantages of quadrupole and analyzing magnets is designed to deliver proton beams with energy ranging from 1 to 44MeV, energy spread within ±5% and 10^6-8 protons per pulse. It turns out that the existence of space charge force of protons can be ignored for the increase of transverse and longitudinal envelopes even in the case of 10^9 protons in one pulse. To cope with the challenge to obtain a uniform distribution of protons at the final experiment target in laser acceleration, we manipulate the envelope beam waist in the Y direction to a proper position and obtain a relatively good distribution uniformity of protons with an energy spread of 0-±5%0.
文摘Reconfigurable products and manufacturing systems have enabled manufacturers to provide "cost effective" variety to the market. In spite of these new technologies, the expense of manufacturing makes it infeasible to supply all the possible variants to the market for some industries. Therefore, the determination of the right number of product variantsto offer in the product portfolios becomes an important consideration. The product portfolio planning problem had been independently well studied from marketing and engineering perspectives. However, advantages can be gained from using a concurrent marketing and engineering approach. Concurrent product development strategies specifically for reconfigurable products and manufacturing systems can allow manufacturers to select best product portfolios from marketing, product design and manufacturing perspectives. A methodology for the concurrent design of a product portfolio and assembly system is presented. The objective of the concurrent product portfolio planning and assembly system design problem is to obtain the product variants that will make up the product portfolio such that oversupply of optional modules is minimized and the assembly line efficiency is maximized. Explicit design of the assembly system is obtained during the solution of the problem. It is assumed that the demand for optional modules and the assembly times for these modules are known a priori. A genetic algorithm is used in the solution of the problem. The basic premise of this methodology is that the selected product portfolio has a significant impact on the solution of the assembly line balancing problem. An example is used to validate this hypothesis. The example is then further developed to demonstrate how the methodology can be used to obtain the optimal product portfolio. This approach is intended for use by manufacturers during the early design stages of product family design.
文摘The UHVAC 1 000-kV transmission system is so far the one with the most advanced transmission technique applied and highest operation voltage.There are no guidelines or standards available for the design of 1 000-kV overhead transmission line in China.Study on key technologies and design schemes shall be carried out to ascertain the technical principles and construction standards for project construction,which are presented in this paper based on the Southeast Shanxi-Nanyang-Jingmen test and demonstration transmission line.A comparison and analysis of technical data and economic indices between UHV line and other lines are also described.
文摘On July 14, the 2008 Summer Olympic Venue Design Competition concluded with a U.S.-China joint venture scooping the first prize. The event was held for the conceptual designs of two major venues for the Games ?the Olympic Green and the Wukesong Culture and Sports Center. A total of 87 plans were submitted since the contest was opened in April, 54 for the Olympic Green and 33 for the Wukesong Center.San Francisco-based Sasaki Associates won the top prize for the Olympic Green which was designed in partnership with Tianjin
文摘This article analyzes the method for designing routes in road reconstruction and expansion projects,using an actual engineering project as an example.This includes an overview of a specific road reconstruction and expansion project,an analysis of the preexisting road,the basic principles of the design road project,and an analysis of the design methods and steps.This study aims to offer some guidance for road reconstruction and expansion design.
文摘Many different types of buildings were severely damaged or collapsed during the May 12, 2008 Great Wenchuan Earthquake. Based on survey data collected in regions that were subjected to moderate to severe earthquake intensities, a comparison between the observed building damage, and the three earthquake performance objectives and seismic conceptual design principles specified by the national "Code for Seismic Design of Buildings GB50011-2001," was carried out. Actual damage and predicted damage for a given earthquake level for different types of structures is compared. Discussions on seismic conceptual design principles, with respect to multiple defense lines, strong column-weak beam, link beam of shear walls, ductility detailing of masonry structures, exits and staircases, and nonstructural elements, etc. are carried out. Suggestions for improving the seismic design of structures are also proposed. It is concluded that the seismic performance objectives for three earthquake levels, i.e., "no failure under minor earthquake level, ""repairable damage under moderate earthquake level" and "no collapse under major earthquake level" can be achieved if seismic design principles are carried out by strictly following the code requirements and ensuring construction quality.
文摘The dynamic interaction between tunnel lining and its surrounding soil is a complicated issue as the magnitude of seismic wave from bedrock to the structure can be easily influenced by the geometrical layout and structural stiffness of the tunnel.A series of numerical analysis was conducted to study the dynamic response of the tunnel lining of side-by-side and vertically stacked double-tube tunnel since the inertia and kinematic interactions between the tunnel lining and the surrounding soil during an earthquake could induce excessive stresses to the lining itself due to the stiffness variation between the lining and the soil.Real earthquake ground acceleration was used as an input motion in the dynamic analysis.The interactive behavior of bending moment and axial forces,and the displacement of the tunnels were used to evaluate the effect of tunnel geometrical layout on the performance of the lining.It is found that the effect of earthquake on the axial thrust of the lining is insignificant,and there is a reduction of the bending moment in the lining due to the redistribution of the surrounding soil after the earthquake.
基金Projects(50934006, 50904079) supported by the National Natural Science Foundation of China Project(2010CB732004) supported by the National Basic Research Program of China
文摘A simplified method was proposed for the design of concrete lining in underground rock cavern/tunnel against shock loading. The loading may result from the detonation of explosives on ground surface or ground penetration projectiles exploding adjacent to the cavern/tunnel. The resulting problem necessitates the solution of the dynamics of a beam loaded by a transient pressure uniformly distributed over the span. According to mechanical characteristics of the system with rock bolt and shotcrete, a dynamic support design method based on equivalent single degree of freedom (SDOF) was put forward. The SDOF method was applied to obtaining the maximum displacement at the mid-span of the beam, which is often the controlling factor in the blast-resistant design. In the formulation of the problem, the proposed method combines the phenomena of spalling and structural dynamics theory. An example is provided to demonstrate the applicability of this simplified method.
基金Supported by the National Key Technology R&D Program in the 11th Five-year Plan of China (2006BAB04A06)
文摘In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel boring machine (TBM). The classification standard of surrounding rocks is put forward on the basis of physical simulations and engineering practices. Damage, deformation and evolution of surrounding rocks induced by TBM excavation are discussed. Meanwhile, the long-term deformation mechanisms and stability of surrounding rocks are also studied. On this basis, a three-dimensional constitutive model for interbedded sandstone slate and a fiat shell-joint element-foundation system for calculating internal forces of segment lining are established. The deformation features of surrounding rocks of deep and steep interbedded sandstone slate and their influences on internal forces of segment lining are presented. Finally, the design methods of segment lining constructed in deep and steep flysch are proposed.
文摘The first medical high intensity cyclotron CYCIAE-30 and its beam line for the isotope production were built in 1994 at China Institute of Atomic Energy.Now,an upgrading beam line system is designed based on the existing beam line of CYCIAE-30 to transport the beam extracted from the cyclotron to a gas target for the new isotope production,including elements location design,optics simulation and magnet design.The machining and installation of all the elements are accomplished based on the design.The beam tuning is finished and the transmission of 96.5% is obtained.
文摘This paper describes a new design for the test light source of an L/U-band extended optical fiber line testing system and the side-band suppresser ratio of the test light should be more than 70 dB.
基金Supported by CAS Strategic Priority Research Program-China-ADSNational Natural Science Foundation of China(11235012,10975150)
文摘For the injector Scheme- I test stand of the China-ADS (Accelerator Driven subcritical System), a beam with the maximum power of 100 kW will be produced and transported to the beam dump. To solve the very high thermal load problem at the dump, two measures are taken to deal with the huge power density at the target. One is to enlarge the contact area between the beam and the target, and this is to be accomplished by expanding the beam profile at the target and using slanted target plates. The other is to produce a more homogenous beam profile at the target to minimize the maximum power density. Here the beam dump line is designed to meet the requirement of beam expansion and homogenization at 3 different energies (3.2 MeV, 5 MeV and 10 MeV), and the step-like field magnets are employed for the beam spot homogenization. Taking into account the fact that the space charge effects are very strong at such low beam energies, the simulations have included space charge effects and errors which show that the beam line can meet the requirements very well. In the meantime, the alternative beam design using standard multipole magnets is also presented.