期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Sector Capacity Estimation Based on Differentiated Routes and Busy Levels
1
作者 Dong Xiangning Hu minghua Washington Yotto Ochieng 《Transactions of Nanjing University of Aeronautics and Astronautics》 EI CSCD 2017年第4期438-448,共11页
Sector capacity estimation plays an important role in applied research of airspace management.Previous researches manifest that sector capacity should be influenced by its standard flow,or routes in that sector.Howeve... Sector capacity estimation plays an important role in applied research of airspace management.Previous researches manifest that sector capacity should be influenced by its standard flow,or routes in that sector.However,if air traffic controller(ATCO)workload busy levels(level of proactivity of an ATCO)are ignored,the estimated sector capacity may not be accurate.There is a need to compare the estimated sector capacity with and without busy levels consideration,both with differentiated routes consideration.This paper proposes a method for sector capacity estimation based on ATCO workload considering differentiated routes and busy levels.Firstly,the main routes in the sector are identified,and for each route,the ATCO workload per flight is determined.Secondly,the workload for each route at three busy levels is determined.Regression analysis is then applied to determine the relationship between workload and the number of flights(with and without considering busy levels)in 15 min and 1h time slices.Sector capacity is then determined on the basis of a specified workload threshold,for the two cases with and without considering busy levels.Comparing the two scenarios and following validation by ATCO survey,it is found that capacity estimation considering busy levels is a more realistic and accurate approach.The validated capacity values for the Zhengzhou approach(ZHCC AP)airspace sector accounting for the busy levels were determined accurately as 10 and 33 flights for the 15 min and 1h slices,respectively.The corresponding results without considering busy levels were 12 and 41 flights for the 15 min and 1h time slices,respectively. 展开更多
关键词 ATCO workload airspace sector capacity estimation differentiated routes differentiated busy levels
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部