期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Estimating Probability of Instability of Haulage Drift with Respect to Mining Sequences
1
作者 Wael Abdellah Hani S. Mitri +1 位作者 Denis Thibodeau Lindsay Moreau-Verlaan 《Journal of Civil Engineering and Architecture》 2013年第7期887-896,共10页
Haulage drifts play a vital role in providing personnel and equipment access to ore extraction areas for mine production. Thus, their stability is of crucial importance during the life of a mine plan. Many Canadian mi... Haulage drifts play a vital role in providing personnel and equipment access to ore extraction areas for mine production. Thus, their stability is of crucial importance during the life of a mine plan. Many Canadian mines use longhole mining methods or one of its variants. These methods require access to the orebody through haulage drifts on multiple levels. This paper examines the stability of mine haulage drifts with respect to planned mining sequence. A case study of an underground mine is presented. The case study examines # l Shear East of the Garson Mine in Sudbury, Ontario. A two-dimensional, elastoplastic, finite difference model (FLAC 2D) is developed for a haulage drift situated 1.5 km below surface in the footwall of the orebody. The stability of the haulage drift is evaluated in terms of the spread of yield zones into the rockmass due to nearby mining activities. The performance of the drift stability is evaluated at various mining stages, employing the RMC (Random Monte-Carlo) technique in conjunction with finite difference modeling to study the probability of unsatisfactory performance of the drift. The results are presented and categorized with respect to probability, instability and mining stage. 展开更多
关键词 Haulage drifts stability numerical modeling RMC yielding zone.
下载PDF
Time Drift Stabilizer Unit in BEPCⅡ Injection Kicker System
2
作者 陈锦晖 《Chinese Physics C》 SCIE CAS CSCD 北大核心 2008年第z1期4-6,共3页
High time-stability performance of the injection kicker system is important for the Beijing Electron Positron Collider Upgrade Project (BEPCⅡ),with jitter and drift less than±5ns.In order to compensate the delay... High time-stability performance of the injection kicker system is important for the Beijing Electron Positron Collider Upgrade Project (BEPCⅡ),with jitter and drift less than±5ns.In order to compensate the delay time drift of thyratron on the kicker pulsed power supply,a drift stabilizer is developed.The test results meet the demand of design by regulation resolution=1ns,jitter+drift<2ns in 8 hours.The detailed design of the time-drift stabilizer will be described in this paper. 展开更多
关键词 injection kicker pulsed power supply time drift stabilizer jitter THYRATRON
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部