Gas-solid two-phase flow theory was used to predict dust distribution and movement at the working face of a mine.The software package FLUENT was used to numerically simulate dust motion and the results were compared t...Gas-solid two-phase flow theory was used to predict dust distribution and movement at the working face of a mine.The software package FLUENT was used to numerically simulate dust motion and the results were compared to observed data.The simulation agrees with the data taken from an actual working face,which confirms the choice of mathematical model and numerical simulation method. Using the model we predict a set of conditions optimum for reducing dust concentrations at the mine working face.展开更多
A reasonable unsupported roof distance(URD) when advancing underground coal mine roadways can contribute greatly to safe and rapid roadway development.A mechanical model of the roof,using the relationship between the ...A reasonable unsupported roof distance(URD) when advancing underground coal mine roadways can contribute greatly to safe and rapid roadway development.A mechanical model of the roof,using the relationship between the roof stress distribution and URD,obtained by the difference method,and roof stability according to the in-situ roof stress and rock mass strength was developed.We subsequently designed a proper range of URD,developed a testing method of URD with the function of mining protection,evaluated roof stability through analyzing the test data and then determined a reasonable URD.Considering the factors of the geological conditions,the immediate roof stability and the efficiency of the labor arrangement system,the URD of the advancing roadway of 9802 working face in Zhangshuanglou coal mine was determined to be 6 m using the proposed method.The results show that,when a 2 m length of roadway was reinforced by temporary support and high pre-stressed bolt support after the roadway advancement of 6 m per cycle,the speed and the security of the roadway development can be achieved and the advance rate can reach more than 400 m per month.展开更多
基金supported by the Special Foundation for Doctor Degree of the Ministry of Education(No.2006008001)the Construction Project of Beijing Municipal Education Committee (No.XK100080432)the Joint Development Project of Beijing.
文摘Gas-solid two-phase flow theory was used to predict dust distribution and movement at the working face of a mine.The software package FLUENT was used to numerically simulate dust motion and the results were compared to observed data.The simulation agrees with the data taken from an actual working face,which confirms the choice of mathematical model and numerical simulation method. Using the model we predict a set of conditions optimum for reducing dust concentrations at the mine working face.
基金supported by the State Key Laboratory of Coal Resources and Sate Mining,China University of Mining and Technology (No.SKLCRSM13X07)the National Natural Science Foundation of China (No.51174195)+1 种基金Chinese National Programs for Fundamental Research and Development (No.2013CB227900)the Fundamental Research Funds for the Central Universities (No.2014XT01)
文摘A reasonable unsupported roof distance(URD) when advancing underground coal mine roadways can contribute greatly to safe and rapid roadway development.A mechanical model of the roof,using the relationship between the roof stress distribution and URD,obtained by the difference method,and roof stability according to the in-situ roof stress and rock mass strength was developed.We subsequently designed a proper range of URD,developed a testing method of URD with the function of mining protection,evaluated roof stability through analyzing the test data and then determined a reasonable URD.Considering the factors of the geological conditions,the immediate roof stability and the efficiency of the labor arrangement system,the URD of the advancing roadway of 9802 working face in Zhangshuanglou coal mine was determined to be 6 m using the proposed method.The results show that,when a 2 m length of roadway was reinforced by temporary support and high pre-stressed bolt support after the roadway advancement of 6 m per cycle,the speed and the security of the roadway development can be achieved and the advance rate can reach more than 400 m per month.