针对无线传感器网络占空比MAC协议在链路或节点失效环境下易导致严重的能量浪费问题,提出了一种基于Grid Quorum的异步低占空比M AC协议-AGQ-M AC(Asynchronous Grid Quorum M AC).AGQ-M AC采用Grid Quorum组分配信道,通过动态调配Quoru...针对无线传感器网络占空比MAC协议在链路或节点失效环境下易导致严重的能量浪费问题,提出了一种基于Grid Quorum的异步低占空比M AC协议-AGQ-M AC(Asynchronous Grid Quorum M AC).AGQ-M AC采用Grid Quorum组分配信道,通过动态调配Quorum比率得到了节点的最优占空比,并在邻节点发现过程中采用双前导序文抽样来监测信道状态,以减少节点唤醒时间从而达到能量高效.仿真实验结果表明,与其他占空比MAC协议相比,AGQ-MAC延长了网络生存时间,降低了网络能耗,提高了邻发现数据传输率,同时保持较低的平均邻发现延迟.展开更多
In India most part receives 4 - 7 kWh of solar radiation per square meter per day with 200 - 250 sunny days in a year. Tamilnadu state also receives the highest annual radiation in India. In this paper, the grid conne...In India most part receives 4 - 7 kWh of solar radiation per square meter per day with 200 - 250 sunny days in a year. Tamilnadu state also receives the highest annual radiation in India. In this paper, the grid connected photovoltaic plant has a peak power of 80 KWp supplies electricity requirement of GRT IET campus during day time (7 hrs) and reduces load demand and generates useful data for future implementation of such PV plant projects in the Tamilnadu region. Photovoltaic plant was installed in April 2015, monitored during 6 months, and the performance ratio and the various power losses (power electronics, temperature, soiling, internal, network, grid availability and interconnection) were calculated. The PV plant supplied 64,182.86 KWh to the grid from April to September 2015, ranging from 11,510.900 to 10,200.9 kWh. The final yield ranged from 143.886 (h/d) to 127.51 (y/d), reference yield ranged from 201.6 (h/d) to 155.31 (h/d) and performance ratio ranged from 71.3% to 82.1%, for a duration of six months, it had given a performance ratio of 83.82%, system efficiency was 4.16% and the capacity factor of GRT IET Campus for six months was 18.26%. Payback period in years = 9 years 4 months, energy saving per year = 204,400 KWh, cost reduction per year = 1,737,400, Indian rupee = 26,197.30 USD and total CO<sub>2</sub> reductions per year = 102,200 tons CO<sub>2</sub>/year.展开更多
文摘针对无线传感器网络占空比MAC协议在链路或节点失效环境下易导致严重的能量浪费问题,提出了一种基于Grid Quorum的异步低占空比M AC协议-AGQ-M AC(Asynchronous Grid Quorum M AC).AGQ-M AC采用Grid Quorum组分配信道,通过动态调配Quorum比率得到了节点的最优占空比,并在邻节点发现过程中采用双前导序文抽样来监测信道状态,以减少节点唤醒时间从而达到能量高效.仿真实验结果表明,与其他占空比MAC协议相比,AGQ-MAC延长了网络生存时间,降低了网络能耗,提高了邻发现数据传输率,同时保持较低的平均邻发现延迟.
文摘In India most part receives 4 - 7 kWh of solar radiation per square meter per day with 200 - 250 sunny days in a year. Tamilnadu state also receives the highest annual radiation in India. In this paper, the grid connected photovoltaic plant has a peak power of 80 KWp supplies electricity requirement of GRT IET campus during day time (7 hrs) and reduces load demand and generates useful data for future implementation of such PV plant projects in the Tamilnadu region. Photovoltaic plant was installed in April 2015, monitored during 6 months, and the performance ratio and the various power losses (power electronics, temperature, soiling, internal, network, grid availability and interconnection) were calculated. The PV plant supplied 64,182.86 KWh to the grid from April to September 2015, ranging from 11,510.900 to 10,200.9 kWh. The final yield ranged from 143.886 (h/d) to 127.51 (y/d), reference yield ranged from 201.6 (h/d) to 155.31 (h/d) and performance ratio ranged from 71.3% to 82.1%, for a duration of six months, it had given a performance ratio of 83.82%, system efficiency was 4.16% and the capacity factor of GRT IET Campus for six months was 18.26%. Payback period in years = 9 years 4 months, energy saving per year = 204,400 KWh, cost reduction per year = 1,737,400, Indian rupee = 26,197.30 USD and total CO<sub>2</sub> reductions per year = 102,200 tons CO<sub>2</sub>/year.