期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Research on Optimization of Dual-Resource Batch Scheduling in Flexible Job Shop
1
作者 Qinhui Liu Zhijie Gao +2 位作者 Jiang Li Shuo Li Laizheng Zhu 《Computers, Materials & Continua》 SCIE EI 2023年第8期2503-2530,共28页
With the rapid development of intelligent manufacturing and the changes in market demand,the current manufacturing industry presents the characteristics of multi-varieties,small batches,customization,and a short produ... With the rapid development of intelligent manufacturing and the changes in market demand,the current manufacturing industry presents the characteristics of multi-varieties,small batches,customization,and a short production cycle,with the whole production process having certain flexibility.In this paper,a mathematical model is established with the minimum production cycle as the optimization objective for the dual-resource batch scheduling of the flexible job shop,and an improved nested optimization algorithm is designed to solve the problem.The outer layer batch optimization problem is solved by the improved simulated annealing algorithm.The inner double resource scheduling problem is solved by the improved adaptive genetic algorithm,the double coding scheme,and the decoding scheme of Automated Guided Vehicle(AGV)scheduling based on the scheduling rules.The time consumption of collision-free paths is solved with the path planning algorithm which uses the Dijkstra algorithm based on a time window.Finally,the effectiveness of the algorithm is verified by actual cases,and the influence of AGV with different configurations on workshop production efficiency is analyzed. 展开更多
关键词 dual resource scheduling batch optimization genetic algorithm simulated annealing time window
下载PDF
Research on Flexible Job Shop Scheduling Based on Improved Two-Layer Optimization Algorithm
2
作者 Qinhui Liu Laizheng Zhu +2 位作者 Zhijie Gao Jilong Wang Jiang Li 《Computers, Materials & Continua》 SCIE EI 2024年第1期811-843,共33页
To improve the productivity,the resource utilization and reduce the production cost of flexible job shops,this paper designs an improved two-layer optimization algorithm for the dual-resource scheduling optimization p... To improve the productivity,the resource utilization and reduce the production cost of flexible job shops,this paper designs an improved two-layer optimization algorithm for the dual-resource scheduling optimization problem of flexible job shop considering workpiece batching.Firstly,a mathematical model is established to minimize the maximum completion time.Secondly,an improved two-layer optimization algorithm is designed:the outer layer algorithm uses an improved PSO(Particle Swarm Optimization)to solve the workpiece batching problem,and the inner layer algorithm uses an improved GA(Genetic Algorithm)to solve the dual-resource scheduling problem.Then,a rescheduling method is designed to solve the task disturbance problem,represented by machine failures,occurring in the workshop production process.Finally,the superiority and effectiveness of the improved two-layer optimization algorithm are verified by two typical cases.The case results show that the improved two-layer optimization algorithm increases the average productivity by 7.44% compared to the ordinary two-layer optimization algorithm.By setting the different numbers of AGVs(Automated Guided Vehicles)and analyzing the impact on the production cycle of the whole order,this paper uses two indicators,the maximum completion time decreasing rate and the average AGV load time,to obtain the optimal number of AGVs,which saves the cost of production while ensuring the production efficiency.This research combines the solved problem with the real production process,which improves the productivity and reduces the production cost of the flexible job shop,and provides new ideas for the subsequent research. 展开更多
关键词 dual resource scheduling workpiece batching RESCHEDULING particle swarm optimization genetic algorithm
下载PDF
CRF:A Scheduling of Multi-Granularity Locks in Object-Oriented Database Systems
3
作者 Qin Xiao & Pang Liping(Department of Computer Science, Huazhong University of Science and Technology,Wuhan 430074, P. R. China) 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 1998年第4期51-57,共7页
This paper introduces a multi-granularity locking model (MGL) for concurrency control in object-oriented database system briefiy, and presents a MGL model formally. Four lockingscheduling algorithms for MGL are propos... This paper introduces a multi-granularity locking model (MGL) for concurrency control in object-oriented database system briefiy, and presents a MGL model formally. Four lockingscheduling algorithms for MGL are proposed in the paper. The ideas of single queue scheduling(SQS) and dual queue scheduling (DQS) are proposed and the algorithm and the performance evaluation for these two scheduling are presented in some paper. This paper describes a new idea of thescheduling for MGL, compatible requests first (CRF). Combining the new idea with SQS and DQS,we propose two new scheduling algorithms called CRFS and CRFD. After describing the simulationmodel, this paper illustrates the comparisons of the performance among these four algorithms. Asshown in the experiments, DQS has better performance than SQS, CRFD is better than DQS, CRFSperforms better than SQS, and CRFS is the best one of these four scheduling algorithms. 展开更多
关键词 Lock scheduling Multi-granularity lock Concurrency control Compatible requestsfirst Single queue scheduling dual queue scheduling Object-oriented database system
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部