期刊文献+
共找到147篇文章
< 1 2 8 >
每页显示 20 50 100
Conceptual design of the CEPC dumping system
1
作者 Guangyi Tang Qiongyao Liu +2 位作者 Haoyu Shi Xiaohao Cui Zhongjian Ma 《Radiation Detection Technology and Methods》 CSCD 2023年第2期220-226,共7页
Background The circular electron–positron collider(CEPC)is a double-ring collider proposed by Chinese scientists.It will be operated at centre-of-mass energy of 240,90,160 GeV and maybe also 360 GeV.Purpose The total... Background The circular electron–positron collider(CEPC)is a double-ring collider proposed by Chinese scientists.It will be operated at centre-of-mass energy of 240,90,160 GeV and maybe also 360 GeV.Purpose The total energy stored in the collider is up to 20 MJ.It is important to extract beams safely and not to damage the dump.In this paper,a dumping system including dilution kickers and absorber core with iron shielding is discussed.Methods The Monte Carlo code FLUKA is used to obtain the deposited energy and dose-equivalent distributions.The temperature rises are calculated assuming no heat conduction.Results Compared with the melting point and upper limit of dose equivalent,the magnets parameters are determined and the dimensions of the core and shielding are optimized.Conclusion The design of the dumping system meets the requirement that the energy stored in the collider can be absorbed safely. 展开更多
关键词 CEPC dumping system FLUKA Temperature rise Dose equivalent
原文传递
A comparative study on kinetics and dynamics of two dump truck lifting mechanisms using MATLAB simscape
2
作者 Thong Duc Hong Minh Quang Pham +2 位作者 Son Cong Tran Lam Quang Tran Truong Thanh Nguyen 《Theoretical & Applied Mechanics Letters》 CAS CSCD 2024年第2期146-156,共11页
In this paper,two lifting mechanism models with opposing placements,which use the same hydraulic hoist model and have the same angle of 50°,have been developed.The mechanical and hydraulic simulation models are e... In this paper,two lifting mechanism models with opposing placements,which use the same hydraulic hoist model and have the same angle of 50°,have been developed.The mechanical and hydraulic simulation models are established using MATLAB Simscape to analyze their kinetics and dynamics in the lifting and holding stages.The simulation findings are compared to the analytical calculation results in the steady state,and both methods show good agreement.In the early lifting stage,Model 1 produces greater force and discharges goods in the container faster than Model 2.Meanwhile,Model 2 reaches a higher force and ejects goods from the container cleaner than its counterpart at the end lifting stage.The established simulation models can consider the effects of dynamic loads due to inertial moments and forces generated during the system operation.It is crucial in studying,designing,and optimizing the structure of hydraulic-mechanical systems. 展开更多
关键词 Dump truck Lifting mechanism HYDRAULIC MATLAB Simscape Kinetic dynamic analysis
下载PDF
Shear resistance characteristics and influencing factors of root-soil composite on an alpine metal mine dump slope with different recovery periods
3
作者 PANG Jinghao LIANG Shen +5 位作者 LIU Yabin LI Shengwei WANG Shu ZHU Haili LI Guorong HU Xiasong 《Journal of Mountain Science》 SCIE CSCD 2024年第3期835-849,共15页
Artificial vegetation restoration is the main measure for vegetation restoration and soil and water conservation in alpine mine dumps on the Qinghai-Tibet Plateau,China.However,there are few reports on the dynamic cha... Artificial vegetation restoration is the main measure for vegetation restoration and soil and water conservation in alpine mine dumps on the Qinghai-Tibet Plateau,China.However,there are few reports on the dynamic changes and the influencing factors of the soil reinforcement effect of plant species after artificial vegetation restoration under different recovery periods.We selected dump areas of the Delni Copper Mine in Qinghai Province,China to study the relationship between the shear strength and the peak displacement of the root-soil composite on the slope during the recovery period,and the influence of the root traits and soil physical properties on the shear resistance characteristics of the root-soil composite via in situ direct shear tests.The results indicate that the shear strength and peak displacement of the rooted soil initially decreased and then increased with the increase of the recovery period.The shear strength of the rooted soil and the recovery period exhibited a quadratic function relationship.There is no significant function relationship between the peak displacement and the recovery period.Significant positive correlations(P<0.05)exists between the shear strength of the root-soil composite and the root biomass density,root volume density,and root area ratio,and they show significant linear correlations(P<0.05).There are no significant correlations(P>0.05)between the shear strength of the root-soil composite and the root length density,and the root volume ratio of the coarse roots to the fine roots.A significant negative linear correlation(P<0.05)exists between the peak displacement of the rooted soil and the coarse-grain content,but no significant correlations(P>0.05)with the root traits,other soil physical property indices(the moisture content and dry density of the soil),and slope gradient.The coarse-grain content is the main factor controlling the peak displacement of the rooted soil. 展开更多
关键词 Alpine mine dump Artificial vegetation restoration period Rooted soil Shear resistance characteristics Root traits Soil physical properties
下载PDF
Rainfall-triggered waste dump instability analysis based on surface 3D deformation in physical model test
4
作者 LI Hanlin JIN Xiaoguang +2 位作者 HE Jie XUE Yunchuan YANG Zhongping 《Journal of Mountain Science》 SCIE CSCD 2024年第5期1549-1563,共15页
Landslide is the second largest natural disaster after earthquake. It is of significance to study the evolution laws and failure mechanism of landslides based on its surface 3D deformation information. Based on the ra... Landslide is the second largest natural disaster after earthquake. It is of significance to study the evolution laws and failure mechanism of landslides based on its surface 3D deformation information. Based on the rainfall-triggered waste dump instability model test, we studied the failure mechanisms of the waste dump by integrating surface deformation and internal slope stress and proposed novel parameters for identifying landslide stability. We developed a noncontact measurement device, which can obtain millimeter-level 3D deformation data for surface scene in physical model test;Then we developed the similar materials and established a test model for a waste dump. Based on the failure characteristics of slope surface, internal stress of slope body and displacement contours during the whole process, we divided the slope instability process in model test into four stages: rainfall infiltration and surface erosion, shallow sliding, deep sliding, and overall instability. Based on the obtained surface deformation data, we calculated the volume change during slope instability process and compared it with the point displacement on slope surface. The results showed that the volume change can not only reflect the slow-ultra acceleration process of slope failure, but also fully reflect the above four stages and reduce the fluctuations caused by random factors. Finally, this paper proposed two stability identification parameters: the volume change rate above the slip surface and the relative velocity of volume change rate. According to the calculation of these two parameters in model test, they can be used for study the deformation and failure mechanism of slope stability. 展开更多
关键词 Waste dump stability Physical model test Surface 3D deformation Stability identification
下载PDF
A Predictive Energy Management Strategies for Mining Dump Trucks
5
作者 Yixuan Yu Yulin Wang +1 位作者 Qingcheng Li Bowen Jiao 《Energy Engineering》 EI 2024年第3期769-788,共20页
The plug-in hybrid vehicles(PHEV)technology can effectively address the issues of poor dynamics and higher energy consumption commonly found in traditional mining dump trucks.Meanwhile,plug-in hybrid electric trucks c... The plug-in hybrid vehicles(PHEV)technology can effectively address the issues of poor dynamics and higher energy consumption commonly found in traditional mining dump trucks.Meanwhile,plug-in hybrid electric trucks can achieve excellent fuel economy through efficient energy management strategies(EMS).Therefore,a series hybrid system is constructed based on a 100-ton mining dump truck in this paper.And inspired by the dynamic programming(DP)algorithm,a predictive equivalent consumption minimization strategy(P-ECMS)based on the DP optimization result is proposed.Based on the optimal control manifold and the SOC reference trajectory obtained by the DP algorithm,the P-ECMS strategy performs real-time stage parameter optimization to obtain the optimal equivalent factor(EF).Finally,applying the equivalent consumption minimization strategy(ECMS)realizes real-time control.The simulation results show that the equivalent fuel consumption of the P-ECMS strategy under the experimentally collected mining cycle conditions is 150.8 L/100 km,which is 10.9%less than that of the common CDCS strategy(169.3 L/100 km),and achieves 99.47%of the fuel saving effect of the DP strategy(150 L/100 km). 展开更多
关键词 Mining dump truck energy management strategy plug-in hybrid electric vehicle equivalent consumption minimization strategy dynamic programming
下载PDF
Innuendoes of Sterilisation Drilling in Surface Mining Operations—A Case Study
6
作者 Richard Gyebuni Festus Kunkyin-Saadaari Isaac Ekow Anaman 《International Journal of Geosciences》 CAS 2024年第5期458-477,共20页
Surface mining operations play a crucial role in meeting the world’s increasing demand for mineral resources for the advancement of technology and debauched expansion of economies. The search for and exploitation of ... Surface mining operations play a crucial role in meeting the world’s increasing demand for mineral resources for the advancement of technology and debauched expansion of economies. The search for and exploitation of these mineral resources are therefore important for the sustainability of the mineral extraction industry. To this end, efficient mine planning must incorporate sterilisation drilling and effective waste rock management principles in the search and exploitation of these minerals. In this article, sterilisation drilling is being reviewed vis-a-vis the establishment of waste and tailings dump locations, backfilling of open pit excavations and mine closure giving critical attention to the minerals and mining laws of Ghana. Subsequently, a detailed case study of a surface mining operation that successfully incorporated sterilisation drilling in determining waste dump location in its mine planning process has been presented in this study. The findings indicate that the proposed waste dump location could present a potential mining prospect in the future based on enhanced milling capacity/technology and improved mineral commodity price;underscoring the significance of sterilization drilling in the sustainability of the mining industry. 展开更多
关键词 STERILISATION Exploration BACKFILLING Waste Dump Cutoff Grade
下载PDF
Optimization of transport passage with dragline system in thick overburden open pit mine 被引量:3
7
作者 Zhang Weishi Cai Qingxiang Chen Shuzhao 《International Journal of Mining Science and Technology》 SCIE EI 2013年第6期901-906,共6页
According to the characteristics of opencast coal resources and dragline technology system application in China,the structure and shifting step of transport passage are optimized in this paper.Typical coal transport p... According to the characteristics of opencast coal resources and dragline technology system application in China,the structure and shifting step of transport passage are optimized in this paper.Typical coal transport passage is analyzed in aspects such as the internal dump occupation,dragline operation efficiency,coal transport distance,upper stripping distance and shifting quantities.The middle passage should be given priority in thick overburden open pit mine because the dragline system is only responsible for part stripping task.According to characteristics of middle passage,the transport passage is divided into parallel climbing,vertical climbing and horizontal transport.In addition,the transport passage structure optimization model and shifting distance optimization model are established in this paper.The case study in Heidaigou open pit mine shows that,the parallel climbing height is accounted for about 60%of the total height,and reasonable shifting distances of the first mining area and the second mining area are 240 and 320 m.Sensitivity analysis shows that,the total passage height has important influence on the shifting step,so it is with the stripping height and passage construction cost to the passage structure. 展开更多
关键词 Open pit mine DRAGLINE Transport passage Middle passage Internal dump
下载PDF
Impact of open dumping of municipal solid waste on soil properties in mountainous region 被引量:1
8
作者 Anchal Sharma Ashok Kumar Gupta Rajiv Ganguly 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2018年第4期725-739,共15页
This paper presents the effect of open dumping of municipal solid waste(MSW) on soil characteristics in the mountainous region of Himachal Pradesh, India. The solid waste of dumpsite contains various complex character... This paper presents the effect of open dumping of municipal solid waste(MSW) on soil characteristics in the mountainous region of Himachal Pradesh, India. The solid waste of dumpsite contains various complex characteristics with organic fractions of the highest proportions. As leachate percolates into the soil, it migrates contaminants into the soil and affects soil stability and strength. The study includes the geotechnical investigation of dump soil characteristics and its comparison with the natural soil samples taken from outside the proximity of dumpsites. The geochemical analysis of dumpsite soil samples was also carried out by scanning electron microscopy(SEM) and energy dispersive X-ray spectroscopy(EDS).Visual inspection revealed that the MSW consists of high fraction of organics, followed by paper. The soil samples were collected from five trial pits in the dumpsites at depths of 0.5 m, 1 m and 1.5 m. Then the collected soil samples were subjected to specific gravity test, grain size analysis, Atterberg’s limit test,compaction test, direct shear test, California bearing ratio(CBR) test and permeability analysis. The study indicated that the dumpsite soils from four study regions show decreasing trends in the values of maximum dry density(MDD), specific gravity, cohesion and CBR, and increasing permeability as compared to the natural soil. The results show that the geotechnical properties of the soils at all four study locations have been severely hampered due to contamination induced by open dumping of waste. 展开更多
关键词 Municipal solid waste (MSW) Physical characterization Soil pollution Open dumping Scanning electron microscopy (SEM) Energy disperse X-ray spectroscopy (EDS)
下载PDF
Charging for the waste dumping of open-pit metal mines 被引量:1
9
作者 Yunbing Hou Zhaoxiang Zhang Haifeng Duan Liming Xue 《Journal of University of Science and Technology Beijing》 CSCD 2006年第6期481-485,共5页
Based on the externality theory and the environmental value theory, the hypothesis of charging for waste dumping of open-pit metal mines was put forth. The charging methods were designed according to the characteristi... Based on the externality theory and the environmental value theory, the hypothesis of charging for waste dumping of open-pit metal mines was put forth. The charging methods were designed according to the characteristics of waste dumping of openpit metal mines, including charging based on the dumping amount of the total waste, multi-charging factors, exceeding standard punishment charging, and so on. The main charging parameter is based on the dumping area rather than the total amount of waste dumping. The charging model of waste dumping of open-pit mines was formulated, and the charging rate was divided into two parts, i.e., the standard charging rate and the differential charging rate. The standard charging rate was derived using the equilibrium dynamic model, whereas the differential one was obtained by establishing the fuzzy synthesized evaluation model. 展开更多
关键词 open-pit metal mine waste dumping charging pattern basic charging rate differential charging rate
下载PDF
Numerical Simulation for Remediation Planning for 1,4-Dioxane-Contaminated Groundwater at Kuwana Illegal Dumping Site in Japan Based on the Concept of Verified Follow Up 被引量:1
10
作者 Ramrav Hem Toru Furuichi +1 位作者 Kazuei Ishii Yu-Chi Weng 《Journal of Water Resource and Protection》 2013年第7期699-708,共10页
At Kuwana illegal dumping site in Japan, where hazardous waste was illegally dumped, groundwater was severely contaminated by Volatile Organic Compounds (VOCs). Groundwater was already remedied by conducting Pump-and-... At Kuwana illegal dumping site in Japan, where hazardous waste was illegally dumped, groundwater was severely contaminated by Volatile Organic Compounds (VOCs). Groundwater was already remedied by conducting Pump-and-Treat (P&T) after containment of all the waste by vertical slurry walls from 2002 to 2007. However, 1,4-dioxane was detected in both waste and groundwater outside of slurry walls after it was newly added into Japan environmental standards in late 2009, which suggested that the walls did not contain 1,4-dioxane completely. Our previous study developed a model to predict the 1,4-dioxane distribution in groundwater after the previous remediation at the site. In this study, numerical simulation was applied for remediation planning at the site based on the concept of Verified Follow Up (VF-UP) that had been proposed as a new approach to complete remediation effectively with consideration of future risks. The amount of waste to be removed and pumping plans were discussed by numerical simulation to achieve the remedial objective in which 1,4-dioxane in groundwater outside of walls is remedied within 10 years and 1,4-dioxane spreading throughout the walls is prevented in the case where a portion of waste is remained. Firstly, the amount of waste to be removed considering pumping plans for P&T was determined by scenario analysis. As a result, at least two-third of waste should be removed by combining with P&T. However, if the waste is remained, future risks of 1,4-dioxane spreading through the slurry walls may occur. Our simulation suggested that groundwater within the remaining waste must be pumped up at least 20 m3/d for containment of 1,4-dioxane within the remaining waste. In conclusion, our numerical simulation determined the amount of waste to be removed and the pumping plans for P&T to achieve the remedial objective effectively considering future risks based on the concept of VF-UP. 展开更多
关键词 REMEDIATION PLANNING Numerical Simulation Verified FOLLOW Up Pump-and-Treat 1 4-Dioxane-Contaminated Groundwater ILLEGAL dumping Site
下载PDF
Study on Formation Mechanism of Dumping Piles on Dumping Area Stability 被引量:1
11
作者 Donghua Zhang Naoya Inoue +3 位作者 Takashi Sasaoka Hideki Shimada Akihiro Hamanaka Kikuo Matsui 《Open Journal of Geology》 2014年第4期161-175,共15页
Dumping areas represent a stable hazard. To clarify the formation mechanism of dumping piles on dumping area stability, an investigation in open pit mine was performed. Moreover, experiments with gravel were conducted... Dumping areas represent a stable hazard. To clarify the formation mechanism of dumping piles on dumping area stability, an investigation in open pit mine was performed. Moreover, experiments with gravel were conducted based on the research site conditions. The geological conditions, dumping operation, and waste particle size distribution were investigated in the Heidaigou open pit mine. Particle size distribution, dumping height, dumping volume, and floor inclination were varied to examine their effects on a single pile formation. The design of blasting can be modified to make the particle size of waste smaller. The volume of the bucket does not have a pronounced effect on dumping pile repose angle, capacity of dumping pile, and dumping area stability. The smaller the floor inclination, the better it is. Two measures are proposed to increase the kinetic force of friction between waste material and floor surface. The interval distance, dumping volume and dumping height were also varied to examine the interaction between the formations of multiple piles. The dumping width should be decided through optimization efficiency of bulldozer and dumping device in bucket wheel excavator-belt-stacker dumping operation and dragline dumping operation. Moreover, the volume of the bucket does not have a pronounced interaction effect. In the dumping operation, the work amount of bulldozer decreases as dumping pile increases. The design of the dumping operation must consider the total efficiency of ground leveling operation and forming dumping the area. 展开更多
关键词 Open PIT MINE dumping PILE Formation Mechanism Site Investigation Experiment
下载PDF
Preliminary prospective study of real-time post-gastrectomy glycemic fluctuations during dumping symptoms using continuous glucose monitoring
12
作者 Motonari Ri Souya Nunobe +6 位作者 Satoshi Ida Naoki Ishizuka Shinichiro Atsumi Rie Makuuchi Koshi Kumagai Manabu Ohashi Takeshi Sano 《World Journal of Gastroenterology》 SCIE CAS 2021年第23期3386-3395,共10页
BACKGROUND Although dumping symptoms constitute the most common post-gastrectomy syndromes impairing patient quality of life,the causes,including blood sugar fluctuations,are difficult to elucidate due to limitations ... BACKGROUND Although dumping symptoms constitute the most common post-gastrectomy syndromes impairing patient quality of life,the causes,including blood sugar fluctuations,are difficult to elucidate due to limitations in examining dumping symptoms as they occur.AIM To investigate relationships between glucose fluctuations and the occurrence of dumping symptoms in patients undergoing gastrectomy for gastric cancer.METHODS Patients receiving distal gastrectomy with Billroth-I(DG-BI)or Roux-en-Y reconstruction(DG-RY)and total gastrectomy with RY(TG-RY)for gastric cancer(March 2018-January 2020)were prospectively enrolled.Interstitial tissue glycemic profiles were measured every 15 min,up to 14 d,by continuous glucose monitoring.Dumping episodes were recorded on 5 patient-selected days by diary.Within 3 h postprandially,dumping-associated glycemic changes were defined as a dumping profile,those without symptoms as a control profile.These profiles were compared.RESULTS Thirty patients were enrolled(10 DG-BI,10 DG-RY,10 TG-RY).The 47 early dumping profiles of DG-BI showed immediately sharp rises after a meal,which 47 control profiles did not(P<0.05).Curves of the 15 late dumping profiles of DG-BI were similar to those of early dumping profiles,with lower glycemic levels.DGRY and TG-RY late dumping profiles(7 and 13,respectively)showed rapid glycemic decreases from a high glycemic state postprandially to hypoglycemia,with a steeper drop in TG-RY than in DG-RY.CONCLUSION Postprandial glycemic changes suggest dumping symptoms after standard gastrectomy for gastric cancer.Furthermore,glycemic profiles during dumping may differ depending on reconstruction methods after gastrectomy. 展开更多
关键词 Gastric cancer GASTRECTOMY Billroth-I reconstruction Roux-en-Y reconstruction dumping syndrome Continuous glucose monitoring
下载PDF
Numerical Simulation of Subcooled Boiling Inside High-Heat-Flux Component with Swirl Tube in Neutral Beam Injection System
13
作者 陶玲 胡纯栋 谢远来 《Plasma Science and Technology》 SCIE EI CAS CSCD 2014年第5期512-520,共9页
In order to realize steady-state operation of the neutral beam injection(NBI) system with high beam energy,an accurate thermal analysis and a prediction about working conditions of heat-removal structures inside hig... In order to realize steady-state operation of the neutral beam injection(NBI) system with high beam energy,an accurate thermal analysis and a prediction about working conditions of heat-removal structures inside high-heat-flux(HHF) components in the system are key issues.In this paper,taking the HHF ion dump with swirl tubes in NBI system as an example,an accurate thermal dynamic simulation method based on computational fluid dynamics(CFD) and the finite volume method is presented to predict performance of the HHF component.In this simulation method,the Eulerian multiphase method together with some empirical corrections about the inter-phase transfer model and the wall heat flux partitioning model are considered to describe the subcooled boiling.The reliability of the proposed method is validated by an experimental example with subcooled boiling inside swirl tube.The proposed method provides an important tool for the refined thermal and flow dynamic analysis of HHF components,and can be extended to study the thermal design of other complex HHF engineering structures in a straightforward way.The simulation results also verify that the swirl tube is a promising heat removing structure for the HHF components of the NBI system. 展开更多
关键词 neutral beam injection system swirl tube subcooled boiling computational fluid dynamics high-heat-flux component ion dump
下载PDF
Slope stability of increasing height and expanding capacity of south dumping site of Hesgoula coal mine:a case study
14
作者 Weidong Pan Weiliang Pan +3 位作者 Jianyang Luo Long Fan Shaocheng Li Ulziikhutag Erdenebileg 《International Journal of Coal Science & Technology》 EI CAS CSCD 2021年第3期427-440,共14页
This paper is devoted to improve the containment capacity of the Hesgoula south dumping site.The general geology of the dumping site was obtained through geological surveys.Physico-mechanical properties of silty clay ... This paper is devoted to improve the containment capacity of the Hesgoula south dumping site.The general geology of the dumping site was obtained through geological surveys.Physico-mechanical properties of silty clay and bedrock layers that have a large impact on the stability of the dump were measured by direct shear tests and triaxial tests in laboratory.Then ultimate bearing capacity of the substrate were analyzed and calculated.This paper proposed three capacity expansion and increase plans and used GeoStudio software for comparison.Through computation of the stability of the dump site slope after capacity expansion and increase for each plan,the capacity expansion plan was determined.The capacity expansion and increase plan will solve the problem of the current insufficient containment capacity of the Hesgoula south dumping site,which is of great significance for saving mine transportation costs,improving work efficiency,and reducing grassland occupation. 展开更多
关键词 Dump slope Increasing height and expanding capacity Soft base Ultimate bearing capacity
下载PDF
Study on Improvement of Dumping Site Stability in Weak Geological Condition by Using Compacted Layer
15
作者 Takashi Sasaoka Tri Karian +3 位作者 Tsedendorj Amarsaikhan Akihiro Hamanaka Hideki Shimada Kikuo Matsui 《Open Journal of Geology》 2015年第3期144-155,共12页
Berau Basin, a sub-basin of Tarakan Basin, had been developed during Eocene to Miocene period. Rocks in Berau Basin consist of sedimentary, volcanic and igneous rocks aged from Pre-tertiary until Quaternary epoch. The... Berau Basin, a sub-basin of Tarakan Basin, had been developed during Eocene to Miocene period. Rocks in Berau Basin consist of sedimentary, volcanic and igneous rocks aged from Pre-tertiary until Quaternary epoch. The youngest identified rock formation was alluvial deposit consists of mud, silt, sand, gravel and swamp with brown to dark color. This youngest rock formation is relatively weak geological condition and can cause problems in the coal mining operation. PT Berau Coal as one of the coal mining companies in Berau Basin area had experienced some problems related to the occurrence of alluvial deposit. A large failure has occurred at one of its out pit dumping?area which lies over the swamp material. The failure caused a higher operating cost since it made that the distance for waste rock dumping became to be farther than the designated area. Therefore, in order to prevent similar failure occurring at dumping area which lies above swamp material, an improvement of dumping site stability on weak geological condition has to be needed. The proposed method for improving the stability of out pit dumping area in weak geological condition is to construct the compacted layer of waste rock before the out pit dumping area construction. Based on experimental results, a minimum of 40 kPa pressure is needed to give a proper compaction to the waste rock. The result of numerical analysis by Finite Element Method (FEM) shows that construction of compacted layer on the base of out pit dumping area can improve its stability. 展开更多
关键词 SWAMP Material Coal Mining Out PIT DUMP Waste ROCK COMPACTED Layer
下载PDF
Turning ash dumping yards into cultivated land
16
作者 Yu Keming Zhang Yongquan Xuzhou Electric Power Bureau Qiu Changqing 《Electricity》 1990年第2期27-30,共4页
I.IntroductionIt is common practice to dump the largequantity of fly ash collected from the burn-ing of pulverized coal in coal-fired thermal powerstations in ash dumping yards constructed overlow-lying land or in the... I.IntroductionIt is common practice to dump the largequantity of fly ash collected from the burn-ing of pulverized coal in coal-fired thermal powerstations in ash dumping yards constructed overlow-lying land or in the mountain valleys,whichnot only occupies large areas of land,but is alsoa public nuisance when the dried fly ash is blownup by wind.In the past it was advocated to coverthe ash dump with a layer of soil to prevent theash from being stirred up and also to grow cropson the soil-covered fly ash.Success to someextent has been claimed.However,to cover thelarge areas of ash dump requires considerablequantity of soil:to surface an ash dump of 100hectares with a thickness of only 0.2m willrequire 200,000m^3 of soil.Under the 展开更多
关键词 dumping CULTIVATED claimed LYING FERTILIZER VEGETABLES Jiangsu SHANDONG cultivation boron
下载PDF
600WM汽轮机高压主汽门及高压调门DUMP阀故障分析与处理 被引量:1
17
作者 孟庆军 《山东工业技术》 2023年第1期116-119,共4页
介绍了DUMP阀的作用、结构原理,结合某电厂高压主汽门、高压调门几次故障案例,分析研究DUMP阀发生故障的原因,并提出相应的处理措施,为类似问题的解决提供了参考和借鉴。
关键词 汽轮机 高压主汽门 高压调门 DUMP阀
下载PDF
Legacy Gold Mine Sites & Dumps in the Witwatersrand: Challenges and Required Action
18
作者 Sunday Mishack Mabaso 《Natural Resources》 CAS 2023年第5期65-77,共13页
Legacy mine shafts and waste dumps in the Witwatersrand continue to create social and environmental challenges for communities, even in areas where gold mining ceased over 100 years ago. The slow pace of eradication o... Legacy mine shafts and waste dumps in the Witwatersrand continue to create social and environmental challenges for communities, even in areas where gold mining ceased over 100 years ago. The slow pace of eradication of these gold mine shafts and waste dumps (or lack thereof) results in conflict between the communities and authorities, particularly the Department of Mineral Resources and Energy (DMRE) as the relevant authority in the field of environmental management in mining. This paper examines, through a literature review, the past and present legislative framework that resulted in legacy mine shafts and dumps and how communities find themselves living next to these mine sites, which results in social and environmental problems. The paper further explores the governments, particularly the DMRE, proposed initiatives to empower those who intend to extract value from the abandoned mines while curbing the scourge of crime in affected communities. 展开更多
关键词 Mine Waste Dumps COMMUNITIES Pollution CHALLENGES
下载PDF
Cycle Time Analysis of Open Pit Mining Dump Trucks
19
作者 Baatarchuluun Enkhchuluun Bat-Ochir Batgerel Cao Ping 《International Journal of Geosciences》 2023年第8期689-709,共21页
This study demonstrates a practical cycle time analysis of dump truck haulage system of “Ukhaa Khudag” open-pit coal mine located in Umnugobi Province, Mongolia. It examines the possibility of minimizing the cycle t... This study demonstrates a practical cycle time analysis of dump truck haulage system of “Ukhaa Khudag” open-pit coal mine located in Umnugobi Province, Mongolia. It examines the possibility of minimizing the cycle time of the haulage system as well as factors impacting the speed of the dump truck. The current study divides the open pit mine road for the dump trucks into five sections which are bench road, ramp, surface road, dump road uphill, and dump road. Meanwhile, it investigates the influence of the length, the grade, and the rolling resistance of the road section on the cycle time. The data is analyzed using mathematical regression methods via Microsoft Excel program. For each of the five road sections, we compare the statistical calculations of three regression models: linear, quadratic and exponential;thus, a total of thirty regression models are obtained in this research. Accordingly, the cycle time for each road section is predicted by the most accountable model. The loaded and empty direction of the movement is measured and calculated for each road section, and it appears that the difference between the calculated mean value and the actual cycle time of the models is 0.82 seconds with a relative error of 2.51 percent. 展开更多
关键词 Dump Truck Cycle Time Mine Haul Road Regression Analysis
下载PDF
中国荷斯坦公牛CN和DUMPS遗传缺陷检测及系谱分析 被引量:5
20
作者 谢岩 范学华 +7 位作者 吴晓平 张毅 刘林 公维嘉 陈绍祜 孙东晓 张胜利 张沅 《畜牧兽医学报》 CAS CSCD 北大核心 2012年第3期376-381,共6页
旨在研究中国荷斯坦牛中瓜氨酸血症(Citrullinemia,CN)和尿苷酸核酶缺乏症(Deficiency of uridinemonophosphate synthase,DUMPS)2种遗传缺陷的携带者比率及系谱来源,并构建更简便的检测方法。本研究通过PCR-RFLP方法对参加我国联合青... 旨在研究中国荷斯坦牛中瓜氨酸血症(Citrullinemia,CN)和尿苷酸核酶缺乏症(Deficiency of uridinemonophosphate synthase,DUMPS)2种遗传缺陷的携带者比率及系谱来源,并构建更简便的检测方法。本研究通过PCR-RFLP方法对参加我国联合青年公牛后裔测定和良种补贴项目的591头荷斯坦公牛进行了大规模CN和DUMPS的遗传缺陷检测,并构建了奶牛CN隐性有害基因的AS-PCR检测技术。结果,共发现2头CN和1头DUMPS隐性有害基因携带者公牛,携带者比例分别为0.34%和0.17%。经过系谱追溯,2头CN携带者公牛均为澳大利亚公牛Linmack Kriss King-CN后代,DUMPS携带者公牛为美国公牛Skokie sensation Ned后代。基于此,我国有必要尽快建立荷斯坦牛隐性遗传缺陷监控体系并进行系谱标注,通过青年公牛预选和选种选配,避免携带者公牛进入后裔测定和良种补贴项目,以逐步降低我国奶牛群体中隐性有害等位基因频率。 展开更多
关键词 中国荷斯坦牛 CN DUMPS 遗传缺陷
下载PDF
上一页 1 2 8 下一页 到第
使用帮助 返回顶部