期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Dynamic and Integrated Load-Balancing Scheduling Algorithm for Cloud Data Centers 被引量:6
1
作者 田文洪 赵勇 +2 位作者 仲元椋 徐敏贤 景晨 《China Communications》 SCIE CSCD 2011年第6期117-126,共10页
One of the challenging scheduling problems in Cloud data centers is to take the allocation and migration of reconfigurable virtual machines as well as the integrated features of hosting physical machines into consider... One of the challenging scheduling problems in Cloud data centers is to take the allocation and migration of reconfigurable virtual machines as well as the integrated features of hosting physical machines into consideration. We introduce a Dynamic and Integrated Resource Scheduling algorithm (DAIRS) for Cloud data centers. Unlike traditional load-balance scheduling algorithms which often consider only one factor such as the CPU load in physical servers, DAIRS treats CPU, memory and network bandwidth integrated for both physical machines and virtual machines. We develop integrated measurement for the total imbalance level of a Cloud datacenter as well as the average imbalance level of each server. Simulation results show that DAIRS has good performance with regard to total imbalance level, average imbalance level of each server, as well as overall running time. 展开更多
关键词 cloud computing load balance dynamic and integrated resource scheduling algorithm cloud datacenter
下载PDF
DYNAMIC ADVANCED PLANNING AND SCHEDULING WITH FROZEN INTERVAL FOR NEW ORDERS 被引量:2
2
作者 CHEN Kejia JI Ping 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2007年第4期117-119,共3页
A dynamic advanced planning and scheduling (DAPS) problem is addressed where new orders arrive on a continuous basis. A periodic policy with frozen interval is adopted to increase stability on the shop floor. A gene... A dynamic advanced planning and scheduling (DAPS) problem is addressed where new orders arrive on a continuous basis. A periodic policy with frozen interval is adopted to increase stability on the shop floor. A genetic algorithm is developed to find a schedule at each rescheduling point for both original orders and new orders that both production idle time and penalties on tardiness and earliness of orders are minimized. The proposed methodology is tested on a small example to illustrate the effect of the frozen interval. The results indicate that the suggested approach can improve the schedule stability while retaining efficiency. 展开更多
关键词 dynamic advanced planning and scheduling Genetic algorithm Frozen interval
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部