In this paper, a single-machine scheduling model with a given common due date and simple linear processing times was considered. The objective is the total weighted tardiness penalty and earliness award. Some polynomi...In this paper, a single-machine scheduling model with a given common due date and simple linear processing times was considered. The objective is the total weighted tardiness penalty and earliness award. Some polynomial time solvable cases for this problem are given. A dynamic programming algorithm was provided and a branch and bound algorithm for general case of the problem was provided based on a rapid method for estimating the lower bound.展开更多
In this paper, a single-machine scheduling model with a given common due date is considered. Job processing time is a linear decreasing function of its starting time. The objective function is to minimize the total we...In this paper, a single-machine scheduling model with a given common due date is considered. Job processing time is a linear decreasing function of its starting time. The objective function is to minimize the total weighted earliness award and tardiness penalty. Our aim is to find an optimal schedule so as to minimize the objective function. As the problem is NP-hard, some properties and polynomial time solvable cases of this problem are given. A dynamic programming algorithm for the general case of the problem is provided.展开更多
Considering the imprecise nature of the data in real-world problems, the earliness/tardiness (E/T) fiowshop scheduling problem with uncertain processing time and distinct due windows is concerned in this paper. A fu...Considering the imprecise nature of the data in real-world problems, the earliness/tardiness (E/T) fiowshop scheduling problem with uncertain processing time and distinct due windows is concerned in this paper. A fuzzy scheduling model is established and then transformed into a deterministic one by employing the method of maximizing the membership function of middle value. Moreover, an effective scatter search based particle swarm optimization (SSPSO) algorithm is proposed to minimize the sum of total earliness and tardiness penalties. The proposed SSPSO algorithm incorporates the scatter search (SS) algorithm into the frame of particle swarm optimization (PSO) algorithm and gives full play to their characteristics of fast convergence and high diversity. Besides, a differential evolution (DE) scheme is used to generate solutions in the SS. In addition, the dynamic update strategy and critical conditions are adopted to improve the performance of SSPSO. The simulation results indicate the superiority of SSPSO in terms of effectiveness and efficiency.展开更多
To describe the earliness/tardiness production planning problems in the JIT environment, a nonlinear semi\|infinite programming model was proposed in \. Due to a nonconvex objective function and many infinite constrai...To describe the earliness/tardiness production planning problems in the JIT environment, a nonlinear semi\|infinite programming model was proposed in \. Due to a nonconvex objective function and many infinite constraints, the model is difficult to be solved by traditional methods. In this paper, simulated annealing method combined with a heuristic is developed. Numerical results shows that the present approach is very efficient. Theoretically, the developed method is an attempt to solve a continuous domain problem by using simulated annealing.展开更多
The intense competition in the current marketplace ha s forced firms to reexamine their methods of doing business, using superior manu facturing practices in the form of just-in-time (JIT), production with JIT pra cti...The intense competition in the current marketplace ha s forced firms to reexamine their methods of doing business, using superior manu facturing practices in the form of just-in-time (JIT), production with JIT pra ctices pursue completion on time and zero inventory, which is often instruct ed according to the custom’s demand or the sale contract. Earliness and tardine ss are undesirable because both of them will bring the extra cost, cost will als o be increased by some factors such as operation condition, intermediate storage , clean method, etc, to minimize the total cost is often the main scheduling objective, but sometime it is most important for factories to eliminate the tar diness cost in order to maintain the commercial credit and to avoid penalty, the refore, minimum of tardiness cost becomes the first objective. It is more import ant to select a reasonable objective by the actual condition during scheduli ng. In this paper scheduling problem of chemical batch process with due date is studied, two different intermediate storage policies and two different productio n modes are also discussed, production scheduling with different intermediate st orage policy and different production mode is proposed and the result is compare d. In order to complete all products within the due date, not only earliness and tardiness but also holding problem is considered, the objective is to selec t a proper intermediate storage policy and production mode and to minimize the c ost resulted by the earliness and tardiness, even the cost result by the interme diate storage. Scheduling with multiple stage and multiple machine is known as a NP-hard problem, mathematical program (MP) method, such as branch-and-bound (BAB), mixed integer linear program (MILP), etc, is often used to solve the sche duling problem. But as is well known, MP method is not good for combination opti mization, especially for large scale and complex optimal problem, whereas geneti c algorithm (GA) can overcome the MP method’s shortcoming and is fit for solvin g such scheduling problem. In this paper a modified genetic algorithm with speci al crossover operator and mutation operator is presented to solve this schedulin g problem. The results show such problem can be solved effectively with the pres ented method.展开更多
The number of tardy jobs of the single machine scheduling problem with a variable processing time is studied in accordance with the published instances of traffic transportation management engineering. It is proved ...The number of tardy jobs of the single machine scheduling problem with a variable processing time is studied in accordance with the published instances of traffic transportation management engineering. It is proved by 3 partition problem that if the problem is of ready time and common deadline constrained, its complexity is NP hard in the strong sense. Finally, a polynomial algorithm for solving unit processing time and common deadline problems is proposed.展开更多
In this paper, we give a mathematical model for earliness-tardiness job scheduling problem with a common due window on parallel and non-identical machines. Because the job scheduling problem discussed in the paper con...In this paper, we give a mathematical model for earliness-tardiness job scheduling problem with a common due window on parallel and non-identical machines. Because the job scheduling problem discussed in the paper contains a problem of minimizing make-span, which is NP-complete on parallel and uniform machines, a heuristic algorithm is presented to find an approximate solution for the scheduling problem after proving an important theorem. Two numerical examples illustrate that the heuristic algorithm is very useful and effective in obtaining the near-optimal solution.展开更多
基金supported by the National Natural Science Foundation of China (Grant No.19771057)
文摘In this paper, a single-machine scheduling model with a given common due date and simple linear processing times was considered. The objective is the total weighted tardiness penalty and earliness award. Some polynomial time solvable cases for this problem are given. A dynamic programming algorithm was provided and a branch and bound algorithm for general case of the problem was provided based on a rapid method for estimating the lower bound.
文摘In this paper, a single-machine scheduling model with a given common due date is considered. Job processing time is a linear decreasing function of its starting time. The objective function is to minimize the total weighted earliness award and tardiness penalty. Our aim is to find an optimal schedule so as to minimize the objective function. As the problem is NP-hard, some properties and polynomial time solvable cases of this problem are given. A dynamic programming algorithm for the general case of the problem is provided.
基金supported by National Natural Science Foundation of China(Nos.61174040 and 61104178)Shanghai Commission of Science and Technology(No.12JC1403400)the Fundamental Research Funds for the Central Universities
文摘Considering the imprecise nature of the data in real-world problems, the earliness/tardiness (E/T) fiowshop scheduling problem with uncertain processing time and distinct due windows is concerned in this paper. A fuzzy scheduling model is established and then transformed into a deterministic one by employing the method of maximizing the membership function of middle value. Moreover, an effective scatter search based particle swarm optimization (SSPSO) algorithm is proposed to minimize the sum of total earliness and tardiness penalties. The proposed SSPSO algorithm incorporates the scatter search (SS) algorithm into the frame of particle swarm optimization (PSO) algorithm and gives full play to their characteristics of fast convergence and high diversity. Besides, a differential evolution (DE) scheme is used to generate solutions in the SS. In addition, the dynamic update strategy and critical conditions are adopted to improve the performance of SSPSO. The simulation results indicate the superiority of SSPSO in terms of effectiveness and efficiency.
文摘To describe the earliness/tardiness production planning problems in the JIT environment, a nonlinear semi\|infinite programming model was proposed in \. Due to a nonconvex objective function and many infinite constraints, the model is difficult to be solved by traditional methods. In this paper, simulated annealing method combined with a heuristic is developed. Numerical results shows that the present approach is very efficient. Theoretically, the developed method is an attempt to solve a continuous domain problem by using simulated annealing.
文摘The intense competition in the current marketplace ha s forced firms to reexamine their methods of doing business, using superior manu facturing practices in the form of just-in-time (JIT), production with JIT pra ctices pursue completion on time and zero inventory, which is often instruct ed according to the custom’s demand or the sale contract. Earliness and tardine ss are undesirable because both of them will bring the extra cost, cost will als o be increased by some factors such as operation condition, intermediate storage , clean method, etc, to minimize the total cost is often the main scheduling objective, but sometime it is most important for factories to eliminate the tar diness cost in order to maintain the commercial credit and to avoid penalty, the refore, minimum of tardiness cost becomes the first objective. It is more import ant to select a reasonable objective by the actual condition during scheduli ng. In this paper scheduling problem of chemical batch process with due date is studied, two different intermediate storage policies and two different productio n modes are also discussed, production scheduling with different intermediate st orage policy and different production mode is proposed and the result is compare d. In order to complete all products within the due date, not only earliness and tardiness but also holding problem is considered, the objective is to selec t a proper intermediate storage policy and production mode and to minimize the c ost resulted by the earliness and tardiness, even the cost result by the interme diate storage. Scheduling with multiple stage and multiple machine is known as a NP-hard problem, mathematical program (MP) method, such as branch-and-bound (BAB), mixed integer linear program (MILP), etc, is often used to solve the sche duling problem. But as is well known, MP method is not good for combination opti mization, especially for large scale and complex optimal problem, whereas geneti c algorithm (GA) can overcome the MP method’s shortcoming and is fit for solvin g such scheduling problem. In this paper a modified genetic algorithm with speci al crossover operator and mutation operator is presented to solve this schedulin g problem. The results show such problem can be solved effectively with the pres ented method.
文摘The number of tardy jobs of the single machine scheduling problem with a variable processing time is studied in accordance with the published instances of traffic transportation management engineering. It is proved by 3 partition problem that if the problem is of ready time and common deadline constrained, its complexity is NP hard in the strong sense. Finally, a polynomial algorithm for solving unit processing time and common deadline problems is proposed.
基金Zhejiang Provincial Natural Science Foundation (No. 698069) and High-Tech. Research andDevelopment Program (No. 863-511-945-002)
文摘In this paper, we give a mathematical model for earliness-tardiness job scheduling problem with a common due window on parallel and non-identical machines. Because the job scheduling problem discussed in the paper contains a problem of minimizing make-span, which is NP-complete on parallel and uniform machines, a heuristic algorithm is presented to find an approximate solution for the scheduling problem after proving an important theorem. Two numerical examples illustrate that the heuristic algorithm is very useful and effective in obtaining the near-optimal solution.