Stabilizing pile is a kind of earth shoring structure frequently used in slope engineering. When the piles have cantilever segments above the ground,laggings are usually installed to avoid collapse of soil between pil...Stabilizing pile is a kind of earth shoring structure frequently used in slope engineering. When the piles have cantilever segments above the ground,laggings are usually installed to avoid collapse of soil between piles. Evaluating the earth pressure acting on laggings is of great importance in design process.Since laggings are usually less stiff than piles,the lateral pressure on lagging is much closer to active earth pressure. In order to estimate the lateral earth pressure on lagging more accurately,first,a model test of cantilever stabilizing pile and lagging systems was carried out. Then,basing the experimental results a three-dimensional sliding wedge model was established. Last,the calculation process of the total active force on lagging is presented based on the kinematic approach of limit analysis. A comparison is made between the total active force on lagging calculated by the formula presented in this study and the force on a same-size rigid retaining wall obtained from Rankine's theory. It is found that the proposed method fits well with the experimental results.Parametric studies show that the total active force on lagging increases with the growth of the lagging height and the lagging clear span; while decreases asthe soil internal friction angle and soil cohesion increase.展开更多
针对高速公路具有明显的地理特征,其桥梁桩基施工存在较大不确定性和较高风险的问题,使用SQL server 2008数据库进行数据表设计和存储,在Visual Studio 2010平台上采用C#语言开发了"基于Google Earth的高速公路桩基施工可视化管理...针对高速公路具有明显的地理特征,其桥梁桩基施工存在较大不确定性和较高风险的问题,使用SQL server 2008数据库进行数据表设计和存储,在Visual Studio 2010平台上采用C#语言开发了"基于Google Earth的高速公路桩基施工可视化管理系统"。该系统应用于江罗高速14标桥梁桩基施工管理中,实现桩基施工质量、现场进度和施工安全的可视化、数字化、信息化管理,提升了施工企业信息化管理水平。展开更多
This paper is built upon the previous developments on lateral earth pressure by providing a series of analytical expressions that may be used to evaluate vertical profiles of the effective stress and the corresponding...This paper is built upon the previous developments on lateral earth pressure by providing a series of analytical expressions that may be used to evaluate vertical profiles of the effective stress and the corresponding suction stress under steady-state flow conditions. Suction stress profile is modeled for one layer sand near the ground above the water level under hydrostatic conditions. By definition, the absolute magnitude of suction stress depends on both the magnitude of the effective stress parameter and matric suction itself. Thus, by developing the Rankine’s relations in seismic state, the composing method of active and passive surfaces in sides of unbraced sheet pile is examinated and the effects of soil parameter on those surfaces are evaluated by a similar process. The relations described the quantitative evaluation of lateral earth pressure on sheet pile and the effects of unsaturated layer on bending moment and embedded depth of sheet pile in soil.展开更多
基金financially supported by the National Key Technology Research and Development Program of the Ministry of Science and Technology of China under Grant No. 2012BAJ22B06
文摘Stabilizing pile is a kind of earth shoring structure frequently used in slope engineering. When the piles have cantilever segments above the ground,laggings are usually installed to avoid collapse of soil between piles. Evaluating the earth pressure acting on laggings is of great importance in design process.Since laggings are usually less stiff than piles,the lateral pressure on lagging is much closer to active earth pressure. In order to estimate the lateral earth pressure on lagging more accurately,first,a model test of cantilever stabilizing pile and lagging systems was carried out. Then,basing the experimental results a three-dimensional sliding wedge model was established. Last,the calculation process of the total active force on lagging is presented based on the kinematic approach of limit analysis. A comparison is made between the total active force on lagging calculated by the formula presented in this study and the force on a same-size rigid retaining wall obtained from Rankine's theory. It is found that the proposed method fits well with the experimental results.Parametric studies show that the total active force on lagging increases with the growth of the lagging height and the lagging clear span; while decreases asthe soil internal friction angle and soil cohesion increase.
文摘针对高速公路具有明显的地理特征,其桥梁桩基施工存在较大不确定性和较高风险的问题,使用SQL server 2008数据库进行数据表设计和存储,在Visual Studio 2010平台上采用C#语言开发了"基于Google Earth的高速公路桩基施工可视化管理系统"。该系统应用于江罗高速14标桥梁桩基施工管理中,实现桩基施工质量、现场进度和施工安全的可视化、数字化、信息化管理,提升了施工企业信息化管理水平。
文摘This paper is built upon the previous developments on lateral earth pressure by providing a series of analytical expressions that may be used to evaluate vertical profiles of the effective stress and the corresponding suction stress under steady-state flow conditions. Suction stress profile is modeled for one layer sand near the ground above the water level under hydrostatic conditions. By definition, the absolute magnitude of suction stress depends on both the magnitude of the effective stress parameter and matric suction itself. Thus, by developing the Rankine’s relations in seismic state, the composing method of active and passive surfaces in sides of unbraced sheet pile is examinated and the effects of soil parameter on those surfaces are evaluated by a similar process. The relations described the quantitative evaluation of lateral earth pressure on sheet pile and the effects of unsaturated layer on bending moment and embedded depth of sheet pile in soil.