期刊文献+
共找到8篇文章
< 1 >
每页显示 20 50 100
Evaluation and prediction of earth pressure balance shield performance in complex rock strata:A case study in Dalian,China 被引量:1
1
作者 Xiang Shen Dajun Yuan +2 位作者 Xing-Tao Lin Xiangsheng Chen Yuansheng Peng 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2023年第6期1491-1505,共15页
This research explores the potential for the evaluation and prediction of earth pressure balance shield performance based on a gray system model.The research focuses on a shield tunnel excavated for Metro Line 2 in Da... This research explores the potential for the evaluation and prediction of earth pressure balance shield performance based on a gray system model.The research focuses on a shield tunnel excavated for Metro Line 2 in Dalian,China.Due to the large error between the initial geological exploration data and real strata,the project construction is extremely difficult.In view of the current situation regarding the project,a quantitative method for evaluating the tunneling efficiency was proposed using cutterhead rotation(R),advance speed(S),total thrust(F)and torque(T).A total of 80 datasets with three input parameters and one output variable(F or T)were collected from this project,and a prediction framework based gray system model was established.Based on the prediction model,five prediction schemes were set up.Through error analysis,the optimal prediction scheme was obtained from the five schemes.The parametric investigation performed indicates that the relationships between F and the three input variables in the gray system model harmonize with the theoretical explanation.The case shows that the shield tunneling performance and efficiency are improved by the tunneling parameter prediction model based on the gray system model. 展开更多
关键词 Evaluation of earth pressure balance shield PERFORMANCE Gray system model Metro construction Rock strata Field data prediction
下载PDF
Feasibility study of tar sands conditioning for earth pressure balance tunnelling 被引量:7
2
作者 D.Martinelli D.Peila E.Campa 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2015年第6期684-690,共7页
This paper presents the results of laboratory test on the feasibility of soil conditioning for earth pressurebalance (EPB) excavation in a tar sand, which is a natural material never studied in this respect. Thelabo... This paper presents the results of laboratory test on the feasibility of soil conditioning for earth pressurebalance (EPB) excavation in a tar sand, which is a natural material never studied in this respect. Thelaboratory test performed is based on a procedure and methods used in previous studies with differenttypes of soils, but for this special complex material, additional tests are also conducted to verify particularproperties of the tar sands, such as the tilt test and vane shear test usually used in cohesive materials, anda direct shear test. The laboratory test proves that the test procedure is applicable also to this type of soiland the conditioned material can be considered suitable for EPB excavations, although it is necessary touse a certain percentage of fine elements (filler) to create a material suitable to be mixed with foam. Thetest results show that the conditioned material fulfils the required standard for an EPB application. 展开更多
关键词 TUNNELLING earth pressure balance(EPB) Soil conditioning Tar sands Laboratory test
下载PDF
Deviation correction strategy for the earth pressure balance shield based on shield–soil interactions 被引量:1
3
作者 Liang TANG Xiangxun KONG +3 位作者 Xianzhang LING Yize ZHAO Wenchong TANG Yifan ZHANG 《Frontiers of Mechanical Engineering》 SCIE CSCD 2022年第2期225-239,共15页
The control system presently used in shield posture rectification is based on driver experience,which is marginally reliable.The study of the related theory is flawed.Therefore,a decision-making approach for the devia... The control system presently used in shield posture rectification is based on driver experience,which is marginally reliable.The study of the related theory is flawed.Therefore,a decision-making approach for the deviation correction trajectory and posture rectification load for an earth pressure balance(EPB)shield is proposed.A calculation model of posture rectification load of an EPB shield is developed by considering the interactions among the cutter head,shield shell,and ground.The additional position change during the shield attitude correction is highlighted.The posture rectification loads and shield behaviors results can be solved by the proposed method.The influences of the stratum distribution(i.e.,bedrock height in the upper-soft and lower-hard strata)on shield behaviors and posture rectification loads are analyzed.Results indicated that the increase of pitch angle in the upper-soft and lower-hard strata causes a sharp rise in vertical displacement.The bedrock height increases the magnitudes of the required posture rectification moments when hr/D>0.5.For a tunnel with hr/D≤0.5,the variation of hr/D has little effect on the posture rectification moments.Finally,the posture rectifying curves based on the theoretical model are compared with the target ones based on the double circular arc interpolation method.The required results can be obtained regardless of the soil–rock compound stratum distribution.The maximum rectification moment in the rock layer is almost 12.6 times that in the soil layer.Overall,this study provides a valuable reference for moment determination and the trajectory prediction of posture rectification in compound strata. 展开更多
关键词 additional position change deviation correction trajectory earth pressure balance shield mechanical model posture rectification
原文传递
Experimental study on workability and permeability of sandy soils conditioned with thickened foam
4
作者 Zhiyao Feng Shuying Wang +2 位作者 Tongming Qu Xiangcou Zheng Fanlin Ling 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第2期532-544,共13页
Water spewing and muck plugging often occur during earth pressure balance(EPB)shield machines tunnelling in water-rich sandy strata,even though the conventional foam has been employed to condition sandy soils.In this ... Water spewing and muck plugging often occur during earth pressure balance(EPB)shield machines tunnelling in water-rich sandy strata,even though the conventional foam has been employed to condition sandy soils.In this study,a novel thickened foaming agent suitable for EPB shield tunnelling in water-rich sandy strata is developed.In contrast to conventional foam-conditioned sands,the thickened foam-conditioned sand has a low permeability due to the consistent filling of soil pores with the thickened foam,and the initial permeability coefficient decreases by approximately two orders of magnitude.It also exhibits a suitable workability,which is attributed to the enhanced capability of the thickened foam to condition sandy soils.In addition,the effect of concentration on the stability of the foam is explained by the Gibbs-Marangoni effect,and conditioning mechanisms for the thickened foam on sands are discussed from the evolution of foam bubbles. 展开更多
关键词 earth pressure balance(EPB)shield Thickened foam Foam-conditioned sand PERMEABILITY WORKABILITY
下载PDF
Soft ground tunnel lithology classification using clustering-guided light gradient boosting machine
5
作者 Kursat Kilic Hajime Ikeda +1 位作者 Tsuyoshi Adachi Youhei Kawamura 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2023年第11期2857-2867,共11页
During tunnel boring machine(TBM)excavation,lithology identification is an important issue to understand tunnelling performance and avoid time-consuming excavation.However,site investigation generally lacks ground sam... During tunnel boring machine(TBM)excavation,lithology identification is an important issue to understand tunnelling performance and avoid time-consuming excavation.However,site investigation generally lacks ground samples and the information is subjective,heterogeneous,and imbalanced due to mixed ground conditions.In this study,an unsupervised(K-means)and synthetic minority oversampling technique(SMOTE)-guided light-gradient boosting machine(LightGBM)classifier is proposed to identify the soft ground tunnel classification and determine the imbalanced issue of tunnelling data.During the tunnel excavation,an earth pressure balance(EPB)TBM recorded 18 different operational parameters along with the three main tunnel lithologies.The proposed model is applied using Python low-code PyCaret library.Next,four decision tree-based classifiers were obtained in a short time period with automatic hyperparameter tuning to determine the best model for clustering-guided SMOTE application.In addition,the Shapley additive explanation(SHAP)was implemented to avoid the model black box problem.The proposed model was evaluated using different metrics such as accuracy,F1 score,precision,recall,and receiver operating characteristics(ROC)curve to obtain a reasonable outcome for the minority class.It shows that the proposed model can provide significant tunnel lithology identification based on the operational parameters of EPB-TBM.The proposed method can be applied to heterogeneous tunnel formations with several TBM operational parameters to describe the tunnel lithologies for efficient tunnelling. 展开更多
关键词 earth pressure balance(EPB) Tunnel boring machine(TBM) Soft ground tunnelling Tunnel lithology Operational parameters Synthetic minority oversampling technique (SMOTE) K-means clustering
下载PDF
Real-time analysis and prediction of shield cutterhead torque using optimized gated recurrent unit neural network 被引量:6
6
作者 Song-Shun Lin Shui-Long Shen Annan Zhou 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2022年第4期1232-1240,共9页
An accurate prediction of earth pressure balance(EPB)shield moving performance is important to ensure the safety tunnel excavation.A hybrid model is developed based on the particle swarm optimization(PSO)and gated rec... An accurate prediction of earth pressure balance(EPB)shield moving performance is important to ensure the safety tunnel excavation.A hybrid model is developed based on the particle swarm optimization(PSO)and gated recurrent unit(GRU)neural network.PSO is utilized to assign the optimal hyperparameters of GRU neural network.There are mainly four steps:data collection and processing,hybrid model establishment,model performance evaluation and correlation analysis.The developed model provides an alternative to tackle with time-series data of tunnel project.Apart from that,a novel framework about model application is performed to provide guidelines in practice.A tunnel project is utilized to evaluate the performance of proposed hybrid model.Results indicate that geological and construction variables are significant to the model performance.Correlation analysis shows that construction variables(main thrust and foam liquid volume)display the highest correlation with the cutterhead torque(CHT).This work provides a feasible and applicable alternative way to estimate the performance of shield tunneling. 展开更多
关键词 earth pressure balance(EPB)shield tunneling Cutterhead torque(CHT)prediction Particle swarm optimization(PSO) Gated recurrent unit(GRU)neural network
下载PDF
Surface settlements induced by twin tunneling in silty sand
7
作者 K.K.Pabodha M.Kannangara Zhi Ding Wan-Huan Zhou 《Underground Space》 SCIE EI 2022年第1期58-75,共18页
Surface settlements caused by twin tunneling are a major interest in underground space engineering.Most prevailing studies have investigated the surface settlements observed over twin tunnels constructed in clay.Yet,l... Surface settlements caused by twin tunneling are a major interest in underground space engineering.Most prevailing studies have investigated the surface settlements observed over twin tunnels constructed in clay.Yet,less attention is given to the twin tunnels exca-vated in silty sand,which is the focus of this study.A comprehensive field monitoring scheme was designed in the Hangzhou metro line six project to measure the surface settlements during twin tunneling by adopting earth pressure balance shields.The influence of four shield operational parameters,namely,face pressure,tail grouting pressure,penetration rate,and pitching angle on the surface settle-ments due to twin tunneling are explored.In general,the total settlement profiles observed over twin tunnels follow an inverted bimodal shape.The post-settlement observed over the 1^(st)tunnel due to the 2^(nd)tunnel excavation is non-trivial when the twin tunnels are spaced closely.Low face pressure and tail grouting pressure can induce excessive peak surface settlements during twin tunneling in silty sand. 展开更多
关键词 Surface settlement earth pressure balance shield Filed measurement Shield operational parameters
原文传递
Influence factors and calculation model of the adhesion strength of clayey soil for EPB shield tunnelling
8
作者 Shuying Wang Pengfei Liu +2 位作者 Jiazheng Zhong Zhunlin Ni Tongming Qu 《Transportation Safety and Environment》 EI 2022年第3期55-64,共10页
When earth pressure balance (EPB) shield tunnels are constructed through clayey ground, the soil adheres to the cutter, cutterheadand chamber bulkhead due to the high adhesion strength between the steel and the clay, ... When earth pressure balance (EPB) shield tunnels are constructed through clayey ground, the soil adheres to the cutter, cutterheadand chamber bulkhead due to the high adhesion strength between the steel and the clay, thus clogging the shield. To investigatethe influence of different factors on the adhesion strength, this study used montmorillonite, kaolin and mixtures of the two as testsoils. The adhesion strength between the steel and clay is determined with a customized rotary shear apparatus. The results showthat when the consistency index of the soil specimen is less than 1, the adhesion strength between the steel and clay increaseswith the consistency index. As the consistency index decreases, the effect of the normal pressure on the adhesion strength graduallyweakened. As the contact angle of the shear plate increases, thus reducing the hydrophilicity, the adhesion strength decreases. Whenthe soil specimens with different plasticity index values have the same consistency index value, the adhesion strengths are similar.The adhesion strength increases gradually with increasing surface roughness. Based on grey incidence analysis, the order of thefactors affecting the adhesion strength is as follows: normal pressure > consistency index > contact angle > plasticity index ≈ surfaceroughness. The normal pressure, consistency index and contact angle all have important effects on the adhesion strength betweensteel and clay. However, because there are no large differences in the contact angle among the metal materials, the approximateadhesion strength can be calculated by considering the effects of only the normal pressure and consistency index. Themeasures thatare effective for preventing EPB shield clogging are increasing the soil softness and decreasing the hydrophilicity of the cutterheadby applying new materials for the cutters and cutterhead. 展开更多
关键词 earth pressure balance(EPB)shield clayey soil adhesion strength grey theory
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部