期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Optimization of Dead Load State in Earth-Anchored Cable-Stayed Bridges 被引量:4
1
作者 Bin Sun Rucheng Xiao 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2015年第3期87-94,共8页
In order to determine the reasonable completed dead load state in earth-anchored cable-stayed bridges,a practical method is proposed. The method is based on the rigidly supported continuous beam method and the feasibl... In order to determine the reasonable completed dead load state in earth-anchored cable-stayed bridges,a practical method is proposed. The method is based on the rigidly supported continuous beam method and the feasible zone method,emphasizing on the mutual effect between the self-anchored structural parts and the earth-anchored ones. Three cable-stayed bridge models are designed with the main spans of 1 400 m,including a partially earth-anchored cable-stayed bridge,a cable-stayed-suspension bridge and a fully selfanchored cable-stayed bridge,in which the C50 concrete and Q345 steel are adopted. The partially earthanchored cable-stayed bridge and the cable-stayed-suspension bridge secure lower compressive force in the girder than the fully self-anchored cable-stayed bridge by 25 percent at least. The same is for the material consumption of the whole bridge. Furthermore,the anchor volume is more than 20% lower in the partially earthanchored cable-stayed bridge than that in the cable-stayed-suspension bridge. Consequently,the practical span of cable-stayed bridges can be accordingly extended. 展开更多
关键词 CABLE-STAYED BRIDGE partially earth-anchored CABLE-STAYED BRIDGE cable-stayed-suspension BRIDGE REASONABLE completed dead load STATE
下载PDF
Preliminary design and parametric study of 1400 m partially earth-anchored cable-stayed bridge 被引量:17
2
作者 SUN Bin, CHENG Jin & XIAO RuCheng Department of Bridge Engineering, Tongji University, Shanghai 200092, China 《Science China(Technological Sciences)》 SCIE EI CAS 2010年第2期502-511,共10页
The preliminary design and parametric study of 1400 m partially earth-anchored cable-stayed bridge are described. Static per-formance of this new type of bridge is discussed. Compared with fully self-anchored cable-st... The preliminary design and parametric study of 1400 m partially earth-anchored cable-stayed bridge are described. Static per-formance of this new type of bridge is discussed. Compared with fully self-anchored cable-stayed bridge, its advantages in fin-ished state are summarized. Based on numerical calculation, effects of several structural parameters on static performance are presented. 展开更多
关键词 PARTIALLY earth-anchored CABLE-STAYED BRIDGE preliminary design PARAMETRIC study
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部