Recently,the application of Bayesian updating to predict excavation-induced deformation has proven successful and improved prediction accuracy significantly.However,updating the ground settlement profile,which is cruc...Recently,the application of Bayesian updating to predict excavation-induced deformation has proven successful and improved prediction accuracy significantly.However,updating the ground settlement profile,which is crucial for determining potential damage to nearby infrastructures,has received limited attention.To address this,this paper proposes a physics-guided simplified model combined with a Bayesian updating framework to accurately predict the ground settlement profile.The advantage of this model is that it eliminates the need for complex finite element modeling and makes the updating framework user-friendly.Furthermore,the model is physically interpretable,which can provide valuable references for construction adjustments.The effectiveness of the proposed method is demonstrated through two field case studies,showing that it can yield satisfactory predictions for the settlement profile.展开更多
Twin curved tunnels are often encountered in shield tunnelling,where significant complexities in densely exploited underground space are observed.In this study,the ground settlement and tunnel deformation due to twin-...Twin curved tunnels are often encountered in shield tunnelling,where significant complexities in densely exploited underground space are observed.In this study,the ground settlement and tunnel deformation due to twin-curved shield tunnelling in soft ground were investigated using numerical simulation and field monitoring.Different curvature radii of twin curved tunnels and subsequent effects of tunnel construction were considered to reveal the tunnelling effect on ground surface settlement and tunnel deformation.The results show that the settlement trough yields one offset towards inside of curved shield tunnelling.The location of settlement trough and maximum settlement were affected by curvature radius but except for the shape and width of settlement trough.Adjacent parallel twin-curved shield tunnelling could increase the offset of existing settlement trough and maximum settlement.Then,an empirical prediction of surface settlement trough due to twin-curved shield tunnelling with same tunnel diameters in soft clay was proposed,which was applicable to curvature radius less than 800 m.Finally,a minimum radius of 600 m of curvature tunnel was proposed in terms of allowable convergence deformation of tunnel.The result could provide guidance on safety evaluation for twin curved shield tunnelling construction.展开更多
Prediction of tunneling-induced ground settlements is an essential task,particularly for tunneling in urban settings.Ground settlements should be limited within a tolerable threshold to avoid damages to aboveground st...Prediction of tunneling-induced ground settlements is an essential task,particularly for tunneling in urban settings.Ground settlements should be limited within a tolerable threshold to avoid damages to aboveground structures.Machine learning(ML)methods are becoming popular in many fields,including tunneling and underground excavations,as a powerful learning and predicting technique.However,the available datasets collected from a tunneling project are usually small from the perspective of applying ML methods.Can ML algorithms effectively predict tunneling-induced ground settlements when the available datasets are small?In this study,seven ML methods are utilized to predict tunneling-induced ground settlement using 14 contributing factors measured before or during tunnel excavation.These methods include multiple linear regression(MLR),decision tree(DT),random forest(RF),gradient boosting(GB),support vector regression(SVR),back-propagation neural network(BPNN),and permutation importancebased BPNN(PI-BPNN)models.All methods except BPNN and PI-BPNN are shallow-structure ML methods.The effectiveness of these seven ML approaches on small datasets is evaluated using model accuracy and stability.The model accuracy is measured by the coefficient of determination(R2)of training and testing datasets,and the stability of a learning algorithm indicates robust predictive performance.Also,the quantile error(QE)criterion is introduced to assess model predictive performance considering underpredictions and overpredictions.Our study reveals that the RF algorithm outperforms all the other models with the highest model prediction accuracy(0.9)and stability(3.0210^(-27)).Deep-structure ML models do not perform well for small datasets with relatively low model accuracy(0.59)and stability(5.76).The PI-BPNN architecture is proposed and designed for small datasets,showing better performance than typical BPNN.Six important contributing factors of ground settlements are identified,including tunnel depth,the distance between tunnel face and surface monitoring points(DTM),weighted average soil compressibility modulus(ACM),grouting pressure,penetrating rate and thrust force.展开更多
A new technique for the analysis of the three-dimensional collapse failure mechanism and the ground surface settlements for the large-diameter shield tunnels were presented.The technique is based on a velocity field m...A new technique for the analysis of the three-dimensional collapse failure mechanism and the ground surface settlements for the large-diameter shield tunnels were presented.The technique is based on a velocity field model using more different truncated solid conical blocks to clarify the multiblock failure mechanism.Furthermore,the shape of blocks between the failure surface and the tunnel face was considered as an entire circle,and the supporting pressure was assumed as non-uniform distribution on the tunnel face and increased with the tunnel embedded depth.The ground surface settlements and failure mechanism above large-diameter shield tunnels were also investigated under different supporting pressures by the finite difference method.展开更多
Excessive ground surface settlement induced by pit excavation(i.e.braced excavation) can potentially result in damage to the nearby buildings and facilities.In this paper,extensive finite element analyses have been ca...Excessive ground surface settlement induced by pit excavation(i.e.braced excavation) can potentially result in damage to the nearby buildings and facilities.In this paper,extensive finite element analyses have been carried out to evaluate the effects of various structural,soil and geometric properties on the maximum ground surface settlement induced by braced excavation in anisotropic clays.The anisotropic soil properties considered include the plane strain shear strength ratio(i.e.the ratio of the passive undrained shear strength to the active one) and the unloading shear modulus ratio.Other parameters considered include the support system stiffness,the excavation width to excavation depth ratio,and the wall penetration depth to excavation depth ratio.Subsequently,the maximum ground surface settlement of a total of 1479 hypothetical cases were analyzed by various machine learning algorithms including the ensemble learning methods(extreme gradient boosting(XGBoost) and random forest regression(RFR)algorithms).The prediction models developed by the XGBoost and RFR are compared with that of two conventional regression methods,and the predictive accuracy of these models are assessed.This study aims to highlight the technical feasibility and applicability of advanced ensemble learning methods in geotechnical engineering practice.展开更多
Vacuum preloading has been widely used to improve soft soils in coastal areas of China.An increasing amount of evidence from field operations has shown that conventional vacuum preloading is prone to clogging in prefa...Vacuum preloading has been widely used to improve soft soils in coastal areas of China.An increasing amount of evidence from field operations has shown that conventional vacuum preloading is prone to clogging in prefabricated vertical drains(PVDs)and demands a large volume of sand fills.In recent years,air-boosted vacuum preloading has been developed to overcome these limitations;however,this method still requires more data to verify its performance.In this study,a field test for air-boosted vacuum preloading was conducted,and a large-strain two-dimensional(2D)finite element(FE)model was developed and validated against the field test data.Then,a series of FE parametric analyses was performed to assess key factors,i.e.the air injection pressure,the injection spacing,and the characteristics of cyclic injection,which affect the performance of the air-boosted vacuum preloading.The results showed that the ground settlement and lateral displacement of the soils increased due to an increase in the injection pressure,a decrease in the injection spacing,or increases in the number and duration of the injection cycles.Based on the parametric analyses,an empirical formula for ground settlement prediction was proposed and compared with a case history reported in the literature,showing good agreement.展开更多
At present the bored construction method is one of the main construction methods of metro and tunnel construction in China. The empirical estimated formulas of tunnel ground surface settlement using the bored construc...At present the bored construction method is one of the main construction methods of metro and tunnel construction in China. The empirical estimated formulas of tunnel ground surface settlement using the bored construction method were obtained, combining the mechanical stimulant calculated result of tunnel model of different embedded depth, different cross section and different construction method and the actual measurement data of Beijing metro construction. According to the regressed analysis of calculated data, the calculated equations of ground surface settlement value and settlement range of tunnel section under the condition of different embedded depth, different cross section and different construction method were gained. Among them there are some empirical formulas can apply to the construction design of metro tunnel directly.展开更多
Prefabricated vertical drains(PVDs)are commonly used to shorten the drainage path for consolidation as part of the improvement of marine soft ground.Many studies that focus on the primary consolidation settlement of P...Prefabricated vertical drains(PVDs)are commonly used to shorten the drainage path for consolidation as part of the improvement of marine soft ground.Many studies that focus on the primary consolidation settlement of PVD-improved soft ground have been conducted;however,residual settlement has been scarcely investigated.Residual settlement is the net effect of secondary compression and the remaining primary consolidation and generally occurs while the facilities are operating.In this study,residual settlement was investigated using the measured field settlement data obtained from the surface settlement plate and multilayer settlement gauges.This study determined that PVD still has some effect on residual settlement and can reduce the settlement times.Residual settlement is only related to the PVD-improved soil layer and only occurs significantly in the middle zone of that layer over a few months.The middle zone may be related to the time delay of excess pore water pressure dissipation.This study concluded that the remaining primary consolidation in the PVD-improved soil layer is the primary cause of residual settlement,whereas secondary compression in the PVD-improved soil layer is only a minor cause.展开更多
Since different underground engineering contains different geological conditions,structure and excavation methods,their disturbing degree on the ground also differs,but ground surface settlement caused by excavation h...Since different underground engineering contains different geological conditions,structure and excavation methods,their disturbing degree on the ground also differs,but ground surface settlement caused by excavation has one common point that they will form a ground surface settlement curve.Based on data statistical analysis,the article puts forward the relationship between point of inflection in digging tunnels with shallowburied method and the span of tunnel excavation against typical geological conditions in Changchun so as to predict the impact of tunnel excavation and improve reasonable ground surface settlement control standard.Research result will be useful for study on ground surface control standard in digging tunnels with shallow-buried method and setting settlement standard.展开更多
In order to ensure that the tunnel deformation and surface settlement are controlled within the allowable range during the construction process,the design unit has compiled technical measures and monitoring schemes fo...In order to ensure that the tunnel deformation and surface settlement are controlled within the allowable range during the construction process,the design unit has compiled technical measures and monitoring schemes for ground settlement control of this project.Based on the example of a shallow tunneling project on Subway line 8,this paper analyzes and discusses the shallow tunneling method in detail and puts forward corresponding technical measures for ground settlement control.展开更多
Based on the image theory,the analytical solutions of tunneling-induced ground displacement were derived in conjunction with the nonuniform convergence model.The reasonable value of Poisson ratio in the analytical sol...Based on the image theory,the analytical solutions of tunneling-induced ground displacement were derived in conjunction with the nonuniform convergence model.The reasonable value of Poisson ratio in the analytical solution was discussed.The ground settlement width parameter which could reflect the ground condition was introduced to modify the analytical solutions proposed above,and new analytical solutions were presented.To evaluate the validity of the present solutions using the nonuniform convergence model,the results were compared with the observed values for four engineering projects,including 38 measured data of ground settlement.The agreement shows that the present solutions using the nonuniform convergence model are effective for evaluating the tunneling-induced ground displacements.展开更多
The MS8.0 Wenchuan earthquake induced severe landslide hazards.For the first time in China,large numbers of strong motion records were obtained during the Wenchuan earthquake,providing the opportunity to study the rel...The MS8.0 Wenchuan earthquake induced severe landslide hazards.For the first time in China,large numbers of strong motion records were obtained during the Wenchuan earthquake,providing the opportunity to study the relationships between ground-motion parameters and the earthquake-induced landslides.Nearly 40 groups of records from the main shock distributed along the Longmenshan fault lines were used to carry out this study.The results appropriate to the Longmenshan area are as follows:1 The threshold of the peak ground acceleration(PGA) is about 0.7 m/s2.When the PGA reaches 2 m/s2,the landslide hazards are very serious; 2 The threshold of the peak ground velocity(PGV) is about 0.5 m/s.When the PGV reaches 1.5 m/s,severe landslide hazards will be induced; 3 The threshold for the Arias intensity(Ia) is about 0.2 m/s.When the Ia in one horizontal direction reaches 2 m/s,landslide hazards will be very serious; 4 As for the relevance order of the parameters to earthquake-induced landslides,Ia is the leading parameter,followed by PGV,and finally PGA.The results presented in this paper are consistent with the results from other studies,indicating that the threshold of the ground motion parameters for strong earthquakes is of the same order of magnitude as that of moderate earthquakes.Landslide density of local sites fluctuated with the increase of ground motion intensity if the thresholds were reached.When the upper limits are exceeded,the landslide density remains at a certain level with relatively little variation.展开更多
Dynamic centrifuge model test was conducted to study the earthquake-induced differential settlement of foundation on cohesive ground, and the influence of asymmetry of building was investigated. During the experiment,...Dynamic centrifuge model test was conducted to study the earthquake-induced differential settlement of foundation on cohesive ground, and the influence of asymmetry of building was investigated. During the experiment, the overconsolidated kaolin clay ground with a three-dimensional asymmetrical structure model was shaken by a basically balanced input motion, and bender elements were used to measure shear wave velocities of model ground to reveal the soil fabric evolution during and after shaking. The test results show that, the total seismic settlement of foundation is composed of instantaneous and long-term post-earthquake settlements, and most of the differential settlement occurs immediately after the earthquake while the post-earthquake settlement is relatively uniform despite its large amplitude. The asymmetry of building affects the settlement behavior considerably. Compared with 1-or 2-dimensional structures, more evident differential settlement occurs under threedimensional asymmetrical building during shaking, which accounts for one-half of the total seismic settlements and results in complex spatial tilting effects of foundation.展开更多
This study tried to explore the ground movement induced by triple stacked tunneling(TST) with different construction sequences. A case study in Tianjin, China was used to investigate the ground movement during the TST...This study tried to explore the ground movement induced by triple stacked tunneling(TST) with different construction sequences. A case study in Tianjin, China was used to investigate the ground movement during the TST(upper tunneling(UT)). For this, a modified Peck formula was proposed to predict the surface settlement induced by TST. Next, three sets of finite element analyses(FEA) were used to compare the effects of construction sequences(i.e. UT, middle tunneling(MT), and lower tunneling(LT)) on vertical and lateral ground displacements. The results of Tianjin case and UT reveal that compared to a Gaussian distribution for a single tunnel, the surface settlement curve of triple stacked tunnels is a bimodal distribution. It seems that the proposed modified Peck formula can effectively predict the surface settlement induced by TST. The results of the three sets of FEA demonstrate that the construction sequence has a significant influence on the ground movement. Among the three construction sequences, the largest lateral displacement is observed in the MT and the smallest one in UT.The existing tunnel has an inhibitory effect on the vertical displacement. The maximum value of the lateral displacement occurs at the depth of the new tunnel in each construction sequence.展开更多
Through the systematic analysis of the ground settlement generated by the process of shield tunneling,the relationships between ground deformation and construction parameters are studied in this paper.Based on the ass...Through the systematic analysis of the ground settlement generated by the process of shield tunneling,the relationships between ground deformation and construction parameters are studied in this paper.Based on the assumption of linear small deformation,a mathematical model of the relationship between ground deformation and construction parameters is set up.The principle and method of optimization for estimating ground deformation is studied.The actual measured data are compared with the results of theoretical analysis in a case.Considering different ground formations in different construction sites with different adverse effects on surface and underground structures,the ground surface deformations caused by shield tunneling is an aimed topic in this paper.The contributions and research implications are the revealed relationships between the ground deformation and the shield tunneling parameters during construction.展开更多
基金the financial support from the Guangdong Provincial Department of Science and Technology(Grant No.2022A0505030019)the Science and Technology Development Fund,Macao SAR,China(File Nos.0056/2023/RIB2 and SKL-IOTSC-2021-2023).
文摘Recently,the application of Bayesian updating to predict excavation-induced deformation has proven successful and improved prediction accuracy significantly.However,updating the ground settlement profile,which is crucial for determining potential damage to nearby infrastructures,has received limited attention.To address this,this paper proposes a physics-guided simplified model combined with a Bayesian updating framework to accurately predict the ground settlement profile.The advantage of this model is that it eliminates the need for complex finite element modeling and makes the updating framework user-friendly.Furthermore,the model is physically interpretable,which can provide valuable references for construction adjustments.The effectiveness of the proposed method is demonstrated through two field case studies,showing that it can yield satisfactory predictions for the settlement profile.
基金financially supported by the National Natural Science Foundation of China(Grant No.42307260)the Sichuan Natural Science Foundation(Grant No.2023NSFSC0882)the Open Project of the Research Center of Tunnelling and Underground Engineering of Ministry of Education(Grant No.TUC2022-03).
文摘Twin curved tunnels are often encountered in shield tunnelling,where significant complexities in densely exploited underground space are observed.In this study,the ground settlement and tunnel deformation due to twin-curved shield tunnelling in soft ground were investigated using numerical simulation and field monitoring.Different curvature radii of twin curved tunnels and subsequent effects of tunnel construction were considered to reveal the tunnelling effect on ground surface settlement and tunnel deformation.The results show that the settlement trough yields one offset towards inside of curved shield tunnelling.The location of settlement trough and maximum settlement were affected by curvature radius but except for the shape and width of settlement trough.Adjacent parallel twin-curved shield tunnelling could increase the offset of existing settlement trough and maximum settlement.Then,an empirical prediction of surface settlement trough due to twin-curved shield tunnelling with same tunnel diameters in soft clay was proposed,which was applicable to curvature radius less than 800 m.Finally,a minimum radius of 600 m of curvature tunnel was proposed in terms of allowable convergence deformation of tunnel.The result could provide guidance on safety evaluation for twin curved shield tunnelling construction.
基金funded by the University Transportation Center for Underground Transportation Infrastructure(UTC-UTI)at the Colorado School of Mines under Grant No.69A3551747118 from the US Department of Transportation(DOT).
文摘Prediction of tunneling-induced ground settlements is an essential task,particularly for tunneling in urban settings.Ground settlements should be limited within a tolerable threshold to avoid damages to aboveground structures.Machine learning(ML)methods are becoming popular in many fields,including tunneling and underground excavations,as a powerful learning and predicting technique.However,the available datasets collected from a tunneling project are usually small from the perspective of applying ML methods.Can ML algorithms effectively predict tunneling-induced ground settlements when the available datasets are small?In this study,seven ML methods are utilized to predict tunneling-induced ground settlement using 14 contributing factors measured before or during tunnel excavation.These methods include multiple linear regression(MLR),decision tree(DT),random forest(RF),gradient boosting(GB),support vector regression(SVR),back-propagation neural network(BPNN),and permutation importancebased BPNN(PI-BPNN)models.All methods except BPNN and PI-BPNN are shallow-structure ML methods.The effectiveness of these seven ML approaches on small datasets is evaluated using model accuracy and stability.The model accuracy is measured by the coefficient of determination(R2)of training and testing datasets,and the stability of a learning algorithm indicates robust predictive performance.Also,the quantile error(QE)criterion is introduced to assess model predictive performance considering underpredictions and overpredictions.Our study reveals that the RF algorithm outperforms all the other models with the highest model prediction accuracy(0.9)and stability(3.0210^(-27)).Deep-structure ML models do not perform well for small datasets with relatively low model accuracy(0.59)and stability(5.76).The PI-BPNN architecture is proposed and designed for small datasets,showing better performance than typical BPNN.Six important contributing factors of ground settlements are identified,including tunnel depth,the distance between tunnel face and surface monitoring points(DTM),weighted average soil compressibility modulus(ACM),grouting pressure,penetrating rate and thrust force.
基金Project(41202220) supported by the National Natural Science Foundation of ChinaProject(2011YYL034) supported by the Fundamental Research Funds for the Central Universities,China
文摘A new technique for the analysis of the three-dimensional collapse failure mechanism and the ground surface settlements for the large-diameter shield tunnels were presented.The technique is based on a velocity field model using more different truncated solid conical blocks to clarify the multiblock failure mechanism.Furthermore,the shape of blocks between the failure surface and the tunnel face was considered as an entire circle,and the supporting pressure was assumed as non-uniform distribution on the tunnel face and increased with the tunnel embedded depth.The ground surface settlements and failure mechanism above large-diameter shield tunnels were also investigated under different supporting pressures by the finite difference method.
基金supported by the National Natural Science Foundation of China(Grant Nos.52078086 and 51778092)Program of Distinguished Young Scholars,Natural Science Foundation of Chongqing,China(Grant No.cstc2020jcyj-jq0087)。
文摘Excessive ground surface settlement induced by pit excavation(i.e.braced excavation) can potentially result in damage to the nearby buildings and facilities.In this paper,extensive finite element analyses have been carried out to evaluate the effects of various structural,soil and geometric properties on the maximum ground surface settlement induced by braced excavation in anisotropic clays.The anisotropic soil properties considered include the plane strain shear strength ratio(i.e.the ratio of the passive undrained shear strength to the active one) and the unloading shear modulus ratio.Other parameters considered include the support system stiffness,the excavation width to excavation depth ratio,and the wall penetration depth to excavation depth ratio.Subsequently,the maximum ground surface settlement of a total of 1479 hypothetical cases were analyzed by various machine learning algorithms including the ensemble learning methods(extreme gradient boosting(XGBoost) and random forest regression(RFR)algorithms).The prediction models developed by the XGBoost and RFR are compared with that of two conventional regression methods,and the predictive accuracy of these models are assessed.This study aims to highlight the technical feasibility and applicability of advanced ensemble learning methods in geotechnical engineering practice.
基金the National Key Research and Development Program of China(Grant No.2017YFC0805402)the Tianjin Construction Commission Science and Technology Project(financial support No.2017E6-0015)the China Scholarship Council(CSC)(Grant No.201906250153)for their Grant of the study in this paper。
文摘Vacuum preloading has been widely used to improve soft soils in coastal areas of China.An increasing amount of evidence from field operations has shown that conventional vacuum preloading is prone to clogging in prefabricated vertical drains(PVDs)and demands a large volume of sand fills.In recent years,air-boosted vacuum preloading has been developed to overcome these limitations;however,this method still requires more data to verify its performance.In this study,a field test for air-boosted vacuum preloading was conducted,and a large-strain two-dimensional(2D)finite element(FE)model was developed and validated against the field test data.Then,a series of FE parametric analyses was performed to assess key factors,i.e.the air injection pressure,the injection spacing,and the characteristics of cyclic injection,which affect the performance of the air-boosted vacuum preloading.The results showed that the ground settlement and lateral displacement of the soils increased due to an increase in the injection pressure,a decrease in the injection spacing,or increases in the number and duration of the injection cycles.Based on the parametric analyses,an empirical formula for ground settlement prediction was proposed and compared with a case history reported in the literature,showing good agreement.
文摘At present the bored construction method is one of the main construction methods of metro and tunnel construction in China. The empirical estimated formulas of tunnel ground surface settlement using the bored construction method were obtained, combining the mechanical stimulant calculated result of tunnel model of different embedded depth, different cross section and different construction method and the actual measurement data of Beijing metro construction. According to the regressed analysis of calculated data, the calculated equations of ground surface settlement value and settlement range of tunnel section under the condition of different embedded depth, different cross section and different construction method were gained. Among them there are some empirical formulas can apply to the construction design of metro tunnel directly.
基金This research was supported by the Basic Science Research Program through the National Research Foundation of Korea(NRF)funded by the Ministry of Education(No.2020R1I1A3067248).
文摘Prefabricated vertical drains(PVDs)are commonly used to shorten the drainage path for consolidation as part of the improvement of marine soft ground.Many studies that focus on the primary consolidation settlement of PVD-improved soft ground have been conducted;however,residual settlement has been scarcely investigated.Residual settlement is the net effect of secondary compression and the remaining primary consolidation and generally occurs while the facilities are operating.In this study,residual settlement was investigated using the measured field settlement data obtained from the surface settlement plate and multilayer settlement gauges.This study determined that PVD still has some effect on residual settlement and can reduce the settlement times.Residual settlement is only related to the PVD-improved soil layer and only occurs significantly in the middle zone of that layer over a few months.The middle zone may be related to the time delay of excess pore water pressure dissipation.This study concluded that the remaining primary consolidation in the PVD-improved soil layer is the primary cause of residual settlement,whereas secondary compression in the PVD-improved soil layer is only a minor cause.
文摘Since different underground engineering contains different geological conditions,structure and excavation methods,their disturbing degree on the ground also differs,but ground surface settlement caused by excavation has one common point that they will form a ground surface settlement curve.Based on data statistical analysis,the article puts forward the relationship between point of inflection in digging tunnels with shallowburied method and the span of tunnel excavation against typical geological conditions in Changchun so as to predict the impact of tunnel excavation and improve reasonable ground surface settlement control standard.Research result will be useful for study on ground surface control standard in digging tunnels with shallow-buried method and setting settlement standard.
文摘In order to ensure that the tunnel deformation and surface settlement are controlled within the allowable range during the construction process,the design unit has compiled technical measures and monitoring schemes for ground settlement control of this project.Based on the example of a shallow tunneling project on Subway line 8,this paper analyzes and discusses the shallow tunneling method in detail and puts forward corresponding technical measures for ground settlement control.
基金Project(09JJ1008) supported by Hunan Provincial Science Foundation of China
文摘Based on the image theory,the analytical solutions of tunneling-induced ground displacement were derived in conjunction with the nonuniform convergence model.The reasonable value of Poisson ratio in the analytical solution was discussed.The ground settlement width parameter which could reflect the ground condition was introduced to modify the analytical solutions proposed above,and new analytical solutions were presented.To evaluate the validity of the present solutions using the nonuniform convergence model,the results were compared with the observed values for four engineering projects,including 38 measured data of ground settlement.The agreement shows that the present solutions using the nonuniform convergence model are effective for evaluating the tunneling-induced ground displacements.
基金supported by the National Natural Science Foundation of China under the grant No. 40872209
文摘The MS8.0 Wenchuan earthquake induced severe landslide hazards.For the first time in China,large numbers of strong motion records were obtained during the Wenchuan earthquake,providing the opportunity to study the relationships between ground-motion parameters and the earthquake-induced landslides.Nearly 40 groups of records from the main shock distributed along the Longmenshan fault lines were used to carry out this study.The results appropriate to the Longmenshan area are as follows:1 The threshold of the peak ground acceleration(PGA) is about 0.7 m/s2.When the PGA reaches 2 m/s2,the landslide hazards are very serious; 2 The threshold of the peak ground velocity(PGV) is about 0.5 m/s.When the PGV reaches 1.5 m/s,severe landslide hazards will be induced; 3 The threshold for the Arias intensity(Ia) is about 0.2 m/s.When the Ia in one horizontal direction reaches 2 m/s,landslide hazards will be very serious; 4 As for the relevance order of the parameters to earthquake-induced landslides,Ia is the leading parameter,followed by PGV,and finally PGA.The results presented in this paper are consistent with the results from other studies,indicating that the threshold of the ground motion parameters for strong earthquakes is of the same order of magnitude as that of moderate earthquakes.Landslide density of local sites fluctuated with the increase of ground motion intensity if the thresholds were reached.When the upper limits are exceeded,the landslide density remains at a certain level with relatively little variation.
基金Supported by the National Basic Research Program of China("973"Project)(Grant No.2007CB714203)the China Postdoctoral Science Foundation(Grant Nos.20080430219,20081476)the Foundation for Seismological Researches,China Earthquake Administration(Grant No.200808022)
文摘Dynamic centrifuge model test was conducted to study the earthquake-induced differential settlement of foundation on cohesive ground, and the influence of asymmetry of building was investigated. During the experiment, the overconsolidated kaolin clay ground with a three-dimensional asymmetrical structure model was shaken by a basically balanced input motion, and bender elements were used to measure shear wave velocities of model ground to reveal the soil fabric evolution during and after shaking. The test results show that, the total seismic settlement of foundation is composed of instantaneous and long-term post-earthquake settlements, and most of the differential settlement occurs immediately after the earthquake while the post-earthquake settlement is relatively uniform despite its large amplitude. The asymmetry of building affects the settlement behavior considerably. Compared with 1-or 2-dimensional structures, more evident differential settlement occurs under threedimensional asymmetrical building during shaking, which accounts for one-half of the total seismic settlements and results in complex spatial tilting effects of foundation.
基金financially supported by the Open Project of the State Key Laboratory of Disaster Reduction in Civil Engineering (Grant No. SLDRCE17-01)the National Key Research and Development Program of China (Grant No.2017YFC0805402)the National Natural Science Foundation of China (Grant No. 51808387)。
文摘This study tried to explore the ground movement induced by triple stacked tunneling(TST) with different construction sequences. A case study in Tianjin, China was used to investigate the ground movement during the TST(upper tunneling(UT)). For this, a modified Peck formula was proposed to predict the surface settlement induced by TST. Next, three sets of finite element analyses(FEA) were used to compare the effects of construction sequences(i.e. UT, middle tunneling(MT), and lower tunneling(LT)) on vertical and lateral ground displacements. The results of Tianjin case and UT reveal that compared to a Gaussian distribution for a single tunnel, the surface settlement curve of triple stacked tunnels is a bimodal distribution. It seems that the proposed modified Peck formula can effectively predict the surface settlement induced by TST. The results of the three sets of FEA demonstrate that the construction sequence has a significant influence on the ground movement. Among the three construction sequences, the largest lateral displacement is observed in the MT and the smallest one in UT.The existing tunnel has an inhibitory effect on the vertical displacement. The maximum value of the lateral displacement occurs at the depth of the new tunnel in each construction sequence.
文摘Through the systematic analysis of the ground settlement generated by the process of shield tunneling,the relationships between ground deformation and construction parameters are studied in this paper.Based on the assumption of linear small deformation,a mathematical model of the relationship between ground deformation and construction parameters is set up.The principle and method of optimization for estimating ground deformation is studied.The actual measured data are compared with the results of theoretical analysis in a case.Considering different ground formations in different construction sites with different adverse effects on surface and underground structures,the ground surface deformations caused by shield tunneling is an aimed topic in this paper.The contributions and research implications are the revealed relationships between the ground deformation and the shield tunneling parameters during construction.