The main purpose of this paper is to investigate the effect of core eccentricity on the structural behavior of concrete tall buildings.Concrete buildings of 55 floors with plan dimensions 48.0×48.0 m2 were invest...The main purpose of this paper is to investigate the effect of core eccentricity on the structural behavior of concrete tall buildings.Concrete buildings of 55 floors with plan dimensions 48.0×48.0 m2 were investigated.Three cases of main core locations are studied:centric(A),eccentric by one sixth(B)and one third(C)of building width.The three-dimensional finite element method has been used in conducting structural analysis through ETABS software.Gravity and lateral(wind and seismic)loadings are applied to all building cases.It has been concluded that the core location is the prime parameter governing the structural behavior of tall buildings.Although the first two cases(A,B)have acceptable and similar structural behaviors conforming to code limits,in the third case(C),the building behavior came beyond code limits.The author introduced remedial action by adding two secondary cores in the opposite direction of the main core(C-R)to restore the building behavior to the code limits.The results of this action were satisfactory.展开更多
文摘The main purpose of this paper is to investigate the effect of core eccentricity on the structural behavior of concrete tall buildings.Concrete buildings of 55 floors with plan dimensions 48.0×48.0 m2 were investigated.Three cases of main core locations are studied:centric(A),eccentric by one sixth(B)and one third(C)of building width.The three-dimensional finite element method has been used in conducting structural analysis through ETABS software.Gravity and lateral(wind and seismic)loadings are applied to all building cases.It has been concluded that the core location is the prime parameter governing the structural behavior of tall buildings.Although the first two cases(A,B)have acceptable and similar structural behaviors conforming to code limits,in the third case(C),the building behavior came beyond code limits.The author introduced remedial action by adding two secondary cores in the opposite direction of the main core(C-R)to restore the building behavior to the code limits.The results of this action were satisfactory.