[Objective] The aim was to study the coupling effect of water and phosphate on economic traits of sugarcane. [Method] Taking sugarcane variety ROC22 as tested material,coupling effects of different levels of water sup...[Objective] The aim was to study the coupling effect of water and phosphate on economic traits of sugarcane. [Method] Taking sugarcane variety ROC22 as tested material,coupling effects of different levels of water supply quantity and different levels of phosphorus fertilizer on the yield and quality of sugarcane were studied. Among them,water supply quantity had 3 levels,that was,the water supply quantity per 10 days from the early tillering stage of sugarcane to the end of elongation was 199.5 m3/hm2 (A1),400.5 m3/hm2 (A2) and 600.0 m3/hm2 (A3),respectively; Phosphorus fertilizer as basic fertilizer had 4 levels:P2O5 0 kg/hm2 (B1),120 kg/hm2 (B2),240 kg/hm2 (B3) and 360 kg/hm2 (B4). [Result] Treatment A3B2 in water-fertilizer coupling was more suitable to improve economic traits of sugarcane. [Conclusion] The research results provide theoretical basis for the efficient utilization of water and phosphorus fertilizer in production of Guangxi sugarcane and the cultivation of high-yield and high-glucose sugarcane.展开更多
Based on oil development costs, the application research in the technical and economic limits calculation of oil development and the production optimal allocation to all the oilfields, was finished. At the same time, ...Based on oil development costs, the application research in the technical and economic limits calculation of oil development and the production optimal allocation to all the oilfields, was finished. At the same time, according to the regression of real development costs, a new method for oil well economic water cut and oil well economic rate are set up, the production optimal allocation is developed with satisfactory results.展开更多
This paper describes a new method which is different with the shadow price method to evaluate the economic benefits of the water source project. The approach is to take the water source as a constraint on the regiona...This paper describes a new method which is different with the shadow price method to evaluate the economic benefits of the water source project. The approach is to take the water source as a constraint on the regional economic development, calculate the difference between the generaded when the water source project is in operation and the gross product generated when the project is nonexistent, and then review the economic benefits on the project. For this purpose, we have constructed an input-output linear programming model and compiled a compatible using the routines for solving the input-output linear programming model. The above models and the routines have been used in paractical calculation of economic benefits of a water source project for a region. The computation result are satisfactory.展开更多
基金Supported by National Science and Technology Project of China(2007BAD30B04)~~
文摘[Objective] The aim was to study the coupling effect of water and phosphate on economic traits of sugarcane. [Method] Taking sugarcane variety ROC22 as tested material,coupling effects of different levels of water supply quantity and different levels of phosphorus fertilizer on the yield and quality of sugarcane were studied. Among them,water supply quantity had 3 levels,that was,the water supply quantity per 10 days from the early tillering stage of sugarcane to the end of elongation was 199.5 m3/hm2 (A1),400.5 m3/hm2 (A2) and 600.0 m3/hm2 (A3),respectively; Phosphorus fertilizer as basic fertilizer had 4 levels:P2O5 0 kg/hm2 (B1),120 kg/hm2 (B2),240 kg/hm2 (B3) and 360 kg/hm2 (B4). [Result] Treatment A3B2 in water-fertilizer coupling was more suitable to improve economic traits of sugarcane. [Conclusion] The research results provide theoretical basis for the efficient utilization of water and phosphorus fertilizer in production of Guangxi sugarcane and the cultivation of high-yield and high-glucose sugarcane.
文摘Based on oil development costs, the application research in the technical and economic limits calculation of oil development and the production optimal allocation to all the oilfields, was finished. At the same time, according to the regression of real development costs, a new method for oil well economic water cut and oil well economic rate are set up, the production optimal allocation is developed with satisfactory results.
文摘This paper describes a new method which is different with the shadow price method to evaluate the economic benefits of the water source project. The approach is to take the water source as a constraint on the regional economic development, calculate the difference between the generaded when the water source project is in operation and the gross product generated when the project is nonexistent, and then review the economic benefits on the project. For this purpose, we have constructed an input-output linear programming model and compiled a compatible using the routines for solving the input-output linear programming model. The above models and the routines have been used in paractical calculation of economic benefits of a water source project for a region. The computation result are satisfactory.