期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
China---Global Manufacture Center for Household Electrical Appliances
1
《China's Foreign Trade》 2002年第2期53-53,共1页
关键词 China Global Manufacture center for Household electrical Appliances
下载PDF
NINGBO TENDERING CENTER OF MACHINERY AND ELECTRIC EQUIPMENT
2
《中国招标》 1995年第4期24-24,共1页
Ningbo TenderingCenter of Machinery andElectric Equipment wasestablished with the ap-proval by the CompetantState Department andNingbo Municipal Gov-ernment.It is a legal en-tity subordinated to Ning-bo Municipal Econ... Ningbo TenderingCenter of Machinery andElectric Equipment wasestablished with the ap-proval by the CompetantState Department andNingbo Municipal Gov-ernment.It is a legal en-tity subordinated to Ning-bo Municipal EconomicCommittee,specializingin tendering service un-der the supervision,in-spection and guidance ofthe China National Ten-dering Center of Machin-ery and Electric Equip-ment. 展开更多
关键词 der PRO NINGBO TENDERING center OF MACHINERY AND electric EQUIPMENT
下载PDF
Out-of-step oscillation splitting criterion based on bus voltage frequency 被引量:5
3
作者 Fei TANG Jian YANG +2 位作者 Qingfen LIAO Yifei WANG Jun JIA 《Journal of Modern Power Systems and Clean Energy》 SCIE EI 2015年第3期341-352,共12页
Under the background of complicated interconnected network,the splitting criterion for accurately capturing the electrical center in real time is the prerequisite of power grid splitting.This paper studies the feature... Under the background of complicated interconnected network,the splitting criterion for accurately capturing the electrical center in real time is the prerequisite of power grid splitting.This paper studies the features of electric quantity in the electrical center in aspect of the instantaneous frequency,and proposes the out-of-step splitting criterion for power systems based on bus voltage frequency.Firstly,through the establishment and solution to the out-of-step model of the power grid,the analytical expression of the voltage frequency at any position is obtained in the out-of-step oscillation,and the voltage frequency features of electrical center and non-electrical center are analyzed in details.Then,this paper constructs the typical scene of migration of electrical center to study the change rules of voltage frequency.Finally,the splitting criterion based on bus voltage frequency is proposed as well as the instruction for use.This criterion is easy to be realized and can adapt to the migration of electrical center.Also it is free from the limits of power network structure and operational mode.Simulation results of CEPRI-36 system and interconnected network example of one actual region verify the accuracy and the effectiveness of the proposed criterion. 展开更多
关键词 Out-of-step splitting Voltage frequency electrical center Splitting criterion
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部