Various regulations, aimed at the protection of human beings and electrical equipment against possible adverse effects resulting from exposure to electromagnetic fields, have been issued in many countries. Most of the...Various regulations, aimed at the protection of human beings and electrical equipment against possible adverse effects resulting from exposure to electromagnetic fields, have been issued in many countries. Most of them are based on safety guidelines published by international expert groups. In this paper, electric and magnetic fields are calculated in the vicinity of 25 kV traction line supplying railway traction systems. Calculation results are compared to exposure limits specified by safety guidelines and regulations. Possible countermeasures for reduction of electromagnetic fields are proposed. Also, this paper presents a method for calculation of the induced voltages to an underground gas pipeline from a neighbouring 25 kV electric traction overhead line in case of short circuit. Calculations are performed with EMTP-ATP software. Possible countermeasures for reduction of induced voltages are proposed.展开更多
The high dynamic power requirements present in modern railway transportation systems raise research challenges for an optimal operation of railway electrification. This paper presents a Monte Carlo analysis on the app...The high dynamic power requirements present in modern railway transportation systems raise research challenges for an optimal operation of railway electrification. This paper presents a Monte Carlo analysis on the application of a power transfer device installed in the neutral zone and exchanging active power between two sections. The main analyzed parameters are the active power balance in the two neighbor traction power substations and the system power losses. A simulation framework is presented to comprise the desired analysis and a universe of randomly distributed scenarios are tested to evaluate the effectiveness of the power transfer device system. The results show that the density of trains and the relative branch length of a traction power substation should be considered in the evaluation phase of the best place to install a power transfer device, towards the reduction of the operational power losses, while maintaining the two substations balanced in terms of active power.展开更多
In the case of electric or tram traction vehicles, the energy for propulsion purposes, as well as all other purposes, is processed and delivered via traction substations. Knowledge of the course of traction substation...In the case of electric or tram traction vehicles, the energy for propulsion purposes, as well as all other purposes, is processed and delivered via traction substations. Knowledge of the course of traction substation loading, especially at the stage of its design, is an extremely important issue because of the choice of the processing equipment of the main circuit or protection devices. In the range of investigations of railway traction substation B in vicinity of Cracow (Poland), the measurements of current load in hours 4:00 a.m.-8:00 p.m. were realized. The measurements for the analysis were chosen from those realized between 6:00 a.m.-8:00 a.m. (the morning rush time). Due to the sampling of 2 h summit with a frequency of 2 kHz, the recorded data set contains 1.44 ~ 107 elements. Therefore, the necessary transformation of data was to lower frequency 1 Hz, 10 Hz and 50 Hz. The results of the analysis presented below indicate the effect of such conduct on the obtained results for the parameters of time series models. In view of the unsatisfactory effects of the polynomial approximation, there is a need to seek a more efficient approximation method for achieving the optimum compatibility with the measured process. Continued research should lead to the formulation of procedures, which will determine an acceptable accuracy of the expected variability of traction substation loads.展开更多
By system analysis and imitating modeling authors show the most effective modern techniques for railway electric systems control. Modem measure technologies PMU-WAMS and smart grid allow to solve real time tasks of ce...By system analysis and imitating modeling authors show the most effective modern techniques for railway electric systems control. Modem measure technologies PMU-WAMS and smart grid allow to solve real time tasks of centralizing control of railway electric systems. Quantity characteristics of control effectiveness are determined. According to computer modeling the situation approach is available for practical tasks of railway electric system control.展开更多
文摘Various regulations, aimed at the protection of human beings and electrical equipment against possible adverse effects resulting from exposure to electromagnetic fields, have been issued in many countries. Most of them are based on safety guidelines published by international expert groups. In this paper, electric and magnetic fields are calculated in the vicinity of 25 kV traction line supplying railway traction systems. Calculation results are compared to exposure limits specified by safety guidelines and regulations. Possible countermeasures for reduction of electromagnetic fields are proposed. Also, this paper presents a method for calculation of the induced voltages to an underground gas pipeline from a neighbouring 25 kV electric traction overhead line in case of short circuit. Calculations are performed with EMTP-ATP software. Possible countermeasures for reduction of induced voltages are proposed.
基金funded by FCT (Fun- dacāo Ciência e Tecnologia) under grant PD/BD/128051/2016the Shift2Rail In2Stempo project (grant 777515)+3 种基金partially supported by FCT R&D Unit SYSTEC—POCI-01-0145-FEDER-006933SYSTEC funded by FEDER funds through COMPETE2020by national funds through the FCT/MECco-funded by FEDER, in the scope of the PT2020 Partnership Agreement。
文摘The high dynamic power requirements present in modern railway transportation systems raise research challenges for an optimal operation of railway electrification. This paper presents a Monte Carlo analysis on the application of a power transfer device installed in the neutral zone and exchanging active power between two sections. The main analyzed parameters are the active power balance in the two neighbor traction power substations and the system power losses. A simulation framework is presented to comprise the desired analysis and a universe of randomly distributed scenarios are tested to evaluate the effectiveness of the power transfer device system. The results show that the density of trains and the relative branch length of a traction power substation should be considered in the evaluation phase of the best place to install a power transfer device, towards the reduction of the operational power losses, while maintaining the two substations balanced in terms of active power.
文摘In the case of electric or tram traction vehicles, the energy for propulsion purposes, as well as all other purposes, is processed and delivered via traction substations. Knowledge of the course of traction substation loading, especially at the stage of its design, is an extremely important issue because of the choice of the processing equipment of the main circuit or protection devices. In the range of investigations of railway traction substation B in vicinity of Cracow (Poland), the measurements of current load in hours 4:00 a.m.-8:00 p.m. were realized. The measurements for the analysis were chosen from those realized between 6:00 a.m.-8:00 a.m. (the morning rush time). Due to the sampling of 2 h summit with a frequency of 2 kHz, the recorded data set contains 1.44 ~ 107 elements. Therefore, the necessary transformation of data was to lower frequency 1 Hz, 10 Hz and 50 Hz. The results of the analysis presented below indicate the effect of such conduct on the obtained results for the parameters of time series models. In view of the unsatisfactory effects of the polynomial approximation, there is a need to seek a more efficient approximation method for achieving the optimum compatibility with the measured process. Continued research should lead to the formulation of procedures, which will determine an acceptable accuracy of the expected variability of traction substation loads.
文摘By system analysis and imitating modeling authors show the most effective modern techniques for railway electric systems control. Modem measure technologies PMU-WAMS and smart grid allow to solve real time tasks of centralizing control of railway electric systems. Quantity characteristics of control effectiveness are determined. According to computer modeling the situation approach is available for practical tasks of railway electric system control.