To verify a vacuum breaker's feasibility,when a transformer substation chooses a vacuum circuit breaker,it takes two different actual operational ways to cut off a transformer.This paper,using the power system com...To verify a vacuum breaker's feasibility,when a transformer substation chooses a vacuum circuit breaker,it takes two different actual operational ways to cut off a transformer.This paper,using the power system computer aided design/electro magnetic transient in DC system(PSCAD/EMTDC)software,simulates the substation system and studies transient recovery voltage(TRV)caused by the two different ways which can cut off a with load transformer or a no-load transformer.Simulation and calculation results show that TRV indexes of the first way are much higher than that of the second one,and their TRV indexes are both in a permissible range.The breaker is proved to be available.Besides,this paper proves that paralleling resistance has a good effect when the indexes exceed the standard.The resistance value depends on specific circumstances.展开更多
基金Graduate Scientific and Innovation Foundation of Shandong University of Science and Technology(No.YCA120108)
文摘To verify a vacuum breaker's feasibility,when a transformer substation chooses a vacuum circuit breaker,it takes two different actual operational ways to cut off a transformer.This paper,using the power system computer aided design/electro magnetic transient in DC system(PSCAD/EMTDC)software,simulates the substation system and studies transient recovery voltage(TRV)caused by the two different ways which can cut off a with load transformer or a no-load transformer.Simulation and calculation results show that TRV indexes of the first way are much higher than that of the second one,and their TRV indexes are both in a permissible range.The breaker is proved to be available.Besides,this paper proves that paralleling resistance has a good effect when the indexes exceed the standard.The resistance value depends on specific circumstances.