Expediting is becoming more essential with the increase of engineering construction projects by Chinese companies abroad.According to Xinhua News Agency,from 2013 to 2018,Chinese enterprises’direct investment in coun...Expediting is becoming more essential with the increase of engineering construction projects by Chinese companies abroad.According to Xinhua News Agency,from 2013 to 2018,Chinese enterprises’direct investment in countries along the Belt and Road(B&R)exceeded USD 90 billion,with an average annual growth rate of 5.2%.For countries along B&R,the value of Engineering Procurement Construction(EPC)projects signed with Chinese companies exceeded USD 600 billion,which is an average annual increase of 11.9%.展开更多
In recent years, in Vietnam, economy has been developing rapidly. To ensure rapid and sustainable economic growth, strong support from the energy sector is required. Governments in Vietnam have invested in numerous hy...In recent years, in Vietnam, economy has been developing rapidly. To ensure rapid and sustainable economic growth, strong support from the energy sector is required. Governments in Vietnam have invested in numerous hydropower projects, many of which employ the EPC (Engineering, Procurement and Construction) contract. However, the EPC general contractors are facing many difficulties, resulting in schedule delays and considerable losses. This research is conducted to highlight the main risk factors in the delays of hydropower construction projects in Vietnam. The research employs the method of statistical calculations and risk analysis to obtain feedback from experts participating in similar projects. The research outcomes are as follows: identifying the risks that can cause delays in EPC hydroelectric construction projects in Vietnam;calculating and classifying the degree of impact of each risk to the progress of the construction. The practical significance of this study is to ensure the timely completion of projects, benefits for the investors, and the EPC general contractors.展开更多
文摘Expediting is becoming more essential with the increase of engineering construction projects by Chinese companies abroad.According to Xinhua News Agency,from 2013 to 2018,Chinese enterprises’direct investment in countries along the Belt and Road(B&R)exceeded USD 90 billion,with an average annual growth rate of 5.2%.For countries along B&R,the value of Engineering Procurement Construction(EPC)projects signed with Chinese companies exceeded USD 600 billion,which is an average annual increase of 11.9%.
文摘In recent years, in Vietnam, economy has been developing rapidly. To ensure rapid and sustainable economic growth, strong support from the energy sector is required. Governments in Vietnam have invested in numerous hydropower projects, many of which employ the EPC (Engineering, Procurement and Construction) contract. However, the EPC general contractors are facing many difficulties, resulting in schedule delays and considerable losses. This research is conducted to highlight the main risk factors in the delays of hydropower construction projects in Vietnam. The research employs the method of statistical calculations and risk analysis to obtain feedback from experts participating in similar projects. The research outcomes are as follows: identifying the risks that can cause delays in EPC hydroelectric construction projects in Vietnam;calculating and classifying the degree of impact of each risk to the progress of the construction. The practical significance of this study is to ensure the timely completion of projects, benefits for the investors, and the EPC general contractors.