The predictions by drilling-related mechanical and geological models are in some degree inaccurate due to non-unique solution of seismic velocity model.To address this problem,a new drilling technology guided by well-...The predictions by drilling-related mechanical and geological models are in some degree inaccurate due to non-unique solution of seismic velocity model.To address this problem,a new drilling technology guided by well-seismic information integration is proposed which consists of seismic velocity update of drilled formations,seismic velocity prediction of the formation ahead of drilling bit,and the prediction of geological feature and drilling geological environmental factors ahead of bit.In this technology,real information(velocity,formation and depth)behind the drilling bit and local pre-stack seismic data around the wellbore being drilled are used to correct the primitive seismic velocity field for a re-migration of seismic data and to update geological features and drilling geological environmental factors ahead of the drilling bit.Field application shows that this technology can describe and predict the geological features,drilling geological environmental factors and complex drilling problems ahead of the bit timely and improve the prediction efficiency and accuracy greatly.These new updated results are able to provide scientific basis for optimizing drilling decisions.展开更多
In high sour gas reservoir drilling process, it happens occasionally that high-strength drill pipe suffers brittle fracture failure due to stress corrosion cracking, and poses serious hazard to drilling safety. To sol...In high sour gas reservoir drilling process, it happens occasionally that high-strength drill pipe suffers brittle fracture failure due to stress corrosion cracking, and poses serious hazard to drilling safety. To solve this problem, this paper studied the stress corrosion cracking mechanism and infl uencing factors of highstrength drill pipe in sour environment with hydrogen permeation experiments and tensile tests. We simulated practical conditions in laboratory and evaluated the stress corrosion cracking performance of the high-strength drill pipe under conditions of high stress level. For the problems occurring in use of high-strength drill pipe on site, the paper proposed a technical measure for slower stress corrosion cracking.展开更多
基金Supported by the Sinopec Scientific Research Project(P17030-4)
文摘The predictions by drilling-related mechanical and geological models are in some degree inaccurate due to non-unique solution of seismic velocity model.To address this problem,a new drilling technology guided by well-seismic information integration is proposed which consists of seismic velocity update of drilled formations,seismic velocity prediction of the formation ahead of drilling bit,and the prediction of geological feature and drilling geological environmental factors ahead of bit.In this technology,real information(velocity,formation and depth)behind the drilling bit and local pre-stack seismic data around the wellbore being drilled are used to correct the primitive seismic velocity field for a re-migration of seismic data and to update geological features and drilling geological environmental factors ahead of the drilling bit.Field application shows that this technology can describe and predict the geological features,drilling geological environmental factors and complex drilling problems ahead of the bit timely and improve the prediction efficiency and accuracy greatly.These new updated results are able to provide scientific basis for optimizing drilling decisions.
基金Funded by the Program for National Science Fund for Distinguished Young Scholars of China(No.51125019)the National Natural Science Foundation of China(Nos.50904050,51244007)+2 种基金the Basic Projects of Sichuan Province(2011JY0106)the Department of Education Science and Technology Innovation Team Program of Sichuan Province(13TD0026)the Sichuan Distinguished Youth Fund(2013JQ0037)
文摘In high sour gas reservoir drilling process, it happens occasionally that high-strength drill pipe suffers brittle fracture failure due to stress corrosion cracking, and poses serious hazard to drilling safety. To solve this problem, this paper studied the stress corrosion cracking mechanism and infl uencing factors of highstrength drill pipe in sour environment with hydrogen permeation experiments and tensile tests. We simulated practical conditions in laboratory and evaluated the stress corrosion cracking performance of the high-strength drill pipe under conditions of high stress level. For the problems occurring in use of high-strength drill pipe on site, the paper proposed a technical measure for slower stress corrosion cracking.