The velocity profiles and separation efficiency curves of a hydrocyclone were predicted by an Euler-Euler approach using a computational fluid dynamics tool ANSYS-CFX 14.5. The Euler-Euler approach is capable of consi...The velocity profiles and separation efficiency curves of a hydrocyclone were predicted by an Euler-Euler approach using a computational fluid dynamics tool ANSYS-CFX 14.5. The Euler-Euler approach is capable of considering the particle-particle interactions and is appropriate for highly laden liquid-solid mixtures. Pre- dicted results were compared and validated with experi- mental results and showed a considerably good agreement. An increase in the particle cut size with increasing solid concentration of the inlet mixture flow was observed and discussed. In addition to this, the erosion on hydrocyclone walls constructed from stainless steel 410, eroded by sand particles (mainly SiOz), was predicted with the Euler-La- grange approach. In this approach, the abrasive solid particles were traced in a Lagrangian reference frame as discrete particles. The increases in the input flow velocity, solid concentration, and the particle size have increased the erosion at the upper part of the cylindrical body of the hydrocyclone, where the tangential inlet flow enters the hydrocyclone. The erosion density in the area between the cylindrical to conical body area, in comparison to other parts of the hydrocyclone, also increased considerably. Moreover, it was observed that an increase in the particle shape factor from 0.1 to 1.0 leads to a decrease of almost 70 % in the average erosion density of the hydrocyclone wall surfaces.展开更多
The Xiaolangdi Hydro-Project is one of the large projects on the main stem of the Middle Yellow River. It has been operated for more than 10 years, since its impoundment in October, 1999. The reservoir has trapped 2.8...The Xiaolangdi Hydro-Project is one of the large projects on the main stem of the Middle Yellow River. It has been operated for more than 10 years, since its impoundment in October, 1999. The reservoir has trapped 2.833 × 10^9 m3 of sediment, and caused the total erosion of 1.891 × 10^9t in the Lower Yellow River from October, 1999 through October, 2010. Not only the serious atrophied situation of the Lower Yellow River (LYR) has been resuscitating, but also many new phenomena of sediment transport and behaviors of channel re-establishing are coming into being. They are illustrated and discussed in detail in this paper.展开更多
基金“Stiftung Rheinland-Pfalz fur Innovation,Mainz,Germany,”for financial support
文摘The velocity profiles and separation efficiency curves of a hydrocyclone were predicted by an Euler-Euler approach using a computational fluid dynamics tool ANSYS-CFX 14.5. The Euler-Euler approach is capable of considering the particle-particle interactions and is appropriate for highly laden liquid-solid mixtures. Pre- dicted results were compared and validated with experi- mental results and showed a considerably good agreement. An increase in the particle cut size with increasing solid concentration of the inlet mixture flow was observed and discussed. In addition to this, the erosion on hydrocyclone walls constructed from stainless steel 410, eroded by sand particles (mainly SiOz), was predicted with the Euler-La- grange approach. In this approach, the abrasive solid particles were traced in a Lagrangian reference frame as discrete particles. The increases in the input flow velocity, solid concentration, and the particle size have increased the erosion at the upper part of the cylindrical body of the hydrocyclone, where the tangential inlet flow enters the hydrocyclone. The erosion density in the area between the cylindrical to conical body area, in comparison to other parts of the hydrocyclone, also increased considerably. Moreover, it was observed that an increase in the particle shape factor from 0.1 to 1.0 leads to a decrease of almost 70 % in the average erosion density of the hydrocyclone wall surfaces.
基金Project supported by the National Basic Research and Development Program of China(973Program,Grant No.2011CB409901)the"12th Five-Year Plan"to Support Science and Technology Project(Grant No.2012BAB02B01)the Special Funds for Public Welfare Project(Grant No.200901014)
文摘The Xiaolangdi Hydro-Project is one of the large projects on the main stem of the Middle Yellow River. It has been operated for more than 10 years, since its impoundment in October, 1999. The reservoir has trapped 2.833 × 10^9 m3 of sediment, and caused the total erosion of 1.891 × 10^9t in the Lower Yellow River from October, 1999 through October, 2010. Not only the serious atrophied situation of the Lower Yellow River (LYR) has been resuscitating, but also many new phenomena of sediment transport and behaviors of channel re-establishing are coming into being. They are illustrated and discussed in detail in this paper.