期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Applying Analytical Hierarchy Process to a WiMAX Performance Evaluation Model
1
作者 Ronald Shiu Keung Kwan Kim Fung Tsang 《ZTE Communications》 2010年第3期50-55,共6页
Evaluating performance of individual features of WiMAX technology is a topic of widespread discussion. Currently, there is no quantitative way of measuring WiMAX technology so that wireless operators can meet their de... Evaluating performance of individual features of WiMAX technology is a topic of widespread discussion. Currently, there is no quantitative way of measuring WiMAX technology so that wireless operators can meet their design objectives. This paper outlines a set of design criteria for WiMAX and provides a decision-making aid that ranks the importance of criteria using Analytic Hierarchy Process (AHP). This ranking should sufficiently reflect market expectations of the relative importance of various design criteria. A model integrating AHP priorities with enhanced Data Envelopment Analysis (DEA) is the basis for formulating a technological value in simple, comparable format. A case study is provided to show how this technological value is used to evaluate a three year network deployment plan. In the future, this model could be extended to WiMAX equipment suppliers for the purpose of validating performance targets of individual criteria, and enhancing supplier roadmaps for future network development. 展开更多
关键词 WIMAX Applying analytical hierarchy process to a WiMAX Performance evaluation Model
下载PDF
Evaluation of suitability area by ground source heat pump system in Baotou plain
2
作者 WANG Chunpeng WANG Qinghua +2 位作者 FENG Lei FENG Ye CHENG Sanhuan 《Global Geology》 2014年第3期176-181,共6页
According to the elements of hydrogeological conditions,lithology,stratigraphic thermal physical parameters,construction technology and economic rational elements,the evaluation system of ground source heat pump( GSHP... According to the elements of hydrogeological conditions,lithology,stratigraphic thermal physical parameters,construction technology and economic rational elements,the evaluation system of ground source heat pump( GSHP) were established in Baotou plain. The factor weights were determined by using analytic hierarchy process,and the comprehensive element method was selected to evaluate the region suitability of GSHP system. The results show that the suitable area is 559. 63 km2 for utilizing GSHP in the studied area,accounting for 62. 58% of the total area; while the unsuitable area is 334. 60 km2,accounting for37.42%. The evaluating results can provide not only a scientific basis for development and utilization rationally of shallow geothermal heat in Baotou,but also offer an important reference to the other areas. 展开更多
关键词 Baotou plain ground source heat pump suitability area evaluation analytic hierarchy process comprehensive element method
下载PDF
Detection of schedule delay risk of empirical construction projects 被引量:1
3
作者 Tsegay GEBREHIWET Hanbin LUO 《Frontiers of Engineering Management》 2018年第2期251-267,共17页
In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properly addressed. Although several studies have been focused on the various effects of risk in construction projects, ... In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properly addressed. Although several studies have been focused on the various effects of risk in construction projects, limited efforts have been made to investigate the typical and the overall schedule delay risk. In this study, our aim is to detect the typical and overall schedule delay risk throughout the construction project lifecycle, which consists of the pre-construction, construction, and post-construction stages, and compare the stages with each other. Common criteria, sub-criteria, and attributes were developed for all alternatives for the purpose of making a risk decision. The methodology that was followed integrated the multiplecriteria decision-making(MCDM) model of fuzzy analytic hierarchy process comprehensive evaluation(FAHPCE)and the relative important index(RII). Data were collected from 77 participants, who were selected through purposive sampling from different contracting organizations in Ethiopian construction projects by means of questionnaires that were distributed to experienced experts. The findings showed that there is a typical delay risk either in the type or in the level of the different construction activities.Consequently, the most influenced alternative is the construction stage because of the high-risk responsibility,resource, and contract condition related criteria. The postconstruction stage was the second most influenced stage because of the high-risk responsibility-related criteria. The pre-constructed stage was the least influenced stage that consist high-risk criteria of responsibility, resource, and contract condition related. These differences provided noteworthy information about risk mitigation in construction projects by identifying the exact risk level on specific activity to make appropriate decision. 展开更多
关键词 fuzzy analytic hierarchy process comprehensive evaluation construction project detection of delay risk relative important index