期刊文献+
共找到12篇文章
< 1 >
每页显示 20 50 100
Numerical Simulation of Surrounding Rock Deformation and Grouting Reinforcement of Cross-Fault Tunnel under Different Excavation Methods
1
作者 Duan Zhu Zhende Zhu +2 位作者 Cong Zhang LunDai Baotian Wang 《Computer Modeling in Engineering & Sciences》 SCIE EI 2024年第3期2445-2470,共26页
Tunnel construction is susceptible to accidents such as loosening, deformation, collapse, and water inrush, especiallyunder complex geological conditions like dense fault areas. These accidents can cause instability a... Tunnel construction is susceptible to accidents such as loosening, deformation, collapse, and water inrush, especiallyunder complex geological conditions like dense fault areas. These accidents can cause instability and damageto the tunnel. As a result, it is essential to conduct research on tunnel construction and grouting reinforcementtechnology in fault fracture zones to address these issues and ensure the safety of tunnel excavation projects. Thisstudy utilized the Xianglushan cross-fault tunnel to conduct a comprehensive analysis on the construction, support,and reinforcement of a tunnel crossing a fault fracture zone using the three-dimensional finite element numericalmethod. The study yielded the following research conclusions: The excavation conditions of the cross-fault tunnelarray were analyzed to determine the optimal construction method for excavation while controlling deformationand stress in the surrounding rock. The middle partition method (CD method) was found to be the most suitable.Additionally, the effects of advanced reinforcement grouting on the cross-fault fracture zone tunnel were studied,and the optimal combination of grouting reinforcement range (140°) and grouting thickness (1m) was determined.The stress and deformation data obtained fromon-site monitoring of the surrounding rock was slightly lower thanthe numerical simulation results. However, the change trend of both sets of data was found to be consistent. Theseresearch findings provide technical analysis and data support for the construction and design of cross-fault tunnels. 展开更多
关键词 Cross-fault tunnel finite element analysis excavation methods surrounding rock deformation grouting reinforcement
下载PDF
Exploring the feasibility of prestressed anchor cables as an alternative to temporary support in the excavation of super-large-span tunnel
2
作者 Shunhua Zhou Yuyin Jin +3 位作者 Zhiyao Tian Chunhua Zou Heming Zhao Zengrun Miao 《Railway Engineering Science》 EI 2024年第3期344-360,共17页
Excavating super-large-span tunnels in soft rock masses presents significant challenges.To ensure safety,the sequential excavation method is commonly adopted.It utilizes internal temporary supports to spatially partit... Excavating super-large-span tunnels in soft rock masses presents significant challenges.To ensure safety,the sequential excavation method is commonly adopted.It utilizes internal temporary supports to spatially partition the tunnel face and divide the excavation into multiple stages.However,these internal supports generally impose spatial constraints,limiting the use of large-scale excavation equipment and reducing construction efficiency.To address this constraint,this study adopts the“Shed-frame”principle to explore the feasibility of an innovative support system,which aims to replace internal supports with prestressed anchor cables and thus provide a more spacious working space with fewer internal obstructions.To evaluate its effectiveness,a field case involving the excavation of a 24-m span tunnel in soft rock is presented,and an analysis of extensive field data is conducted to study the deformation characteristics of the surrounding rock and the mechanical behavior of the support system.The results revealed that prestressed anchor cables integrated the initial support with the shed,creating an effective“shed-frame”system,which successively maintained tunnel deformation and frame stress levels within safe regulatory bounds.Moreover,the prestressed anchor cables bolstered the surrounding rock effectively and reduced the excavation-induced disturbance zone significantly.In summary,the proposed support system balances construction efficiency and safety.These field experiences may offer valuable insights into the popularization and further development of prestressed anchor cable support systems. 展开更多
关键词 Super-large-span tunnel Construction safety Sequential excavation method Shed-frame principle Prestressed anchor cables
下载PDF
Feasibility evaluation for excavation of Naghshe Jahan Square subway station by underground methods 被引量:3
3
作者 Morteza Abdi Cherlo Hamid Hashemolhosseini +1 位作者 Masoud Cheraghi Saeed Mahdevari 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2013年第6期452-459,共8页
In recent years, in reaction to the increasing usage of urban areas, the excavation of underground spaces has been developed. One of the most challenging issues encountered by engineers is the construction of subway s... In recent years, in reaction to the increasing usage of urban areas, the excavation of underground spaces has been developed. One of the most challenging issues encountered by engineers is the construction of subway stations as large underground spaces at shallow depth with soft surrounding soils. In this paper, Naghshe Jahan Square subway station located in Isfahan, Iran, has been simulated by geomechanical fnite difference method(FDM). This station is located under important historical structures. Therefore, the ground displacement and surface settlement induced by the excavation of the subway station should be strictly controlled. Many of such problems are affected by selected excavation method. For these reasons, different underground excavation methods associated with construction have been studied. In this study, sequential excavation method and large-diameter curved pipe roofng method are used and the numerical results of the two methods are compared. The presence of groundwater table obliges us to choose special techniques for the stability of the ground around the subway station during construction; hence compressed air and ground freezing techniques are utilized in the simulations of the subway station. Finally, after choosing appropriate support systems, the large-diameter curved pipe roofng method with 1.5 m spacing between curved pipes is proposed. 展开更多
关键词 Subway station Sequential excavation method Compressed air Ground freezing Large-diameter curved pipe roofng method
下载PDF
Model test of negative Poisson’s ratio cable for supporting super-largespan tunnel using excavation compensation method
4
作者 Manchao He Aipeng Guo +4 位作者 Zhifeng Du Songyuan Liu Chun Zhu Shiding Cao Zhigang Tao 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2023年第6期1355-1369,共15页
In recent years,there is a scenario in urban tunnel constructions to build super-large-span tunnels for traffic diversion and route optimization purposes.However,the increased size makes tunnel support more difficult.... In recent years,there is a scenario in urban tunnel constructions to build super-large-span tunnels for traffic diversion and route optimization purposes.However,the increased size makes tunnel support more difficult.Unfortunately,there are few studies on the failure and support mechanism of the surrounding rocks in the excavation of supported tunnel,while most model tests of super-large-span tunnels focus on the failure characteristics of surrounding rocks in tunnel excavation without supports.Based on excavation compensation method(ECM),model tests of a super-large-span tunnel excavation by different anchor cable support methods in the initial support stage were carried out.The results indicate that during excavation of super-large-span tunnel,the stress and displacement of the shallow surrounding rocks decrease,following a step-shape pattern,and the tunnel failure is mainly concentrated on the vault and spandrel areas.Compared with conventional anchor cable supports,the NPR(negative Poisson’s ratio)anchor cable support is more suitable for the initial support stage of the super-large-span tunnels.The tunnel support theory,model test materials,methods,and the results obtained in this study could provide references for study of similar super-large-span tunnels。 展开更多
关键词 Super-large-span tunnel excavation compensation method(ECM) NPR(Negative Poisson’s ratio)anchor cable Model test
下载PDF
开挖补偿法防控深部地下岩爆灾害——引汉济渭工程秦岭输水隧洞案例分析 被引量:1
5
作者 Jie Hu Manchao He +4 位作者 Hongru Li Zhigang Tao Dongqiao Liu Tai Cheng Di Peng 《Engineering》 SCIE EI CAS CSCD 2024年第3期154-163,共10页
Rockburst disasters occur frequently during deep underground excavation,yet traditional concepts and methods can hardly meet the requirements for support under high geo-stress conditions.Consequently,rockburst control... Rockburst disasters occur frequently during deep underground excavation,yet traditional concepts and methods can hardly meet the requirements for support under high geo-stress conditions.Consequently,rockburst control remains challenging in the engineering field.In this study,the mechanism of excavation-induced rockburst was briefly described,and it was proposed to apply the excavation compensation method(ECM)to rockburst control.Moreover,a field test was carried out on the Qinling Water Conveyance Tunnel.The following beneficial findings were obtained:Excavation leads to changes in the engineering stress state of surrounding rock and results in the generation of excess energy DE,which is the fundamental cause of rockburst.The ECM,which aims to offset the deep excavation effect and lower the risk of rockburst,is an active support strategy based on high pre-stress compensation.The new negative Poisson’s ratio(NPR)bolt developed has the mechanical characteristics of high strength,high toughness,and impact resistance,serving as the material basis for the ECM.The field test results reveal that the ECM and the NPR bolt succeed in controlling rockburst disasters effectively.The research results are expected to provide guidance for rockburst support in deep underground projects such as Sichuan-Xizang Railway. 展开更多
关键词 ROCKBURST excavation compensation method Pre-stressed support Negative Poisson’s ratio bolt Tunnel boring machine
下载PDF
Compensation excavation method control for large deformation disaster of mountain soft rock tunnel 被引量:16
6
作者 Manchao He Qiru Sui +2 位作者 Mengnan Li Zhijiao Wang Zhigang Tao 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2022年第5期951-963,共13页
In recent years,the mine tunneling method and the new Austrian tunneling method have been considered the main theories of tunneling approaches in China.It is difficult for the traditional technique to overcome the lar... In recent years,the mine tunneling method and the new Austrian tunneling method have been considered the main theories of tunneling approaches in China.It is difficult for the traditional technique to overcome the large deformation problems imposed by complex geological conditions of mountain soft rock tunneling.Hence,the compensation excavation method has been proposed to solve this issue under the consideration that all damage in tunneling originates from the excavation.It uses supportive strategies to counteract the excavation effects successfully.This paper provides an overview of the fundamental ideas of the compensation excavation method,methodologies,and field applications.The scientific validity and feasibility of the compensation excavation method were investigated through the practical engineering study of the Muzhailing and Changning tunnels. 展开更多
关键词 Tunnel engineering excavation method Soft rock Large deformation Compensation excavation method
下载PDF
Fracture development around deep underground excavations: Insights from FDEM modelling 被引量:25
7
作者 Andrea Lisjak Daniel Figi Giovanni Grasselli 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2014年第6期493-505,共13页
Over the past twenty years, there has been a growing interest in the development of numerical modelsthat can realistically capture the progressive failure of rock masses. In particular, the investigation ofdamage deve... Over the past twenty years, there has been a growing interest in the development of numerical modelsthat can realistically capture the progressive failure of rock masses. In particular, the investigation ofdamage development around underground excavations represents a key issue in several rock engineeringapplications, including tunnelling, mining, drilling, hydroelectric power generation, and the deepgeological disposal of nuclear waste. The goal of this paper is to show the effectiveness of a hybrid finitediscreteelement method (FDEM) code to simulate the fracturing mechanisms associated with theexcavation of underground openings in brittle rock formations. A brief review of the current state-of-theartmodelling approaches is initially provided, including the description of selecting continuum- anddiscontinuum-based techniques. Then, the influence of a number of factors, including mechanical and insitu stress anisotropy, as well as excavation geometry, on the simulated damage is analysed for threedifferent geomechanical scenarios. Firstly, the fracture nucleation and growth process under isotropicrock mass conditions is simulated for a circular shaft. Secondly, the influence of mechanical anisotropy onthe development of an excavation damaged zone (EDZ) around a tunnel excavated in a layered rockformation is considered. Finally, the interaction mechanisms between two large caverns of an undergroundhydroelectric power station are investigated, with particular emphasis on the rock mass responsesensitivity to the pillar width and excavation sequence. Overall, the numerical results indicate that FDEMsimulations can provide unique geomechanical insights in cases where an explicit consideration offracture and fragmentation processes is of paramount importance. 2014 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting byElsevier B.V. All rights reserved. 展开更多
关键词 Tunnelling Caverns Rock fracturing excavation damaged zone(EDZ) Hybrid finite-discrete element method(FDEM) Numerical modelling
下载PDF
Application of excavation compensation method for enhancing stability and efficiency in shallow large-span rock tunnels
8
作者 BIAN Wen-hui YANG Jun +2 位作者 ZHU Chun WANG Ke-xue XU Dong-ming 《Journal of Central South University》 SCIE EI CAS 2024年第9期3242-3263,共22页
Engineering shallow,large-span rock tunnels challenges deformation control and escalates construction costs.This study investigates the excavation compensation method(ECM)and its associated technologies to address the... Engineering shallow,large-span rock tunnels challenges deformation control and escalates construction costs.This study investigates the excavation compensation method(ECM)and its associated technologies to address these issues.Utilizing five key technologies,the ECM effectively modulates radial stress post-excavation,redistributes stress in the surrounding rock,and eliminates tensile stress at the excavation face.Pre-tensioning measures further enhance the rock’s residual strength,establishing a new stability equilibrium.Field tests corroborate the method’s effectiveness,demonstrating a crown settlement reduction of 3–8 mm,a nearly 50%decrease compared to conventional construction approaches.Additionally,material consumption and construction duration were reduced by approximately 30%–35%and 1.75 months per 100 m,respectively.Thus,the ECM represents a significant innovation in enhancing the stability and construction efficiency of large-span rock tunnels,marking a novel contribution to the engineering field. 展开更多
关键词 excavation compensation method rocky tunnels shallow spanning tunnels tunnel support field test
下载PDF
Interaction analyses between tunnel and landslide in mountain area 被引量:6
9
作者 ZHANG Zhi-guo ZHAO Qi-hua +1 位作者 XU Chen XU Xiao-yang 《Journal of Mountain Science》 SCIE CSCD 2017年第6期1124-1139,共16页
This paper focuses on the analytical derivation and the numerical simulation analyses to predict the interaction influences between a landslide and a new tunnel in mountain areas. Based on the slip-line theory, the di... This paper focuses on the analytical derivation and the numerical simulation analyses to predict the interaction influences between a landslide and a new tunnel in mountain areas. Based on the slip-line theory, the disturbance range induced by tunneling and the minimum safe distance between the tunnel vault and the sliding belt are obtained in consideration of the mechanical analyses of relaxed rocks over the tunnel opening. The influence factors for the minimum safe crossing distance are conducted,including the tunnel radius, the friction angle of surrounding rocks, the inclination angle of sliding belt,and the friction coefficient of surrounding rocks. Secondly, taking account of the compressive zone and relaxed rocks caused by tunneling, the Sarma method is employed to calculate the safety factor of landslide. Finally, the analytical solutions for interaction between the tunnel and the landslide are compared with a series of numerical simulations, considering the cases for different perpendicular distances between the tunnel vault and the sliding belt. Resultsshow that the distance between the tunnel vault and the slip zone has significant influence on the rock stress and strain. For the case of the minimum crossing distance, a plastic zone in the landslide traversed by tunneling would be formed with rather large range, which seriously threatens the stability of landslide. This work demonstrates that the minimum safe crossing distance obtained from numerical simulation is in a good agreement with that calculated by the proposed analytical solutions. 展开更多
关键词 Tunnel excavation Landslide Safe crossing distance Analytical method Numerical simulation
下载PDF
Key Techniques for the Construction of High-Speed Railway Large-Section Loess Tunnels 被引量:9
10
作者 Yong Zhao Huawu He Pengfei Li 《Engineering》 2018年第2期90-95,共6页
The successful completion of the Zhengzhou-Xi'an high-speed railway project has greatly improved the construction level of China's large-section loess tunnels, and has resulted in significant progress being made in ... The successful completion of the Zhengzhou-Xi'an high-speed railway project has greatly improved the construction level of China's large-section loess tunnels, and has resulted in significant progress being made in both design theory and construction technology. This paper systematically summarizes the tech- nical characteristics and main problems of the large-section loess tunnels on China's high-speed railway, including classification of the surrounding rock, design of the supporting structure, surface settlement and cracking control, and safe and rapid construction methods. On this basis, the key construction tech- niques of loess tunnels with large sections for high-speed railway are expounded from the aspects of design and construction. The research results show that the classification of loess strata surrounding large tunnels should be based on the geological age of the loess, and be determined by combining the plastic index and the water content. In addition, the influence of the buried depth should be considered. During tunnel excavation disturbance, if the tensile stress exceeds the soil tensile or shear strength, the surface part of the sliding trend plane can be damaged, and visible cracks can form. The pressure of the surrounding rock of a large-section loess tunnel should be calculated according to the buried depth, using the corresponding formula. A three-bench seven-step excavation method of construction was used as the core technology system to ensure the safe and rapid construction of a large-section loess tunnel, following a field test to optimize the construction parameters and determine the engineering measures to stabilize the tunnel face. The conclusions and methods presented here are of great significance in revealing the strata and supporting mechanics of large-section loess tunnels, and in optimizing the supporting structure design and the technical parameters for construction. 展开更多
关键词 Loess tunnel Surrounding rock classification Surface cracking Design load Three-bench seven-step excavation method
下载PDF
Numerical modeling for the coupled thermo-mechanical processes and spalling phenomena in sp Pillar Stability Experiment (APSE) 被引量:11
11
作者 T.Koyama M.Chijimatsu +4 位作者 H.Shimizu S.Nakama T.Fujita A.Kobayashi Y.Ohnishi 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2013年第1期58-72,共15页
In this paper, the coupled thermo-mechanical (TM) processes in the AEspoe Pillar Stability Experiment (APSE) carried out by the Swedish Nuclear Fuel and Waste Management Company (SKB) were simulated using both c... In this paper, the coupled thermo-mechanical (TM) processes in the AEspoe Pillar Stability Experiment (APSE) carried out by the Swedish Nuclear Fuel and Waste Management Company (SKB) were simulated using both continuum and discontinuum based numerical methods. Two-dimensional (2D) and three- dimensional (3D) finite element method (FEM) and 2D distinct element method (DEM) with particles were used. The main objective for the large scale in situ experiment is to investigate the yielding strength of crystalline rock and the formation of the excavation disturbed/damaged zone (EDZ) during excavation of two boreholes, pressurizing of one of the boreholes and heating. For the DEM simulations, the heat flow algorithm was newly introduced into the original code. The calculated stress, displacement and temperature distributions were compared with the ones obtained from in situ measurements and FEM simulations. A parametric study for initial microcracks was also performed to reproduce the spalling phenomena observed in the APSE. 展开更多
关键词 Coupled thermo-mechanical (TM)processesAspoe Pillar Stability Experiment (APSE)excavation disturbed/damaged zone (EDZ)Finite element method (FEM)Distinct element method (DEM)
下载PDF
Negative Poisson’s ratio cable compensation support for 32 m super-large-span highway tunnel:A case study
12
作者 Aipeng Guo Manchao He +3 位作者 Songyuan Liu Zhifeng Du Zengwang Lyu Zhigang Tao 《Underground Space》 SCIE EI CSCD 2024年第1期156-175,共20页
Although super-large-span tunnels ensure convenient transportation,they face many support challenges.The lack of normative construction guidance and the limited number of reference engineering cases pose a significant... Although super-large-span tunnels ensure convenient transportation,they face many support challenges.The lack of normative construction guidance and the limited number of reference engineering cases pose a significant challenge to the stability control of superlarge-span tunnels.Based on the geological conditions of a super-large-span tunnel(span=32.17 m)at the bifurcation section of the Shenzhen interchange,this study determined support parameters via theoretical calculation,numerical simulation,and engineering analogy.The support effects of negative Poisson’s ratio(NPR)anchor cables and ordinary anchor cables on super-long-span tunnels were simulated and studied.Further,based on FLAC3D simulations,the surrounding rock stress field of NPR anchor cables was analyzed under different prestressing conditions,and the mechanism of a long-short combination,high-prestress compensation NPR anchor cable support was revealed.On the basis of numerical simulations,to our knowledge,the three-dimensional(3D)geomechanical model test of the NPR anchor cable and ordinary anchor cable support for super-large-span tunnel excavation is conducted for the first time,revealing the stress evolution law of super-large-span tunnels,deformation and failure characteristics of the surrounding rock,and the changing trend of the anchor cable’s axial force,and verifies that NPR anchor cables with high preloads are suitable for super-large-span tunnel support and have advantages over ordinary anchor cables.This study can provide a reliable theoretical reference for the support design and stability control of the surrounding rock of similar shallow-buried super-large-span tunnels. 展开更多
关键词 Super-large-span tunnel Negative Poisson’s ratio(NPR)anchor cable excavation compensation method Numerical simulation Geomechanical model test
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部