Seismic risk evaluation(SRE) in early stages(e.g., project planning and preliminary design)for a mountain tunnel located in seismic areas has the same importance as that in final stages(e.g.,performance-based design, ...Seismic risk evaluation(SRE) in early stages(e.g., project planning and preliminary design)for a mountain tunnel located in seismic areas has the same importance as that in final stages(e.g.,performance-based design, structural analysis, and optimization). SRE for planning mountain tunnels bridges the gap between the planning on the macro level and the design/analysis on the micro level regarding the risk management of infrastructural systems. A transition from subjective or qualitative description to objective or quantitative quantification of seismic risk is aimed to improve the seismic behavior of the mountain tunnel and thus reduce the associated seismic risk. A new method of systematic SRE for the planning mountain tunnel was presented herein. The method employs extension theory(ET)and an ET-based improved analytical hierarchy process. Additionally, a new risk-classification criterion is proposed to classify and quantify the seismic risk for a planning mountain tunnel. This SRE method is applied to a mountain tunnel in southwest China, using the extension model based on matter element theory and dependent function operation.The reasonability and flexibility of the SRE method for application to the mountain tunnel are illustrated.According to different seismic risk levels and classification criteria, methods and measures for improving the seismic design are proposed, which can reduce the seismic risk and provide a frame of reference for elaborate seismic design.展开更多
In order to solve the problem that determining decision factors weights is of subjectivity in heterogeneous wireless network selection algorithm, a network selection algorithm based on extension theory and fuzzy analy...In order to solve the problem that determining decision factors weights is of subjectivity in heterogeneous wireless network selection algorithm, a network selection algorithm based on extension theory and fuzzy analytic hierarchy process (FAHP) is proposed in this paper. In addition, user and operator codetermine the optimal network using the proposed algorithm, which can give consideration to user and operator benefits. The fuzzy judgment matrix is coustructed by membership degree of decision factors which is calculated according to extension theory. The comprehensive weight of each decision factor is obtained using FAHP. Finally, the optimal network is selected through total property value ranldng of each candidate network under user preference and operator preference. The simulation results show that the proposed algorithm can select the optimal network efficiently and accurately, satisfy user preference, and implement load balance between networks.展开更多
Due to the increasing power consumption of whole society and widely using of new non-linear and asymmetric electrical equipment,power quality assessment problem in the new period has attracted more and more attention....Due to the increasing power consumption of whole society and widely using of new non-linear and asymmetric electrical equipment,power quality assessment problem in the new period has attracted more and more attention.The mathematical essence of comprehensive assessment of power quality is a multiattribute optimal decision-making problem.In order to solve the key problem of determining the indicator weight in the process of power quality assessment,a rough analytic hierarchy process(AHP)is proposed to aggregate the judgment opinions of multiple experts and eliminate the subjective effects of single expert judgment.Based on the advantage of extension analysis for solving the incompatibility problem,extension analysis method is adopted to assess the power quality.The assessment grades of both total power quality and each assessment indicator are obtained by correlation function.Through a case of 110 kV bus of a converting station in a wind farm of China,the feasibility and effectiveness of the propose method are demonstrated.The result shows that the proposed method can determine the overall power quality of power grid,as well as compare the differences among the performance of assessment indicators and provide the basis for further improving of power quality.展开更多
基金financially supported by the National Key Research and Development Program of China (2016YFB1200401)the Western Construction Project of the Ministry of Transport (Grant No. 2015318J29040)
文摘Seismic risk evaluation(SRE) in early stages(e.g., project planning and preliminary design)for a mountain tunnel located in seismic areas has the same importance as that in final stages(e.g.,performance-based design, structural analysis, and optimization). SRE for planning mountain tunnels bridges the gap between the planning on the macro level and the design/analysis on the micro level regarding the risk management of infrastructural systems. A transition from subjective or qualitative description to objective or quantitative quantification of seismic risk is aimed to improve the seismic behavior of the mountain tunnel and thus reduce the associated seismic risk. A new method of systematic SRE for the planning mountain tunnel was presented herein. The method employs extension theory(ET)and an ET-based improved analytical hierarchy process. Additionally, a new risk-classification criterion is proposed to classify and quantify the seismic risk for a planning mountain tunnel. This SRE method is applied to a mountain tunnel in southwest China, using the extension model based on matter element theory and dependent function operation.The reasonability and flexibility of the SRE method for application to the mountain tunnel are illustrated.According to different seismic risk levels and classification criteria, methods and measures for improving the seismic design are proposed, which can reduce the seismic risk and provide a frame of reference for elaborate seismic design.
文摘In order to solve the problem that determining decision factors weights is of subjectivity in heterogeneous wireless network selection algorithm, a network selection algorithm based on extension theory and fuzzy analytic hierarchy process (FAHP) is proposed in this paper. In addition, user and operator codetermine the optimal network using the proposed algorithm, which can give consideration to user and operator benefits. The fuzzy judgment matrix is coustructed by membership degree of decision factors which is calculated according to extension theory. The comprehensive weight of each decision factor is obtained using FAHP. Finally, the optimal network is selected through total property value ranldng of each candidate network under user preference and operator preference. The simulation results show that the proposed algorithm can select the optimal network efficiently and accurately, satisfy user preference, and implement load balance between networks.
文摘Due to the increasing power consumption of whole society and widely using of new non-linear and asymmetric electrical equipment,power quality assessment problem in the new period has attracted more and more attention.The mathematical essence of comprehensive assessment of power quality is a multiattribute optimal decision-making problem.In order to solve the key problem of determining the indicator weight in the process of power quality assessment,a rough analytic hierarchy process(AHP)is proposed to aggregate the judgment opinions of multiple experts and eliminate the subjective effects of single expert judgment.Based on the advantage of extension analysis for solving the incompatibility problem,extension analysis method is adopted to assess the power quality.The assessment grades of both total power quality and each assessment indicator are obtained by correlation function.Through a case of 110 kV bus of a converting station in a wind farm of China,the feasibility and effectiveness of the propose method are demonstrated.The result shows that the proposed method can determine the overall power quality of power grid,as well as compare the differences among the performance of assessment indicators and provide the basis for further improving of power quality.