The setting work of backup protection using steady-state current is tedious,and mismatches occasionally occur due to the increased proportion of distributed generations(DGs)connected to the power grid.Thus,there is a ...The setting work of backup protection using steady-state current is tedious,and mismatches occasionally occur due to the increased proportion of distributed generations(DGs)connected to the power grid.Thus,there is a practical need to study a backup protection technology that does not require step-by-step setting and can be adaptively coordinated.This paper proposes an action sequence adaptive to fault positions that uses only positive sequence fault component(PSFC)voltage.Considering the influence of DGs,the unified time dial setting can be obtained by selecting specific points.The protection performance is improved by using the adjacent upstream and downstream protections to meet the coordination time interval in the case of metallic faults at the near-and far-ends of the line.Finally,the expression and implementation scheme for inverse-time backup protection(ITBP)based on the unified characteristic equation is given.Simulation results show that this scheme can adapt to DG penetration scenarios and can realize the adaptive coordination of multi-level relays.展开更多
Studying the geologic architecture of the Xiong'an New Area will provide important basis for the evaluation of crustal stability, urban planning and infrastructural projects in this region, and it is also of great...Studying the geologic architecture of the Xiong'an New Area will provide important basis for the evaluation of crustal stability, urban planning and infrastructural projects in this region, and it is also of great significance in exploring the occurrence of oil and gas, geothermal, hot dry rock and other resources. The stratigraphic system of the study area is established by using latest high quality seismic reflection and deep borehole data. Characteristics of the major faults developed in the study area are finely depicted with the method of structural analysis. Tectonic evolution of Xiong'an and adjacent areas is reconstructed by using balanced geological cross-section technique. The tectonic activity of the study area is discussed on the basis of the development of secondary faults and the distribution of active earthquakes across the region. This study demonstrates that Xiong'an New Area is located at the transfer zone of the central and northern Jizhong Depression. There are three regional unconformities developed in this area, by which four structural layers are sub-divided. Controlled by the Taihang Mountain piedmont fault, the Daxing fault, the Rongcheng fault and the Niudong fault, the structural framework of the study area is characterized by intervening highs with sags. This structural pattern has an important controlling over the reservoir characteristics, hydrocarbon accumulation and the distribution of geothermal resources and hot dry rock within this region. Rifting in this area began in the early Paleogene, exhibiting typical episodic character and became inactive in Neogene. The development feature of secondary faults along with the distribution of active earthquakes indicate that Xiong'an New Area has been in a relatively stable tectonic setting since the Neogene, while the Baxian Sag and other structural units to the east of it have obviously been in a rather active environment.展开更多
Previous test sequencing algorithms only consider the execution cost of a test at the application stage. Due to the fact that the placement cost of some tests at the design stage is considerably high compared with the...Previous test sequencing algorithms only consider the execution cost of a test at the application stage. Due to the fact that the placement cost of some tests at the design stage is considerably high compared with the execution cost, the sequential diagnosis strategy obtained by previous methods is actually not optimal from the view of life cycle. In this paper, the test sequencing problem based on life cycle cost is presented. It is formulated as an optimization problem, which is non-deterministic polynomial-time hard (NP-hard). An algorithm and a strategy to improve its computational efficiency are proposed. The formulation and algorithms are tested on various simulated systems and comparisons are made with the extant test sequencing methods. Application on a pump rotational speed control (PRSC) system of a spacecraft is studied in detail. Both the simulation results and the real-world case application results suggest that the solution proposed in this paper can significantly reduce the life cycle cost of a sequential fault diagnosis strategy.展开更多
基金supported in part by the National Natural Science Foundation of China(NSFC-UKRI_EPSRC)(No.52061635105)in part by the Science and Technology Program of SGCC(No.5100-202040327A-0-0-00).
文摘The setting work of backup protection using steady-state current is tedious,and mismatches occasionally occur due to the increased proportion of distributed generations(DGs)connected to the power grid.Thus,there is a practical need to study a backup protection technology that does not require step-by-step setting and can be adaptively coordinated.This paper proposes an action sequence adaptive to fault positions that uses only positive sequence fault component(PSFC)voltage.Considering the influence of DGs,the unified time dial setting can be obtained by selecting specific points.The protection performance is improved by using the adjacent upstream and downstream protections to meet the coordination time interval in the case of metallic faults at the near-and far-ends of the line.Finally,the expression and implementation scheme for inverse-time backup protection(ITBP)based on the unified characteristic equation is given.Simulation results show that this scheme can adapt to DG penetration scenarios and can realize the adaptive coordination of multi-level relays.
基金supported by the National Key Research and Development Program of China (Grant No. 2017YFC0601405)the National Natural Science Foundation of China (Grant No. 41430316)
文摘Studying the geologic architecture of the Xiong'an New Area will provide important basis for the evaluation of crustal stability, urban planning and infrastructural projects in this region, and it is also of great significance in exploring the occurrence of oil and gas, geothermal, hot dry rock and other resources. The stratigraphic system of the study area is established by using latest high quality seismic reflection and deep borehole data. Characteristics of the major faults developed in the study area are finely depicted with the method of structural analysis. Tectonic evolution of Xiong'an and adjacent areas is reconstructed by using balanced geological cross-section technique. The tectonic activity of the study area is discussed on the basis of the development of secondary faults and the distribution of active earthquakes across the region. This study demonstrates that Xiong'an New Area is located at the transfer zone of the central and northern Jizhong Depression. There are three regional unconformities developed in this area, by which four structural layers are sub-divided. Controlled by the Taihang Mountain piedmont fault, the Daxing fault, the Rongcheng fault and the Niudong fault, the structural framework of the study area is characterized by intervening highs with sags. This structural pattern has an important controlling over the reservoir characteristics, hydrocarbon accumulation and the distribution of geothermal resources and hot dry rock within this region. Rifting in this area began in the early Paleogene, exhibiting typical episodic character and became inactive in Neogene. The development feature of secondary faults along with the distribution of active earthquakes indicate that Xiong'an New Area has been in a relatively stable tectonic setting since the Neogene, while the Baxian Sag and other structural units to the east of it have obviously been in a rather active environment.
基金supported by China Civil Space Foundation(No.C1320063131)
文摘Previous test sequencing algorithms only consider the execution cost of a test at the application stage. Due to the fact that the placement cost of some tests at the design stage is considerably high compared with the execution cost, the sequential diagnosis strategy obtained by previous methods is actually not optimal from the view of life cycle. In this paper, the test sequencing problem based on life cycle cost is presented. It is formulated as an optimization problem, which is non-deterministic polynomial-time hard (NP-hard). An algorithm and a strategy to improve its computational efficiency are proposed. The formulation and algorithms are tested on various simulated systems and comparisons are made with the extant test sequencing methods. Application on a pump rotational speed control (PRSC) system of a spacecraft is studied in detail. Both the simulation results and the real-world case application results suggest that the solution proposed in this paper can significantly reduce the life cycle cost of a sequential fault diagnosis strategy.