期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Field load testing of copper extraction aeration pipes under simulated high heap pile
1
作者 Shad M.Sargand Teruhisa Masada Jim Goddard 《International Journal of Mining Science and Technology》 SCIE EI 2013年第5期751-756,共6页
Recently a research team at Ohio University,USA,conducted a unique full-scale feld load test to simulate the aeration pipe installations at a copper extraction mine operated in Chile.The overliner material taken from ... Recently a research team at Ohio University,USA,conducted a unique full-scale feld load test to simulate the aeration pipe installations at a copper extraction mine operated in Chile.The overliner material taken from the mine was used in recreating the in situ conditions.Electric heaters were utilized to raise the temperature inside each pipe to simulate the essential element of the copper extraction process.The maximum vertical deflection reached by the test pipes was close to 20%,when the simulated heap pile height was 80 m.The plastic pipes and the overliner material were also tested in the laboratory.Based on the results,the maximum heap pile fll depth was recommended for the aeration system.The results indicated that the vertical deflection was the primary performance index for the aeration pipes installed in heap piles at mines.Lastly,the pipe made of polypropylene resin was super. 展开更多
关键词 Copper extraction Aeration pipe Heap pile field load test Laboratory testing
下载PDF
Field Load Test Based SHM System Safety Standard Determination for Rigid Frame Bridge
2
作者 Xilong Zheng Qiong Wang Di Guan 《Structural Durability & Health Monitoring》 EI 2024年第3期361-376,共16页
The deteriorated continuous rigid frame bridge is strengthened by external prestressing. Static loading tests wereconducted before and after the bridge rehabilitation to verify the effectiveness of the rehabilitation ... The deteriorated continuous rigid frame bridge is strengthened by external prestressing. Static loading tests wereconducted before and after the bridge rehabilitation to verify the effectiveness of the rehabilitation process. Thestiffness of the repaired bridge is improved, and the maximum deflection of the load test is reduced from 37.9 to27.6 mm. A bridge health monitoring system is installed after the bridge is reinforced. To achieve an easy assessmentof the bridge’s safety status by directly using transferred data, a real-time safety warning system is createdbased on a five-level safety standard. The threshold for each safety level will be determined by theoretical calculationsand the outcomes of static loading tests. The highest risk threshold will be set at the ultimate limit statevalue. The remaining levels, namely middle risk, low risk, and very low risk, will be determined usingreduction coefficients of 0.95, 0.9, and 0.8, respectively. 展开更多
关键词 Continuous rigid frame bridge rehabilitation long-term monitoring field load test safety standard determination
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部