In flood control dams it is not only the failure to prevent flood larger than their design carrying capacity, but also the uncertainties of hydraulic factors that cause disasters. In general, the hydraulic risk is not...In flood control dams it is not only the failure to prevent flood larger than their design carrying capacity, but also the uncertainties of hydraulic factors that cause disasters. In general, the hydraulic risk is not considered in most of the hydrological analysis in floodproofing plan and design. In this paper, a method of evaluating the hydraulic risk is developed by employing risk theory, and the concept can easily be extended to other types of risk analysis. As a result, it is possible not to consider the hydraulic resks when the design hydrologic risk of flood control dam is lger. Otherwise, the hydraulic risks must be noticed. The research is very helpful for the development of the flood control theory used at present.展开更多
According to theoretical analysis, a general characteristic of the ground vibration induced by high dam flood discharge is that the dominant frequency ranges over several narrow frequency bands, which is verified by o...According to theoretical analysis, a general characteristic of the ground vibration induced by high dam flood discharge is that the dominant frequency ranges over several narrow frequency bands, which is verified by observations from the Xiangjiaba Hydropower Station. Nonlinear base isolation is used to reduce the structure vibration under ground excitation and the advantage of the isolation application is that the low-frequency resonance problem does not need to be considered due to its excitation characteristics, which significantly facilitate the isolation design. In order to obtain the response probabilistic distribution of a nonlinear system, the state space split technique is modified. As only a few degrees of freedom are subjected to the random noise, the probabilistic distribution of the response without involving stochastic excitation is represented by the δ function. Then, the sampling property of the δ function is employed to reduce the dimension of the Fokker-Planck-Kolmogorov (FPK) equation and the low-dimensional FPK equation is solvable with existing methods. Numerical results indicate that the proposed approach is effective and accurate. Moreover, the response probabilistic distributions are more reasonable and scientific than the peak responses calculated by conventional time and frequency domain methods.展开更多
Full operation of the Three Gorges Dam(TGD) reduces flood risk of the middle and lower parts of the Yangtze River Basin. However,Dongting Lake, which is located in the Yangtze River Basin, is still at high risk for po...Full operation of the Three Gorges Dam(TGD) reduces flood risk of the middle and lower parts of the Yangtze River Basin. However,Dongting Lake, which is located in the Yangtze River Basin, is still at high risk for potentially severe flooding in the future. The effects of the TGD on flood processes were investigated using a hydrodynamic model. The 1998 and 2010 flood events before and after the operation of the TGD, respectively, were analyzed. The numerical results show that the operation of the TGD changes flood processes, including the timing and magnitude of flood peaks in Dongting Lake. The TGD can effectively reduce the flood level in Dongting Lake, which is mainly caused by the flood water from the upper reach of the Yangtze River. This is not the case, however, for floods mainly induced by flood water from four main rivers in the catchment. In view of this, a comprehensive strategy for flood management in Dongting Lake is required. Non-engineering measures, such as warning systems and combined operation of the TGD and other reservoirs in the catchment, as well as traditional engineering measures, should be further improved. Meanwhile, a sustainable philosophy for flood control, including natural flood management and lake restoration, is recommended to reduce the flood risk.展开更多
Based on the natural disaster risk evaluation mode, a quantitative danger degree evaluation model was developed to evaluate the danger degree of earth dam reservoir staged operation in the flood season. A formula for ...Based on the natural disaster risk evaluation mode, a quantitative danger degree evaluation model was developed to evaluate the danger degree of earth dam reservoir staged operation in the flood season. A formula for the overtopping risk rate of the earth dam reservoir staged operation was established, with consideration of the joint effect of flood and wind waves in the flood sub-seasons with the Monte Carlo method, and the integrated overtopping risk rate for the whole flood season was obtained via the total probability approach. A composite normalized function was used to transform the dam overtopping risk rate into the danger degree, on a scale of 0-1. Danger degree gradating criteria were divided by four significant characteristic values of the dam overtopping rate, and corresponding guidelines for danger evaluation are explained in detail in this paper. Examples indicated that the dam overtopping danger degree of the Chengbihe Reservoir in China was 0.33-0.57, within the range of moderate danger level, and the flood-limiting water level (FLWL) can be adjusted to 185.00 m for the early and main flood seasons, and 185.00-187.50 m for the late flood season. The proposed quantitative model offers a theoretical basis for determination of the value of the danger degree of an earth dam reservoir under normal operation as well as the optimal scheduling scheme for the reservoir in each stage of the flood season.展开更多
The possible mitigation of floods by dams and the risk to dams from floods are key problems. The People's Republic of China is now leading world dam construction with great success and efficiency. This paper is de...The possible mitigation of floods by dams and the risk to dams from floods are key problems. The People's Republic of China is now leading world dam construction with great success and efficiency. This paper is devoted to relevant experiences from other countries, with a particular focus on lessons from accidents over the past two centuries and on new solutions. Accidents from floods are analyzed according to the dam's height, storage, dam material, and spillway data. Most of the huge accidents that have been reported occurred for embankments storing over 10 hm3. New solutions appear promising for both dam safety and flood mitigation.展开更多
Accurate prediction of the hydrographs of outburst floods induced by landslide dam overtopping failure is necessary for hazard prevention and mitigation. In this study, flume model tests on the breaching of landslide ...Accurate prediction of the hydrographs of outburst floods induced by landslide dam overtopping failure is necessary for hazard prevention and mitigation. In this study, flume model tests on the breaching of landslide dams were conducted. Unconsolidated soil materials with wide grain size distributions were used to construct the dam. The effects of different upstream inflow discharges and downstream bed soil erosion on the outburst peak discharge were investigated. Experimental results reveal that the whole hydrodynamic process of landslide dam breaching can be divided into three stages as defined by clear inflection points and peak discharges. The larger the inflow discharge, the shorter the time it takes to reach the peak discharge, and the larger the outburst flood peak discharge. The scale of the outburst floods was found to be amplified by the presence of an erodible bed located downstream of the landslide dam. This amplification decreases with the increase of upstream inflow. In addition, the results show that the existence of an erodible bed increases the density of the outburst flow, increasing its probability of transforming from a sediment flow to a debris flow.展开更多
Glacial outburst floods(GLOFs) in alpine regions tend to be relatively complicated, multi-stage catastrophes, capable of causing significant geomorphologic changes in channel surroundings and posing severe threats t...Glacial outburst floods(GLOFs) in alpine regions tend to be relatively complicated, multi-stage catastrophes, capable of causing significant geomorphologic changes in channel surroundings and posing severe threats to infrastructure and the safety and livelihoods of human communities. GLOF disasters have been observed and potential hazards can be foreseen due to the newly formed glacial lakes or the expansion of existing ones in the Poiqu River Basin in Tibet, China. Here we presented a synthesis of GLOF-related studies including triggering mechanism(s), dam breach modeling, and flood routing simulation that have been employed to reconstruct or forecast GLOF hydrographs. We provided a framework for probability-based GLOFs simulation and hazard mapping in the Poiqu River Basin according to available knowledge. We also discussed the uncertainties and challenges in the model chains, which may form the basis for further research.展开更多
Badush Dam is a partially completed dam and a unique case of flood retention dams. Its intended main function is to perform flood protection once in its lifetime;that is if Mosul Dam would collapse. In such a case, th...Badush Dam is a partially completed dam and a unique case of flood retention dams. Its intended main function is to perform flood protection once in its lifetime;that is if Mosul Dam would collapse. In such a case, the Badush dam would temporarily store the whole flood wave and route it safely to the downstream. For this end, the bulk of the reservoir is left dry, while the remaining volume at the lower part which is intended for power generation does not give an economic justification for building the full height of the dam. The short duration of the intended use as a protection dam has led to relaxing many design assumptions which have raised concerns over the dam integrity. The current controversy rages now over whether to continue the construction of the dam as it was first designed or to change all that in view of the similar site geology of Mosul Dam. Mosul dam foundations suffer at the moment from the severe continuous dissolution of the soluble materials in its foundation leading to continued maintenance grouting of that foundation. This paper gives an overview of the history of Badush dam, its current design and what new requirements which are needed if it is to replace Mosul Dam itself.展开更多
The analysis of the risk of flooding upstream from the Imboulou hydroelectric dam on the Léfini River in the Republic of Congo-Brazzaville, focused on the evolution of annual rainfall and flow in the study area d...The analysis of the risk of flooding upstream from the Imboulou hydroelectric dam on the Léfini River in the Republic of Congo-Brazzaville, focused on the evolution of annual rainfall and flow in the study area during the period from 1970 to 2020 before and after the building of the dam in 2005, by applying statistical methods. These methods were used to analyse the spatial and temporal evolution of rainfall and flow at the unique hydrometric station located at the RN2 (National Road N°2) bridge in the village of Mbouambé in the Pool region. This work has shown that rainfall is not the cause of flooding in the Léfini catchment area. The monthly flow coefficient (MFC) showed exceptional flooding from November and December onwards after the dam was built, resulting in a variability of flows, with periods of high and low water. In addition, the annual average flow (AAF) and the maximum average flow (MAF) increased after the dam was built. Maximum average flows (MAF) were higher than annual average flows (AAF) throughout the period of study (1970-2020). The annual and monthly rainfall-runoff relationship showed changes after the dam was built, particularly from 2009 and during the months of November and December. .展开更多
On August 10,2019,due to the effect of a rainstorm caused by Super Typhoon Lekima,a landslide occurred in Shanzao Village,China.It blocked the Shanzao stream,forming a barrier lake,and then the barrier lake burst.This...On August 10,2019,due to the effect of a rainstorm caused by Super Typhoon Lekima,a landslide occurred in Shanzao Village,China.It blocked the Shanzao stream,forming a barrier lake,and then the barrier lake burst.This is a rare natural disaster chain of typhoon-rainstorm-landslide-barrier lake-flooding.This study was built on field surveys,satellite image interpretation,the digital elevation model(DEM),engineering geological analysis and empirical regression.The purpose was to reveal the characteristics and causes of the landslide,the features and formation process of the barrier lake and the dam break flooding discharge.The results show that the volume of the landslide deposit is approximately 2.4×105 m3.The burst mode of the landslide dam is overtopping,which took only 22 minutes from the formation of the landslide dam to its overtopping.The dam-break peak flow was 1353 m3/s,and the average velocity was 2.8–3.0 m/s.This study shows that the strongly weathered rock and soil slope has low strength and high permeability under the condition of heavy rainfall,which reminds us the high risk of landslides and the importance of accurate early warning of landslides under heavy rainfalls in densely populated areas of Southeast China,as well as the severity of the disaster chain of typhoon-rainstorm-landslide-barrier lake-flooding.展开更多
In this paper, a model of overtopping risk under the joint effects of floods and wind waves, which is based on risk analysis theory and takes into account the uncertainties of floods, wind waves, reservoir capacity an...In this paper, a model of overtopping risk under the joint effects of floods and wind waves, which is based on risk analysis theory and takes into account the uncertainties of floods, wind waves, reservoir capacity and discharge capacity of the spillway, is proposed and applied to the Chengbihe Reservoir in Baise City in Guangxi Zhuang Autonomous Region. The simulated results indicate that the flood control limiting level can be raised by 0.40 m under the condition that the reservoir overtopping risk is controlled within a mean variance of 5×10-6. As a result, the reservoir storage will increase to 16 million m3 and electrical energy generation and other functions of the reservoir will also increase greatly.展开更多
Mosul Dam is an earth fill dam located on the Tigris River in North Western part of Iraq. It is 113 m in height, 3.4 km in length, 10 m wide in its crest and has a storage capacity of 11.11 billion cubic meters. It is...Mosul Dam is an earth fill dam located on the Tigris River in North Western part of Iraq. It is 113 m in height, 3.4 km in length, 10 m wide in its crest and has a storage capacity of 11.11 billion cubic meters. It is, constructed on bedrocks which consist of gypsum beds alternated with marl and limestone, in cyclic nature. The thickness of the gypsum beds attains 18 m;they are intensely karstified even in foundation rocks. This has created number of problems during construction, impounding and operation of the dam. Construction work in Mosul Dam started on January 25th, 1981 and started operating on 24th July, 1986. After impounding in 1986, seepage locations were recognized. The cause of seepage is mainly due to: 1) The karsts prevailing in the dam site and in the reservoir area. 2) The existence of gypsum/anhydrite rock formations in the dam foundation alternating with soft marl layers and weathered and cavernous limestone beddings. 3) The presence of an extensive ground water aquifer called Wadi Malleh aquifer, which affects considerably the ground water regime in the right bank. The dissolution intensity of the gypsum/anhydrite ranged from 42 to 80 t/day which was followed by a noticeable increase in the permeability and leakages through the foundation. Inspection of the dam situation in 2014 and 2015 indicates that the dam is in a state of extreme unprecedentedly high relative risk. In this work, possible solutions to the problem are to be discussed. It is believed that grouting operations will elongate the span life of the dam but do not solve the problem. Building another dam downstream Mosul Dam will be the best protective measures due to the possible failure of Mosul Dam, to secure the safety of the downstream area and its’ population.展开更多
The Sahelian regions have experienced a drought that has made them vulnerable to hydro-climatic conditions. Strategies have been developed to re</span><span style="font-family:Verdana;">duce this...The Sahelian regions have experienced a drought that has made them vulnerable to hydro-climatic conditions. Strategies have been developed to re</span><span style="font-family:Verdana;">duce this vulnerability. The governments of Senegal, Mauritania, Mali and Guinea</span><span style="font-family:Verdana;"> have created the Organization for the development of the Senegal River (OMVS in french) with the aim of realizing large hydraulic installations. This resulted in the construction of the Diama and Manantali dams in the Senegal River Basin. The first aims to stop the saline intrusion, the second to regulate the flow of the river, to allow the irrigation of agricultural perimeters, and to produce electrical energy. The impoundment of the Diama dam has modified the hydraulic behavior of the estuary. The purpose of this study is to carry out </span><span style="font-family:Verdana;">the hydraulic modeling of the estuary of Senegal river downstream of the Diama Dam in transient mode by the HEC-RAS software. Two geometric models were </span><span style="font-family:Verdana;">constructed on the basis of a digital terrain model (DTM) using the Arc-GIS and HEC GeoRAS soft wares after processing the collected topographic data. The first geometric model, of which the areas of Senegal river downstream Diama Dam have been represented by cross-section, is one-dimensional. The </span><span style="font-family:Verdana;">second one is also one dimensional;in this model, the area of the Senegal River </span><span style="font-family:Verdana;">estuary downstream Diama Dam is introduced as water storage zones. The components of these models are the stream sections, lateral links, and storage areas. The flood hydrograph downstream Diama Dam is introduced as conditions at the upstream limits of the models while the tidal is introduced as a downstream condition. After the stability and calibration, the results given by HEC-RAS simulations are the variations of the water levels, the temporal variations of the flow rates for each section, the maximum flow velocities and the propagation times of the flood waves. The analysis and comparisons of these results strongly suggest using HEC-RAS issues as a decision-making tool helping to manage floods during times of crisis.展开更多
Most planned developments in a catchment for control of excess water using a culvert, bridge or dam spillway are located at a site in a stream where there are no discharge measurements. Even though, for gauged catchme...Most planned developments in a catchment for control of excess water using a culvert, bridge or dam spillway are located at a site in a stream where there are no discharge measurements. Even though, for gauged catchments a number of established flood frequency models and rainfall-runoff models do exist, for ungauged catchments mostly regional flood frequency and event-based rainfall-runoff models are used, which depend on regional parameters. In this paper, a regional approach for design floods is presented and risk implication for design of drainage structures assessed. A case study in light of the above has been considered at four ungauged sites in the Limpopo Drainage Basin in north-eastern Botswana.展开更多
The floods in river Mahanadi delta are due to either dam release of Hirakud or due to contribution of intercepted catchment between Hirakud dam and delta. It is seen from post-Hirakud periods (1958) that out of 19 flo...The floods in river Mahanadi delta are due to either dam release of Hirakud or due to contribution of intercepted catchment between Hirakud dam and delta. It is seen from post-Hirakud periods (1958) that out of 19 floods 14 are due to intercepted catchment contribution. The existing flood forecasting systems are mostly for upstream catchment, forecasting the inflow to reservoir, whereas the downstream catchment is devoid of a sound flood forecasting system. Therefore, in this study an attempt has been made to develop a workable forecasting system for downstream catchment. Instead of taking the flow time series concurrent flood peaks of 12 years of base and forecasting stations with its corresponding travel time are considered for analysis. Both statistical method and ANN based approach are considered for finding the peak to reach at delta head with its corresponding travel time. The travel time has been finalized adopting clustering techniques, there by differentiating high, medium and low peaks. The method is simple and it does not take into consideration the rainfall and other factors in the intercepted catchment. A comparison between both methods are tested and it is found that the ANN methods are better beyond the calibration range over statistical method and the efficiency of either methods reduces as the prediction reach is extended. However, it is able to give the peak discharge at delta head before 24 hour to 37 hour for high to low peaks.展开更多
文摘In flood control dams it is not only the failure to prevent flood larger than their design carrying capacity, but also the uncertainties of hydraulic factors that cause disasters. In general, the hydraulic risk is not considered in most of the hydrological analysis in floodproofing plan and design. In this paper, a method of evaluating the hydraulic risk is developed by employing risk theory, and the concept can easily be extended to other types of risk analysis. As a result, it is possible not to consider the hydraulic resks when the design hydrologic risk of flood control dam is lger. Otherwise, the hydraulic risks must be noticed. The research is very helpful for the development of the flood control theory used at present.
基金supported by the Tianjin Youth Research Program of Application Foundation and Advanced Technology (No. 15JCQNJC08000)the National Natural Science Foundation of China (No. 51509182)the Foundation for Innovative Research Groups of the National Natural Science Foundation of China (No. 51321065)
基金National Key R&D Program of China under Grant No.2016YFC0401705Science Fund for Creative Research Groups of the National Natural Science Foundation of China Grant No.51621092+3 种基金the National Natural Science Foundation of China Grant No.51579173,No.51379140,No.51309177 and No.51509180the Fund for Key Research Area Innovation Groups of China Ministry of Science and Technology Grant No.2014RA4031the Program of Introducing Talents of Discipline to Universities Grant No.B14012the Tianjin Innovation Team Foundation of Key Research Areas Grant No.2014TDA001
文摘According to theoretical analysis, a general characteristic of the ground vibration induced by high dam flood discharge is that the dominant frequency ranges over several narrow frequency bands, which is verified by observations from the Xiangjiaba Hydropower Station. Nonlinear base isolation is used to reduce the structure vibration under ground excitation and the advantage of the isolation application is that the low-frequency resonance problem does not need to be considered due to its excitation characteristics, which significantly facilitate the isolation design. In order to obtain the response probabilistic distribution of a nonlinear system, the state space split technique is modified. As only a few degrees of freedom are subjected to the random noise, the probabilistic distribution of the response without involving stochastic excitation is represented by the δ function. Then, the sampling property of the δ function is employed to reduce the dimension of the Fokker-Planck-Kolmogorov (FPK) equation and the low-dimensional FPK equation is solvable with existing methods. Numerical results indicate that the proposed approach is effective and accurate. Moreover, the response probabilistic distributions are more reasonable and scientific than the peak responses calculated by conventional time and frequency domain methods.
基金supported by the National Basic Research Program of China(973 Program,Grant No.2012CB417000)
文摘Full operation of the Three Gorges Dam(TGD) reduces flood risk of the middle and lower parts of the Yangtze River Basin. However,Dongting Lake, which is located in the Yangtze River Basin, is still at high risk for potentially severe flooding in the future. The effects of the TGD on flood processes were investigated using a hydrodynamic model. The 1998 and 2010 flood events before and after the operation of the TGD, respectively, were analyzed. The numerical results show that the operation of the TGD changes flood processes, including the timing and magnitude of flood peaks in Dongting Lake. The TGD can effectively reduce the flood level in Dongting Lake, which is mainly caused by the flood water from the upper reach of the Yangtze River. This is not the case, however, for floods mainly induced by flood water from four main rivers in the catchment. In view of this, a comprehensive strategy for flood management in Dongting Lake is required. Non-engineering measures, such as warning systems and combined operation of the TGD and other reservoirs in the catchment, as well as traditional engineering measures, should be further improved. Meanwhile, a sustainable philosophy for flood control, including natural flood management and lake restoration, is recommended to reduce the flood risk.
基金supported by the National Natural Science Foundation of China(Grants No.51569003 and 51579059)the Natural Science Foundation of Guangxi Province(Grant No.2017GXNSFAA198361)the Innovation Project of Guangxi Graduate Education(Grant No.YCSW2017052)
文摘Based on the natural disaster risk evaluation mode, a quantitative danger degree evaluation model was developed to evaluate the danger degree of earth dam reservoir staged operation in the flood season. A formula for the overtopping risk rate of the earth dam reservoir staged operation was established, with consideration of the joint effect of flood and wind waves in the flood sub-seasons with the Monte Carlo method, and the integrated overtopping risk rate for the whole flood season was obtained via the total probability approach. A composite normalized function was used to transform the dam overtopping risk rate into the danger degree, on a scale of 0-1. Danger degree gradating criteria were divided by four significant characteristic values of the dam overtopping rate, and corresponding guidelines for danger evaluation are explained in detail in this paper. Examples indicated that the dam overtopping danger degree of the Chengbihe Reservoir in China was 0.33-0.57, within the range of moderate danger level, and the flood-limiting water level (FLWL) can be adjusted to 185.00 m for the early and main flood seasons, and 185.00-187.50 m for the late flood season. The proposed quantitative model offers a theoretical basis for determination of the value of the danger degree of an earth dam reservoir under normal operation as well as the optimal scheduling scheme for the reservoir in each stage of the flood season.
文摘The possible mitigation of floods by dams and the risk to dams from floods are key problems. The People's Republic of China is now leading world dam construction with great success and efficiency. This paper is devoted to relevant experiences from other countries, with a particular focus on lessons from accidents over the past two centuries and on new solutions. Accidents from floods are analyzed according to the dam's height, storage, dam material, and spillway data. Most of the huge accidents that have been reported occurred for embankments storing over 10 hm3. New solutions appear promising for both dam safety and flood mitigation.
基金the financial support from the National Natural Science Foundation of China (Grant No. 41731283)the Key Research Program of Frontier Sciences, Chinese Academy of Sciences (CAS) (Grant No. QYZDB-SSW-DQC010)the Youth Innovation Promotion Association, Chinese Academy of Sciences (CAS)
文摘Accurate prediction of the hydrographs of outburst floods induced by landslide dam overtopping failure is necessary for hazard prevention and mitigation. In this study, flume model tests on the breaching of landslide dams were conducted. Unconsolidated soil materials with wide grain size distributions were used to construct the dam. The effects of different upstream inflow discharges and downstream bed soil erosion on the outburst peak discharge were investigated. Experimental results reveal that the whole hydrodynamic process of landslide dam breaching can be divided into three stages as defined by clear inflection points and peak discharges. The larger the inflow discharge, the shorter the time it takes to reach the peak discharge, and the larger the outburst flood peak discharge. The scale of the outburst floods was found to be amplified by the presence of an erodible bed located downstream of the landslide dam. This amplification decreases with the increase of upstream inflow. In addition, the results show that the existence of an erodible bed increases the density of the outburst flow, increasing its probability of transforming from a sediment flow to a debris flow.
基金funded by the National Key Technology Research and Development Programthe Key Basic Research Program of the Ministry of Science and Technology of China (2012BAC19B07, 2013FY111400)the National Natural Science Foundation of China (41190084)
文摘Glacial outburst floods(GLOFs) in alpine regions tend to be relatively complicated, multi-stage catastrophes, capable of causing significant geomorphologic changes in channel surroundings and posing severe threats to infrastructure and the safety and livelihoods of human communities. GLOF disasters have been observed and potential hazards can be foreseen due to the newly formed glacial lakes or the expansion of existing ones in the Poiqu River Basin in Tibet, China. Here we presented a synthesis of GLOF-related studies including triggering mechanism(s), dam breach modeling, and flood routing simulation that have been employed to reconstruct or forecast GLOF hydrographs. We provided a framework for probability-based GLOFs simulation and hazard mapping in the Poiqu River Basin according to available knowledge. We also discussed the uncertainties and challenges in the model chains, which may form the basis for further research.
基金supported by the National Basic Research Program of China(‘‘973’’Program,No.2013CB035906)Foundation for Innovative Research Groups of the National Natural Science Foundation of China(No.51621092)Heilongjiang Provincial Major Scientific and Technological Project of Applied Technology Research and Development Plan(No.GA14A501)
文摘Badush Dam is a partially completed dam and a unique case of flood retention dams. Its intended main function is to perform flood protection once in its lifetime;that is if Mosul Dam would collapse. In such a case, the Badush dam would temporarily store the whole flood wave and route it safely to the downstream. For this end, the bulk of the reservoir is left dry, while the remaining volume at the lower part which is intended for power generation does not give an economic justification for building the full height of the dam. The short duration of the intended use as a protection dam has led to relaxing many design assumptions which have raised concerns over the dam integrity. The current controversy rages now over whether to continue the construction of the dam as it was first designed or to change all that in view of the similar site geology of Mosul Dam. Mosul dam foundations suffer at the moment from the severe continuous dissolution of the soluble materials in its foundation leading to continued maintenance grouting of that foundation. This paper gives an overview of the history of Badush dam, its current design and what new requirements which are needed if it is to replace Mosul Dam itself.
文摘The analysis of the risk of flooding upstream from the Imboulou hydroelectric dam on the Léfini River in the Republic of Congo-Brazzaville, focused on the evolution of annual rainfall and flow in the study area during the period from 1970 to 2020 before and after the building of the dam in 2005, by applying statistical methods. These methods were used to analyse the spatial and temporal evolution of rainfall and flow at the unique hydrometric station located at the RN2 (National Road N°2) bridge in the village of Mbouambé in the Pool region. This work has shown that rainfall is not the cause of flooding in the Léfini catchment area. The monthly flow coefficient (MFC) showed exceptional flooding from November and December onwards after the dam was built, resulting in a variability of flows, with periods of high and low water. In addition, the annual average flow (AAF) and the maximum average flow (MAF) increased after the dam was built. Maximum average flows (MAF) were higher than annual average flows (AAF) throughout the period of study (1970-2020). The annual and monthly rainfall-runoff relationship showed changes after the dam was built, particularly from 2009 and during the months of November and December. .
基金supported by the Natural Science Research Project of the Colleges and Universities in Anhui Province(KJ2020ZD34)the National Natural Science Foundation of China(41807267 and 42077259).
文摘On August 10,2019,due to the effect of a rainstorm caused by Super Typhoon Lekima,a landslide occurred in Shanzao Village,China.It blocked the Shanzao stream,forming a barrier lake,and then the barrier lake burst.This is a rare natural disaster chain of typhoon-rainstorm-landslide-barrier lake-flooding.This study was built on field surveys,satellite image interpretation,the digital elevation model(DEM),engineering geological analysis and empirical regression.The purpose was to reveal the characteristics and causes of the landslide,the features and formation process of the barrier lake and the dam break flooding discharge.The results show that the volume of the landslide deposit is approximately 2.4×105 m3.The burst mode of the landslide dam is overtopping,which took only 22 minutes from the formation of the landslide dam to its overtopping.The dam-break peak flow was 1353 m3/s,and the average velocity was 2.8–3.0 m/s.This study shows that the strongly weathered rock and soil slope has low strength and high permeability under the condition of heavy rainfall,which reminds us the high risk of landslides and the importance of accurate early warning of landslides under heavy rainfalls in densely populated areas of Southeast China,as well as the severity of the disaster chain of typhoon-rainstorm-landslide-barrier lake-flooding.
基金supported by the National Natural Science Foundation of China (Grant No 50609005)the Science Foundation of Guangxi Education Department (Grant No 200708LX099)the Science Foundation of Guangxi University (Grant No X071096)
文摘In this paper, a model of overtopping risk under the joint effects of floods and wind waves, which is based on risk analysis theory and takes into account the uncertainties of floods, wind waves, reservoir capacity and discharge capacity of the spillway, is proposed and applied to the Chengbihe Reservoir in Baise City in Guangxi Zhuang Autonomous Region. The simulated results indicate that the flood control limiting level can be raised by 0.40 m under the condition that the reservoir overtopping risk is controlled within a mean variance of 5×10-6. As a result, the reservoir storage will increase to 16 million m3 and electrical energy generation and other functions of the reservoir will also increase greatly.
文摘Mosul Dam is an earth fill dam located on the Tigris River in North Western part of Iraq. It is 113 m in height, 3.4 km in length, 10 m wide in its crest and has a storage capacity of 11.11 billion cubic meters. It is, constructed on bedrocks which consist of gypsum beds alternated with marl and limestone, in cyclic nature. The thickness of the gypsum beds attains 18 m;they are intensely karstified even in foundation rocks. This has created number of problems during construction, impounding and operation of the dam. Construction work in Mosul Dam started on January 25th, 1981 and started operating on 24th July, 1986. After impounding in 1986, seepage locations were recognized. The cause of seepage is mainly due to: 1) The karsts prevailing in the dam site and in the reservoir area. 2) The existence of gypsum/anhydrite rock formations in the dam foundation alternating with soft marl layers and weathered and cavernous limestone beddings. 3) The presence of an extensive ground water aquifer called Wadi Malleh aquifer, which affects considerably the ground water regime in the right bank. The dissolution intensity of the gypsum/anhydrite ranged from 42 to 80 t/day which was followed by a noticeable increase in the permeability and leakages through the foundation. Inspection of the dam situation in 2014 and 2015 indicates that the dam is in a state of extreme unprecedentedly high relative risk. In this work, possible solutions to the problem are to be discussed. It is believed that grouting operations will elongate the span life of the dam but do not solve the problem. Building another dam downstream Mosul Dam will be the best protective measures due to the possible failure of Mosul Dam, to secure the safety of the downstream area and its’ population.
文摘The Sahelian regions have experienced a drought that has made them vulnerable to hydro-climatic conditions. Strategies have been developed to re</span><span style="font-family:Verdana;">duce this vulnerability. The governments of Senegal, Mauritania, Mali and Guinea</span><span style="font-family:Verdana;"> have created the Organization for the development of the Senegal River (OMVS in french) with the aim of realizing large hydraulic installations. This resulted in the construction of the Diama and Manantali dams in the Senegal River Basin. The first aims to stop the saline intrusion, the second to regulate the flow of the river, to allow the irrigation of agricultural perimeters, and to produce electrical energy. The impoundment of the Diama dam has modified the hydraulic behavior of the estuary. The purpose of this study is to carry out </span><span style="font-family:Verdana;">the hydraulic modeling of the estuary of Senegal river downstream of the Diama Dam in transient mode by the HEC-RAS software. Two geometric models were </span><span style="font-family:Verdana;">constructed on the basis of a digital terrain model (DTM) using the Arc-GIS and HEC GeoRAS soft wares after processing the collected topographic data. The first geometric model, of which the areas of Senegal river downstream Diama Dam have been represented by cross-section, is one-dimensional. The </span><span style="font-family:Verdana;">second one is also one dimensional;in this model, the area of the Senegal River </span><span style="font-family:Verdana;">estuary downstream Diama Dam is introduced as water storage zones. The components of these models are the stream sections, lateral links, and storage areas. The flood hydrograph downstream Diama Dam is introduced as conditions at the upstream limits of the models while the tidal is introduced as a downstream condition. After the stability and calibration, the results given by HEC-RAS simulations are the variations of the water levels, the temporal variations of the flow rates for each section, the maximum flow velocities and the propagation times of the flood waves. The analysis and comparisons of these results strongly suggest using HEC-RAS issues as a decision-making tool helping to manage floods during times of crisis.
文摘Most planned developments in a catchment for control of excess water using a culvert, bridge or dam spillway are located at a site in a stream where there are no discharge measurements. Even though, for gauged catchments a number of established flood frequency models and rainfall-runoff models do exist, for ungauged catchments mostly regional flood frequency and event-based rainfall-runoff models are used, which depend on regional parameters. In this paper, a regional approach for design floods is presented and risk implication for design of drainage structures assessed. A case study in light of the above has been considered at four ungauged sites in the Limpopo Drainage Basin in north-eastern Botswana.
文摘The floods in river Mahanadi delta are due to either dam release of Hirakud or due to contribution of intercepted catchment between Hirakud dam and delta. It is seen from post-Hirakud periods (1958) that out of 19 floods 14 are due to intercepted catchment contribution. The existing flood forecasting systems are mostly for upstream catchment, forecasting the inflow to reservoir, whereas the downstream catchment is devoid of a sound flood forecasting system. Therefore, in this study an attempt has been made to develop a workable forecasting system for downstream catchment. Instead of taking the flow time series concurrent flood peaks of 12 years of base and forecasting stations with its corresponding travel time are considered for analysis. Both statistical method and ANN based approach are considered for finding the peak to reach at delta head with its corresponding travel time. The travel time has been finalized adopting clustering techniques, there by differentiating high, medium and low peaks. The method is simple and it does not take into consideration the rainfall and other factors in the intercepted catchment. A comparison between both methods are tested and it is found that the ANN methods are better beyond the calibration range over statistical method and the efficiency of either methods reduces as the prediction reach is extended. However, it is able to give the peak discharge at delta head before 24 hour to 37 hour for high to low peaks.