In view of the rapid decline rate of oil production and gradual increase of water cut in oil wells in Block S, based on the determination of the formula of foam profile control agent, the optimization study of foam pr...In view of the rapid decline rate of oil production and gradual increase of water cut in oil wells in Block S, based on the determination of the formula of foam profile control agent, the optimization study of foam profile control injection scheme was carried out. Petrel software is used to establish a facies controlled geological model based on stochastic modeling method in Block S, and CMG software is used for numerical simulation to design 7 sets of foam profile control prediction schemes. Dynamic data and numerical simulation methods are used to optimize foam injection mode and injection cycle. By simulating and calculating, the optimal injection method of alternating gas and liquid injection and the optimal plan with an injection period of 2 months were selected. Through the calculation results of various research plans, it can be seen that the water content of the optimal plan has decreased significantly, and the oil production rate has increased significantly, in order to slow down production decline, control water content rise, extend the economic recovery period of the oilfield, and achieve the goal of improving oil recovery.展开更多
文摘In view of the rapid decline rate of oil production and gradual increase of water cut in oil wells in Block S, based on the determination of the formula of foam profile control agent, the optimization study of foam profile control injection scheme was carried out. Petrel software is used to establish a facies controlled geological model based on stochastic modeling method in Block S, and CMG software is used for numerical simulation to design 7 sets of foam profile control prediction schemes. Dynamic data and numerical simulation methods are used to optimize foam injection mode and injection cycle. By simulating and calculating, the optimal injection method of alternating gas and liquid injection and the optimal plan with an injection period of 2 months were selected. Through the calculation results of various research plans, it can be seen that the water content of the optimal plan has decreased significantly, and the oil production rate has increased significantly, in order to slow down production decline, control water content rise, extend the economic recovery period of the oilfield, and achieve the goal of improving oil recovery.