For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitorin...For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitoring sensors are employed in a majority of engineering projects. These sensors are used to monitor the project during the dam construction and operation periods, and play an important role in reservoir safety operation and producing benefits. With the changing of operating environments and run-time of projects, there are some factors affecting the operation and management of projects, such as a certain amount of damaged sensors and instability of the measured data. Therefore, it is urgent to evaluate existing safety monitoring sensors in water conservancy and hydropower engineering projects. However, there are neither standards nor evaluation guidelines at present. Based on engineering practice, this study examined some key techniques for the evaluation of safety monitoring sensors, including the evaluation process of the safety monitoring system, on-site detection methods of two typical pieces of equipment, the differential resistor sensor and vibrating wire sensor, the on-site detection methods of communication cable faults, and a validity test of the sensor measured data. These key techniques were applied in the Xiaolangdi Water Control Project and Xiaoxi Hydropower Project. The results show that the measured data of a majority of sensors are reliable and reasonable, and can reasonably reflect the structural change behavior in the project operating process, indicating that the availabilities of the safety monitoring sensors of the two projects are high展开更多
Hydrological data on the Upper Qingjiang River from 1960 to 2012 document trends of runoff caused by hydropower engineering projects and long-term changes in rainfall. Annual runoff correlates strongly with annual pre...Hydrological data on the Upper Qingjiang River from 1960 to 2012 document trends of runoff caused by hydropower engineering projects and long-term changes in rainfall. Annual runoff correlates strongly with annual precipitation, but is significantly reduced after reservoir construction compared to earlier values. Comparisons of intense, pre- and post-construction rainfall events suggest that the Chebahe and Dalongtan reservoir projects respectively clips the magnitude of the flood peaks and delays runoff delivery.展开更多
基金supported by the National Natural Science Foundation of China(Grants No.51179108and50909066)the Key Research Foundation of Nanjing Hydraulic Research Institute(Grant No.Y711007)
文摘For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitoring sensors are employed in a majority of engineering projects. These sensors are used to monitor the project during the dam construction and operation periods, and play an important role in reservoir safety operation and producing benefits. With the changing of operating environments and run-time of projects, there are some factors affecting the operation and management of projects, such as a certain amount of damaged sensors and instability of the measured data. Therefore, it is urgent to evaluate existing safety monitoring sensors in water conservancy and hydropower engineering projects. However, there are neither standards nor evaluation guidelines at present. Based on engineering practice, this study examined some key techniques for the evaluation of safety monitoring sensors, including the evaluation process of the safety monitoring system, on-site detection methods of two typical pieces of equipment, the differential resistor sensor and vibrating wire sensor, the on-site detection methods of communication cable faults, and a validity test of the sensor measured data. These key techniques were applied in the Xiaolangdi Water Control Project and Xiaoxi Hydropower Project. The results show that the measured data of a majority of sensors are reliable and reasonable, and can reasonably reflect the structural change behavior in the project operating process, indicating that the availabilities of the safety monitoring sensors of the two projects are high
基金supported by the National Natural Science Foundation of China (No. 31460132)the Scientific Research Project of Hubei Provincial Department of Education (No. Q20122901)
文摘Hydrological data on the Upper Qingjiang River from 1960 to 2012 document trends of runoff caused by hydropower engineering projects and long-term changes in rainfall. Annual runoff correlates strongly with annual precipitation, but is significantly reduced after reservoir construction compared to earlier values. Comparisons of intense, pre- and post-construction rainfall events suggest that the Chebahe and Dalongtan reservoir projects respectively clips the magnitude of the flood peaks and delays runoff delivery.