Study on Deep Well Dewatering Optimization Design in Deep Foundation Pit and Engineering Application 被引量:6
1
作者 Hu Chunlin Yang HuijunInstitute of Rock and Soil Engineering , Wuhan University of Technology , Wuhan 430070 《Journal of China University of Geosciences》 SCIE CSCD 2002年第1期78-82,共5页
Based on analyses of the theories of groundwater unsteady flow in deep well dewatering in the deep foundation pit, Theis equations are chosen to calculate and analyze the relationship between water level drawdown of c... Based on analyses of the theories of groundwater unsteady flow in deep well dewatering in the deep foundation pit, Theis equations are chosen to calculate and analyze the relationship between water level drawdown of confined aquifer and dewatering duration. In order to reduce engineering cost and diminish detrimental effect on ambient surrounding, optimization design target function based on the control of confined water drawdown and four restriction requisitions based on the control of safe water level, resistance to throwing up from the bottom of foundation pit, avoiding excessively great subsidence and unequal surface subsidence are proposed. A deep well dewatering project in the deep foundation pit is optimally designed. The calculated results including confined water level drawdown and surface subsidence are in close agreement with the measured results, and the optimization design can effectively control both surface subsidence outside foundation pit and unequal subsidence as a result of dewatering. 展开更多
关键词 deep foundation pit deep well dewatering DRAWDOWN surface subsidence optimization design.
下载PDF
Optimization of dewatering schemes for a deep foundation pit near the Yangtze River, China 被引量:3
2
作者 Yang You Changhong Yan +2 位作者 Baotian Xu Shi Liu Canhui Che 《Journal of Rock Mechanics and Geotechnical Engineering》 CSCD 2018年第3期555-566,共12页
A deep foundation pit constructed for an underground transportation hub was excavated near the Yangtze River. Among the strata, there are two confined aquifers, between which lies an aquiclude that is partially missin... A deep foundation pit constructed for an underground transportation hub was excavated near the Yangtze River. Among the strata, there are two confined aquifers, between which lies an aquiclude that is partially missing. To guarantee the safety of pit excavation, the piezometric head of the upper confined aquifer, where the pit bottom is located, should be 1 m below the pit bottom, while that of the lower confined aquifer should be dewatered down to a safe water level to avoid uplift problem. The Yangtze River levee is notably close to the pit, and its deformation caused by dewatering should be controlled. A pumping test was performed to obtain the hydraulic conductivity of the upper confined aquifer. The average value of the hydraulic conductivity obtained from analytical calculation is 20.45 m/d, which is larger than the values from numerical simulation(horizontal hydraulic conductivity K_H = 16 m/d and vertical hydraulic conductivity K_V = S m/d). The difference between K_H and K_V indicates the anisotropy of the aquifer. Two dewatering schemes were designed for the construction and simulated by the numerical models for comparison purposes. The results show that though the first scheme could meet the dewatering requirements, the largest accumulated settlement and differential settlement would be94.64 mm and 3.3‰, respectively, greatly exceeding the limited values. Meanwhile, the second scheme,in which the bottoms of the waterproof curtains in ramp B and the river side of ramp A are installed at a deeper elevation of-28 m above sea level, and 27 recharge wells are set along the levee, can control the deformation of the levee significantly. 展开更多
关键词 Deep foundation pit Parameter calculation dewatering schemes Numerical simulation
下载PDF
Numerical simulation and land subsidence control for deep foundation pit dewatering of Longyang Road Station on Shanghai Metro Line 18 被引量:1
3
作者 LI Wen-yong FU Li ZHU Zheng-feng 《Journal of Groundwater Science and Engineering》 2019年第2期133-144,共12页
In terms of controlling groundwater in deep foundation pit projects, the usual methods include increasing the curtain depth, reducing the amount of pumped groundwater, and implementing integrated control, in order to ... In terms of controlling groundwater in deep foundation pit projects, the usual methods include increasing the curtain depth, reducing the amount of pumped groundwater, and implementing integrated control, in order to reduce the drawdown and land subsidence outside pits. In dewatering design for confined water, factors including drawdown requirements, the thickness of aquifers, the depth of dewatering wells and the depth of cutoff curtains have to be considered comprehensively and numerical simulations are generally conducted for calculation and analysis. Longyang Road Station on Shanghai Metro Line 18 is taken as the case study subject in this paper, a groundwater seepage model is developed according to the on-site engineering geological conditions and hydrogeological conditions, the excavation depth of the foundation pit as well as the design depth of the enclosure, hydrogeological parameters are determined via the pumping test, and the foundation pit dewatering is simulated by means of the three-dimensional finite difference method, which produces numerical results that consistent with real monitoring data as to the groundwater table. Besides, the drawdown and the land subsidence both inside and outside the pit caused by foundation pit dewatering are calculated and analyzed for various curtain depths. This study reveals that the drawdown and the land subsidence change faster near the curtain with the increase in the curtain depth, and the gradient of drawdown and land subsidence changes dwindles beyond certain depths. In this project, the curtain depth of 47/49 m is adopted, and a drawdown-land subsidence verification test is completed given hanging curtains before the excavation. The result turns out that the real measurements basically match the calculation results from the numerical simulation, and by increasing the depth of curtains, the land subsidence resulting from dewatering is effectively controlled. 展开更多
关键词 Deep foundation pit Engineering dewatering Numerical simulation GROUNDWATER Land SUBSIDENCE Verification test
下载PDF
Sensor monitoring of a newly designed foundation pit supporting structure 被引量:3
4
作者 杨宇友 吕建国 +1 位作者 黄学刚 涂晓明 《Journal of Central South University》 SCIE EI CAS 2013年第4期1064-1070,共7页
A new type of pit supporting structure, which was tested and verified using the sensor monitoring technology, was presented. The new supporting structure is assembled by prefabricated steel structural units. The adjac... A new type of pit supporting structure, which was tested and verified using the sensor monitoring technology, was presented. The new supporting structure is assembled by prefabricated steel structural units. The adjacent steel structural units are jointed with fasteners, and each steel structural unit has a certain radian and is welded by two steel tubes and one piece of steel disc. In order to test and verify the reliability of the new supporting structure, the field tests are designed. The main monitoring programs include the hoop stress of supporting structure, lateral earth pressure, and soil deformation. The monitoring data of the field tests show that the new supporting structure is convenient, reliable and safe. 展开更多
关键词 基坑支护结构 监测技术 传感器 设计 支撑结构 现场测试 结构单元 侧向土压力
下载PDF
Foundation pit dewatering optimization design based on GMW-2005 and LGR technique
5
作者 HUANG Shan-shan JIANG Si-min +2 位作者 ZHANG Rui-cheng ZHANG Shi-rong ZHANG Wen 《Journal of Groundwater Science and Engineering》 2018年第3期234-242,共9页
The slope instability and uneven settlement caused by the foundation pit dewatering pose a great threat to the project and surrounding environment.Thus,it is necessary to carry out optimization design of the foundatio... The slope instability and uneven settlement caused by the foundation pit dewatering pose a great threat to the project and surrounding environment.Thus,it is necessary to carry out optimization design of the foundation pit dewatering project.To solve this problem,this paper introduces the simulation-optimization method and establishes the groundwater model based on MODFLOW-2005.The local grid refinement(LGR)technique is employed to achieve the refinement of dewatering area.Under the premise of construction safety,the minimum cost of the project is set as the objective function to solve the optimization problem of foundation pit engineering with GWM-2005.The results show that the optimization with GWM-2005 will be more accurate combined with the LGR model,but the improvement of the optimization is not obvious.It is necessary to choose a suitable local refinement model considering the engineering requirement. 展开更多
关键词 foundation pit dewatering Simulation-optimization model Response MATRIX Method GWM-2005 Local GRID refinement(LGR)
下载PDF
The Effection Analysis of Geotechnical Investigation on Foundation Pit Supporting Construction
6
作者 Weiwei Xu 《Frontiers Research of Architecture and Engineering》 2021年第1期26-31,共6页
With the continuous development of the construction industry,the density of engineering construction and the difficulty of underground construction are also increasing.As an important construction protection measure,f... With the continuous development of the construction industry,the density of engineering construction and the difficulty of underground construction are also increasing.As an important construction protection measure,foundation pit support construction is widely used in underground construction.Starting from the characteristics of foundation pit support construction,this paper analyzes the influence of geotechnical investigation on foundation pit support construction,and analyzes the problems that need to be paid attention to in the survey process. 展开更多
关键词 Geotechnical investigation foundation pit support Construction effect
下载PDF
FINITE ELEMENT NUMERICAL SIMULATION OF THREE-DIMENSIONAL SEEPAGE CONTROL FOR DEEP FOUNDATION PIT DEWATERING 被引量:42
7
作者 LUO Zu-jiang ZHANG Ying-ying WU Yong-xia 《Journal of Hydrodynamics》 SCIE EI CSCD 2008年第5期596-602,共7页
For deep foundation pit dewatering in the Yangtze River Delta, it is easy to make a dramatic decrease of the underground water level surrounding the dewatering area and cause land subsidence and geologic disasters. In... For deep foundation pit dewatering in the Yangtze River Delta, it is easy to make a dramatic decrease of the underground water level surrounding the dewatering area and cause land subsidence and geologic disasters. In this work, a three-dimensional finite element simulation method was applied in the forth subway of Dongjiadu tunnel repair foundation pit dewatering in Shanghai. In order to control the decrease of the underground water level around the foundation pit, the foundation pit dewatering method was used to design the optimization project of dewatering ,which was simulated under these conditions that the aquifers deposited layer by layer, the bottom of the aquifers went deep to 144.45 m, the retaining wall of foundation pit shield went deep to 65 m, the filters of the extraction wells were located between 44 m to 59 m, the water level in the deep foundation pit was decreased by 34 m, and the maximum decrease of water level outside the foundation pit was 3 m. It is shown that the optimization project and the practical case are consistent with each other. Accordingly, the three-dimensional finite element numerical simulation is the basic theory of optimization design of engineering structures of dewatering in deep foundation pit in such areas. 展开更多
关键词 Yangtze River Delta land subsidence deep foundation pit dewatering seepage control
原文传递
Construction Technology of Deep Foundation Pit Support in Municipal Civil Engineering Foundation Construction
8
作者 Jun Huang 《Journal of Architectural Research and Development》 2023年第5期20-26,共7页
Municipal civil engineering is the key content of municipal construction,and the construction scale is usually large.The quality of the project plays an important role in the development of urban economy.Due to the ra... Municipal civil engineering is the key content of municipal construction,and the construction scale is usually large.The quality of the project plays an important role in the development of urban economy.Due to the rapid increase of high-rise buildings,skyscrapers and underground buildings,the construction technology of deep foundation pit support has gradually become an indispensable construction technology.Therefore,the selection of foundation pit support construction technology is crucial in ensuring that whether the foundation is firm and stable,and whether the subsequent construction activities can be carried out smoothly.In view of this,the article discusses the application of deep foundation pit support construction technology in municipal civil engineering,aiming to provide reference for subsequent projects. 展开更多
关键词 Deep foundation pit support Civil engineering foundation construction Concrete pouring pile technology Row pile support technology
下载PDF
深基坑支护理念演进和设计方法改进剖析 被引量:2
9
作者 李连祥 侯颖雪 +2 位作者 陈天宇 邢宏侠 贾斌 《建筑结构》 北大核心 2024年第13期126-132,共7页
基于我国30多年建设实践,分析现有深基坑支护临时性理念、与主体结构相结合理念实施的优点和不足,提出促进基坑支护工程高质量发展的永久化理念。结合济南某基坑工程,阐释三个理念的逐次提升和相应支护结构的计算内容,定义适应与主体结... 基于我国30多年建设实践,分析现有深基坑支护临时性理念、与主体结构相结合理念实施的优点和不足,提出促进基坑支护工程高质量发展的永久化理念。结合济南某基坑工程,阐释三个理念的逐次提升和相应支护结构的计算内容,定义适应与主体结构相结合理念、永久化理念的结构岩土化、岩土结构化设计方法;重点分析土钉墙与抗浮锚杆相结合的复合土钉墙的设计,以及抗浮锚杆与外伸支撑、水平楼板永久支护结构中抗浮锚杆的力学性状与耐久性,分析了永久支护对于地下室外墙受力机制的影响,阐释深基坑支护理念演化方向和与之适应的设计改进内容。对于反思我国岩土与结构设计管理体制,促进基坑与基础设计理论和方法进步,推动“新发展理念”在基坑工程的实践具有导向价值。 展开更多
关键词 基坑工程 深基坑支护理念 结构岩土化 岩土结构化 永久支护结构 复合土钉墙
下载PDF
深基坑岩土结构化永久支护理论与设计方法 被引量:1
10
作者 李连祥 李胜群 +2 位作者 邢宏侠 侯颖雪 韩志霄 《建筑结构》 北大核心 2024年第13期133-140,共8页
基于对项目地下系统设计现状的深入剖析,指出岩土与结构专业分离造成基坑临时支护资源浪费、环境污染、碳排放增加等弊病,提出深基坑岩土结构化永久支护体系理论与设计方法。阐明了永久支护体系构件组成与构造过程,给出了永久支护体系... 基于对项目地下系统设计现状的深入剖析,指出岩土与结构专业分离造成基坑临时支护资源浪费、环境污染、碳排放增加等弊病,提出深基坑岩土结构化永久支护体系理论与设计方法。阐明了永久支护体系构件组成与构造过程,给出了永久支护体系承载能力极限状态和正常使用极限状态设计原则;明确了基坑开挖、构建和正常使用三个阶段的荷载组合和计算内容,建议了深、较深基坑划分界限及其永久支护结构分别适用的有限元法和弹性支点法;强调应进行支护构件的耐久性分析,证明了岩土结构化深基坑永久支护结构地下室外墙基本不承担土压力,改变了目前开挖阶段支护结构、使用阶段地下室外墙分别承担土压力即两倍建筑材料抵挡土压力的现状,显示了深基坑永久支护结构的工程价值及其推广的意义。 展开更多
关键词 深基坑 岩土结构化 永久支护结构 耐久性
下载PDF
基于长春某工程在基坑降水引发地面沉降方面的影响分析 被引量:1
11
作者 吴银柱 瞿大卫 《科学技术创新》 2024年第1期138-142,共5页
本文以长春某基坑实际工程为背景,通过Midas GTS NX软件对基坑内的降水状况进行了模拟,得出施工的降水阶段对周边地表环境及支护结构的变形影响规律。结果表明,降水过程对周边地表造成的沉降作用以降水井为中心,呈降水漏斗状曲线,沉降... 本文以长春某基坑实际工程为背景,通过Midas GTS NX软件对基坑内的降水状况进行了模拟,得出施工的降水阶段对周边地表环境及支护结构的变形影响规律。结果表明,降水过程对周边地表造成的沉降作用以降水井为中心,呈降水漏斗状曲线,沉降最大值出现在降水井附近,对支护结构产生变形作用的最大值出现在桩顶,随桩体深度的下降呈下降曲线,分层降水对控制地表沉降可以起到良好的作用。 展开更多
关键词 基坑施工 降水井 地表沉降
下载PDF
开挖顺序及内支撑早期刚度对软土基坑稳定性影响规律
12
作者 管大刚 胡志明 +3 位作者 郑鹏鹏 袁山 陈保国 张艳林 《建筑科学与工程学报》 CAS 北大核心 2024年第2期181-190,共10页
深基坑开挖变形控制是软土基坑工程的难题,工程中常采用密集的混凝土内支撑来提高支撑刚度,然而实际工程中未能合理考虑软土深基坑的开挖顺序和混凝土内支撑早期刚度影响,往往导致基坑实际变形远大于设计值。结合珠三角水资源配置工程... 深基坑开挖变形控制是软土基坑工程的难题,工程中常采用密集的混凝土内支撑来提高支撑刚度,然而实际工程中未能合理考虑软土深基坑的开挖顺序和混凝土内支撑早期刚度影响,往往导致基坑实际变形远大于设计值。结合珠三角水资源配置工程的软土深基坑,利用验证后的数值模拟方法研究了不同开挖顺序及混凝土内支撑早期刚度对基坑受力和变形特性的影响规律,得出了分层分区非对称开挖和对称开挖对地连墙水平位移和地表沉降的影响规律。结果表明:尽管非对称开挖会造成基坑两侧的地连墙位移和地表沉降差异,但是密集内支撑条件下非对称开挖比对称开挖对于基坑周围地表沉降和地连墙水平位移影响更小并能够大量节约工期;受混凝土内支撑早期刚度影响,施作内支撑后越早进入下一步开挖,地连墙水平位移和周围地表沉降越大;考虑内支撑早期刚度影响时基坑上部的内支撑轴力会增大,而下部的内支撑轴力会减小,早期刚度越小,这种趋势越明显;现场施工时难以实时动态监测混凝土的弹性模量,极易造成内支撑轴力的早期监测数据失真,甚至给工程带来错误决策。 展开更多
关键词 深基坑 软土 开挖顺序 混凝土内支撑 早期刚度 变形特性
下载PDF
深基坑双排微型桩-锚-撑组合支护结构受力与变形特性
13
作者 闫楠 郝增明 +3 位作者 白晓宇 张立 孙林娜 张启军 《中南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2024年第6期2295-2309,共15页
为深入研究深厚杂填土地层深基坑微型桩-锚-撑组合支护结构随基坑开挖的受力与变形演化规律,首先,依托青岛市某深基坑工程开展双排微型桩-锚-撑原位试验,分析开挖工况下前、后排桩的桩身弯矩分布规律;然后,结合ABAQUS有限元模拟方法,明... 为深入研究深厚杂填土地层深基坑微型桩-锚-撑组合支护结构随基坑开挖的受力与变形演化规律,首先,依托青岛市某深基坑工程开展双排微型桩-锚-撑原位试验,分析开挖工况下前、后排桩的桩身弯矩分布规律;然后,结合ABAQUS有限元模拟方法,明确微型桩、预应力锚索与钢支撑之间的协同作用及基坑变形规律;最后,揭示微型桩桩径变化、支护结构作用对桩身受力及基坑变形的影响机制。研究结果表明:增加开挖深度引起桩身正弯矩和负弯矩不断增大,极值点位置不断下移,桩身弯矩整体呈正“S”形分布;开挖至基底,前排桩的桩身反弯点分别位于钢支撑下方0.5 m和开挖面位置,后排桩的桩身反弯点分别位于钢支撑下方0.5 m和开挖面下方1.0 m范围内;基坑开挖竖向影响范围约为1.35H(H为基坑开挖深度),桩径增加近1倍,土体水平位移仅减少约51%,且随桩径继续增加,其对于限制基坑变形效果不显著;相较于桩锚支护结构,桩-锚-撑支护结构作用下,前、后排桩的最大水平位移分别减小34.9%和27.3%,基坑土体的最大水平位移减小46.0%。 展开更多
关键词 深基坑 微型桩 锚索 钢支撑 原位试验 有限元模拟
下载PDF
基坑开挖导致邻近既有隧道变形的主动控制研究
14
作者 苏栋 张小妹 +2 位作者 张国涛 雷国平 陈湘生 《建筑科学与工程学报》 CAS 北大核心 2024年第4期130-138,共9页
采用有限元分析方法对新型支撑轴力主动控制系统进行了研究,提出了一种支撑轴力设计方法;在对支撑不施加主动轴力的情况下,研究了花岗岩残积土地层中基坑开挖对既有隧道的影响,根据基坑侧边不同位置隧道在基坑开挖作用下的位移划分了基... 采用有限元分析方法对新型支撑轴力主动控制系统进行了研究,提出了一种支撑轴力设计方法;在对支撑不施加主动轴力的情况下,研究了花岗岩残积土地层中基坑开挖对既有隧道的影响,根据基坑侧边不同位置隧道在基坑开挖作用下的位移划分了基坑开挖影响区;基于提出的轴力设计方法,研究了基坑开挖过程中支撑轴力主动控制对既有隧道位移的影响规律;获得了隧道位移控制到预警值10 mm以下的临界控制比,分析了其在不同隧道位置时的分布规律。结果表明:该地层中的影响区范围相对已有研究的影响区更小;隧道位移与地连墙位移的控制比近似呈正比关系;基坑腰部0.6倍挖深位置附近隧道的水平位移需进行最严格的控制,靠近基坑且深度较深的区域通过水平位移控制得到的临界控制比更小,应以隧道水平位移控制为主,而远离基坑且深度较浅的区域应以隧道竖向位移控制为主;花岗岩残积土中的基坑开挖影响区以及对临界控制比的量化研究成果可为类似工程提供参考。 展开更多
关键词 基坑 隧道位移 支撑轴力 主动控制系统
下载PDF
盾构机始发井深基坑力学和变形特性离心模型试验研究
15
作者 孙慧 李波 +1 位作者 王志鹏 王帅 《岩土工程学报》 EI CAS CSCD 北大核心 2024年第S01期244-248,共5页
为探究盾构机始发井深基坑开挖过程中周边土体的应力、变形和土压力分布规律,通过对工程原型进行概化,在典型土层条件下,采用停机-开挖-支护的模拟方式开展了方形基坑和圆形基坑两种方案共2组离心模型试验,从地连墙的弯矩和其后土体的... 为探究盾构机始发井深基坑开挖过程中周边土体的应力、变形和土压力分布规律,通过对工程原型进行概化,在典型土层条件下,采用停机-开挖-支护的模拟方式开展了方形基坑和圆形基坑两种方案共2组离心模型试验,从地连墙的弯矩和其后土体的水平位移、基坑外侧土压力分布以及地表沉降等角度,对比分析了两种盾构机始发井深基坑开挖过程的工程特性。结果表明:地面沉降随基坑开挖深度增大逐渐增加,形成沉降槽状;地连墙土压力变化呈非线性,随着基坑开挖不断深入的,离地表较近处的土压力逐渐变大,而深处的土压力则逐渐减小;在第5步开挖时2组模型地下连续墙水平位移均达到最大值,圆形基坑是方形基坑的1.4倍,同时地连墙的弯矩也达到最大值,圆形基坑比方形基坑小320 kN·m。研究成果可为深埋隧道深基坑的优化设计和开挖提供指导。 展开更多
关键词 盾构机始发井 深基坑 支护结构 离心模型 变形 弯矩 土压力
下载PDF
高边坡下方管廊基坑支护设计方案比选
16
作者 欧孝夺 梁枫 +1 位作者 江杰 白露 《工程勘察》 2024年第4期1-6,12,共7页
人工填土高边坡的坡体稳定性差,因其土体未经压实,开挖极易引起坍塌,对周边建(构)筑物的基坑开挖产生严重的安全隐患。根据人工填土高边坡下南宁凤岭管廊基坑开挖的工程地质条件,分析了基坑设计的难点。对钻孔灌注桩、SMW工法桩、钢板桩... 人工填土高边坡的坡体稳定性差,因其土体未经压实,开挖极易引起坍塌,对周边建(构)筑物的基坑开挖产生严重的安全隐患。根据人工填土高边坡下南宁凤岭管廊基坑开挖的工程地质条件,分析了基坑设计的难点。对钻孔灌注桩、SMW工法桩、钢板桩3种管廊基坑常用的支护形式进行了对比,在综合考虑整体刚度和强度、基坑安全性、费用、施工速度等因素后,最终确定采用具有降低施工成本、可对施工材料重复利用、地下空间资源污染低的SMW工法桩作为该基坑的最佳支护方案。此方案可对今后类似工程的设计施工提供借鉴和参考。 展开更多
关键词 基坑支护 方案比选 高边坡 管廊
下载PDF
成都地铁基坑围护桩大变形原因分析及对策研究
17
作者 李雪 耿凤娟 +2 位作者 赵卫星 李方利 蒋媛 《城市轨道交通研究》 北大核心 2024年第1期50-54,60,共6页
[目的]周边环境及地质条件复杂的地铁基坑施工稍有不慎易导致基坑事故的发生。需分析基坑围护桩大变形原因,并提出针对性加固措施。[方法]以成都某近接老旧建筑物的桩锚支护结构地铁车站基坑为工程背景,分析了基坑施工过程中围护桩体发... [目的]周边环境及地质条件复杂的地铁基坑施工稍有不慎易导致基坑事故的发生。需分析基坑围护桩大变形原因,并提出针对性加固措施。[方法]以成都某近接老旧建筑物的桩锚支护结构地铁车站基坑为工程背景,分析了基坑施工过程中围护桩体发生大变形的原因,提出控制围护桩变形的加固措施。通过Harding-soil二阶高级本构模型研究了围护桩发生变形后,坑内采用反压堆载、基坑坑外坡体采用钢管桩及再次开挖前加强两道锚索措施的可行性。[结果及结论]模拟计算结果及现场实测结果表明,围护桩累计位移为77.77 mm;围护桩产生大变形后采用加固措施,可将围护桩水平位移控制在53 mm以内;根据模拟计算结果及现场实测结果,二者桩体水平位移曲线变化规律一致。实际施工结果表明,采取加固措施后,基坑变形控制效果明显,后续施工过程中未发生大范围变形。 展开更多
关键词 地铁 基坑工程 围护桩变形 桩锚支护
下载PDF
深基坑桩-撑-土组合支护结构的受力特性与优化设计
18
作者 林宇亮 程勇 +4 位作者 刘玮 王斌 高文慧 李柔锋 李志宏 《中南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2024年第6期2162-2174,共13页
依托某高层建筑深基坑工程,通过现场试验获得不同施工阶段组合支护结构及基坑关键部位的变形规律。基于土体硬化模型建立深基坑组合支护体系的三维数值模型,对基坑开挖施工进行全过程模拟,分析支护结构体系的桩身弯矩、桩身位移和土压... 依托某高层建筑深基坑工程,通过现场试验获得不同施工阶段组合支护结构及基坑关键部位的变形规律。基于土体硬化模型建立深基坑组合支护体系的三维数值模型,对基坑开挖施工进行全过程模拟,分析支护结构体系的桩身弯矩、桩身位移和土压力分布规律。针对反压土的顶宽、高度、坡度以及斜支撑的间距、直径等影响因素设计正交试验,对围护桩受力变形的影响参数进行敏感性分析,并提出优化建议。研究结果表明:围护桩最大位移与最大正弯矩随反压土顶宽、高度、斜支撑直径的增大而减小,随着反压土坡度、斜支撑间距的增大而增大。桩身变形影响因素敏感性从大至小依次为反压土坡高、顶宽、反压土坡度、斜支撑间距和斜支撑直径;对组合支护体系进行设计时,建议在确定土坡自稳角度的前提下,尽量增大反压土土坡高度。 展开更多
关键词 基坑工程 组合支护结构 反压土 斜支撑 受力特性 优化设计
下载PDF
弹性环梁支撑下圆形深基坑支护结构变形解析解
19
作者 欧阳煜 高云飞 任凯凯 《上海大学学报(自然科学版)》 CAS CSCD 北大核心 2024年第1期128-139,共12页
将环梁和支护结构分别视为弹性圆环和弹性圆柱薄壳,基于环梁和圆柱壳的变形协调,得到了具有任意数目弹性环梁支撑圆形深基坑支护结构变形的解析解.在验证解析解合理性和可靠性的基础上,针对某一实际圆形基坑工程,比较了在刚性和弹性环... 将环梁和支护结构分别视为弹性圆环和弹性圆柱薄壳,基于环梁和圆柱壳的变形协调,得到了具有任意数目弹性环梁支撑圆形深基坑支护结构变形的解析解.在验证解析解合理性和可靠性的基础上,针对某一实际圆形基坑工程,比较了在刚性和弹性环梁支撑下支护结构变形和内力的差异,并分析了支护结构底部边界条件、环梁弹性模量、尺寸和数量以及位置等参数对支护结构变形和内力分布的影响.研究结果表明:相对于刚性环梁支撑,弹性环梁支撑处内力变化较小,环梁弹性模量和尺寸的改变只对基坑挖掘面以上支护结构变形和内力影响显著,而对挖掘面以下的支护结构变形和内力几乎没有影响.该研究成果为圆形基坑支护结构设计提供了理论依据和指导. 展开更多
关键词 圆形深基坑 支护结构 柱壳理论 弹性环梁支撑 解析解
下载PDF
桩撑式支护基坑通用弹性地基梁分析法
20
作者 史宏彦 涂彬鸿 杨德森 《广东工业大学学报》 CAS 2024年第2期37-43,共7页
弹性地基梁法常用于模拟分析桩撑(锚)式支护基坑在开挖、设撑等施工工况中变形和受力的变化。目前利用该方法对某工况基坑分析时,首先要将整个支护桩在支撑处划分为若干个桩段,然后利用相邻桩段交界处的位移连续条件和受力平衡条件,推... 弹性地基梁法常用于模拟分析桩撑(锚)式支护基坑在开挖、设撑等施工工况中变形和受力的变化。目前利用该方法对某工况基坑分析时,首先要将整个支护桩在支撑处划分为若干个桩段,然后利用相邻桩段交界处的位移连续条件和受力平衡条件,推导出相应的待定参数方程,之后再利用求出的待定参数分析支护体系(基坑)的变形和受力。由于不同施工工况对应的支撑数和桩段数不同,因此该方法必须根据不同工况重新推导各自的参数方程,从而导致计算过程繁杂,难以形成通用计算公式和方法,也不易编程等问题。通过将支撑与桩段归纳为3种基本连接形式(即支撑分别相连于桩顶、相邻两桩段之间和坑底),本文建立了相邻两个桩段间待定参数的递推公式,进而推导出了适用于内支撑和锚索支撑形式、任意支撑道数、开挖或设撑工况的通用待定参数方程。该方程仅含4个参数,远少于现有方法且易于求解。文中算例结果验证了本文方法的合理性和可行性。 展开更多
关键词 深基坑 桩撑(锚)式支护体系 弹性地基梁法 施工过程 变形和受力 通用分析方法