期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
The franchise contract on the first power plant to be BOT-built signed
1
《Electricity》 1996年第4期48-48,共1页
The Laibin B Thermal Power Plant in Guangxi Zhuang Autonotnous Region will be built under China’s BOT-build. operate. transfer. It in the first power plant of its kind in China. The Laibin B Power Plant will install ... The Laibin B Thermal Power Plant in Guangxi Zhuang Autonotnous Region will be built under China’s BOT-build. operate. transfer. It in the first power plant of its kind in China. The Laibin B Power Plant will install two 350 MW generating units and is planned to go into commercial operation in 2000. The first unit is scheduled to go on line in October 1999. 展开更多
关键词 BOT The franchise contract on the first power plant to be BOT-built signed
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部