The transmission capacity of gas pipeline networks should be calculated and allocated to deal with the capacity booking with shippers. Technical capacities, which depend on the gas flow distribution at routes or inter...The transmission capacity of gas pipeline networks should be calculated and allocated to deal with the capacity booking with shippers. Technical capacities, which depend on the gas flow distribution at routes or interchange points, are calculated with a multiobjective optimization model and form a Pareto solution set in the entry/exit or point-to-point regime. Then, the commercial capacities, which can be directly applied in capacity booking, are calculated with single-objective optimization models that are transformed from the above multiobjective model based on three allocation rules and the demand of shippers.Next, peak-shaving capacities, which are daily oversupply or overdelivery amounts at inlets or deliveries,are calculated with two-stage transient optimization models. Considering the hydraulic process of a pipeline network and operating schemes of compressor stations, all the above models are mixed-integer nonlinear programming problems. Finally, a case study is made to demonstrate the ability of the models.展开更多
In the research, problems and damages of soil erosions in West -East Natural Gas Transmission were analyzed; the reasons were summarized and the characteristics of soil erosion were researched in order to explore prin...In the research, problems and damages of soil erosions in West -East Natural Gas Transmission were analyzed; the reasons were summarized and the characteristics of soil erosion were researched in order to explore principles of pipeline prevention and seek countermeasures.展开更多
Simulation has proven to be an effective tool for analyzing pipeline network systems (PNS) in order to determine the design and operational variables which are essential for evaluating the performance of the system....Simulation has proven to be an effective tool for analyzing pipeline network systems (PNS) in order to determine the design and operational variables which are essential for evaluating the performance of the system. This paper discusses the use of simulation for performance analysis of transmission PNS. A simulation model was developed for determining flow and pressure variables for different configuration of PNS. The mathematical formulation for the simulation model was derived based on the principles of energy conservation, mass balance, and compressor characteristics. For the determination of the pressure and flow variables, solution procedure was developed based on iterative Newton Raphson scheme and implemented using visual C++6. Evaluations of the simulation model with the existing pipeline network system showed that the model enabled to determine the operational variables with less than ten iterations. The performances of the compressor working in the pipeline network system xvhich includes energy consumption, compression ratio and discharge pressure were evaluated to meet pressure requirements ranging from 4000-5000 kPa at various speed. Results of the analyses from the simulation indicated that the model could be used for performance analysis to assist decisions regarding the design and optimal operations of transmission PNS.展开更多
A hybrid energy transmission pipeline is proposed with the aim of long-distance cooperative transmission of electricity and chemical fuels, which is composed of an inner high-temperature superconducting (HTS) power ca...A hybrid energy transmission pipeline is proposed with the aim of long-distance cooperative transmission of electricity and chemical fuels, which is composed of an inner high-temperature superconducting (HTS) power cable and outer liquefied natural gas (LNG) pipeline. The flowing LNG could maintain the operating temperature of the inner HTS power cable within the range of 85 K-90 K, thus the Bi-2223 superconductors in the HTS power cable produce little Joule loss with the transmission current below the critical current. Owing to the advantages of high power density, low transmission losses and economical manufacturing costs, the hybrid energy transmission pipeline is expected to be widely utilized in the near future. In order to ensure the safety of the HTS power cable and explosive LNG in case of short-circuit faults, this paper tests and analyzes the characteristics of Bi-2223 HTS tapes of the Type HT-CA, Type HT-SS and Type H models under short-circuit current impacts at the LNG cooling temperature (85 K-90 K). An experimental platform is designed and established for the ampacity tests of HTS tapes above LN2 cooling temperature (77 K). The AC over-current impact tests at 85 K-90 K are carried out on each sample of Bi-2223 tapes respectively, and the experimental results are analyzed and compared to evaluate their performances under different operating conditions. The results indicate that the Type HT-CA tape can withstand 50 Hz short-circuit current impact with the amplitude of 1108 A (10 times of critical current Ic ) for 100 ms at 90 K, and its resistance is the smallest of the three tested samples under similar current impacts. Therefore, the Type HT-CA Bi-2223 tape is the optimal superconductor of the HTS power cable in the hybrid energy transmission pipeline.展开更多
The sharp increase in the total installed capacity of natural gas generators has intensified the dynamic interaction between the electricity and natural gas systems,which could induce cascading failure propagation acr...The sharp increase in the total installed capacity of natural gas generators has intensified the dynamic interaction between the electricity and natural gas systems,which could induce cascading failure propagation across the two systems that deserves intensive research.Considering the distinct time response behaviors of the two systems,this paper discusses an integrated simulation approach to simulate the cascading failure propagation process of integrated electricity and natural gas systems(IEGSs).On one hand,considering instantaneous re-distribution of power flows after the occurrence of disturbance or failure,the steady-state AC power flow model is employed.On the other hand,gas transmission dynamics are represented by dynamic model to capture the details of its transition process.The interactions between the two systems,intensified by energy coupling components(such as gas-fired generator and electricity-driven gas compressor)as well as the switching among the operation modes of compressors during the cascading failure propagation process,are studied.An IEGS composed of the IEEE 30-bus electricity system and a 14-node 15-pipeline gas system is established to illustrate the effectiveness of the proposed simulation approach,in which two energy sub-systems are coupled by compressor and gas-fired generator.Numerical results clearly demonstrate that heterogeneous interactions between electricity and gas systems would trigger the cascading failure propagation between the two coupling systems.展开更多
With the increase in energy demand, the demand for oil and gas transmission pipes, particularly high-grade longitudinal submerged arc welded pipes (LSAWs), have been growing in recent years. The construction of the ...With the increase in energy demand, the demand for oil and gas transmission pipes, particularly high-grade longitudinal submerged arc welded pipes (LSAWs), have been growing in recent years. The construction of the 2nd West -East natural gas transmission pipeline project shows that the oil and gas pipeline construction has entered a new phase of development with X80 pipes being applied in large scales for the first time in China. This paper briefly introduces the 2nd West-East natural gas transmission pipeline project and its main technical requirements with the focus on the features of API standard 5L X80 grade Ф 1219 mm series of U-ing-O-ing-Expanding ( UOE ) LSAW pipes, which Baosteel developed with the integrated technology for the 2nd West-East natural gas transmission pipeline project. The analysis shows the extra-low carbon content, the high contents of manganese and niobium, the fine microstructure, the high strength,the toughness and the good weldability of X80 pipes meet the requirements of "the technical specification of LSAW linepipes for the 2nd West-East natural gas transmission pipeline project in China". By the end of June 2010, Baosteel had totally produced 322000 t of Ф 1219 mm X80 UOE steel pipes, which have been successfully used in the 2nd West-East natural gas transmission pipeline project, thus filling the gap of the production of large diameter X80 UOE LSAW pipes in China.展开更多
文摘The transmission capacity of gas pipeline networks should be calculated and allocated to deal with the capacity booking with shippers. Technical capacities, which depend on the gas flow distribution at routes or interchange points, are calculated with a multiobjective optimization model and form a Pareto solution set in the entry/exit or point-to-point regime. Then, the commercial capacities, which can be directly applied in capacity booking, are calculated with single-objective optimization models that are transformed from the above multiobjective model based on three allocation rules and the demand of shippers.Next, peak-shaving capacities, which are daily oversupply or overdelivery amounts at inlets or deliveries,are calculated with two-stage transient optimization models. Considering the hydraulic process of a pipeline network and operating schemes of compressor stations, all the above models are mixed-integer nonlinear programming problems. Finally, a case study is made to demonstrate the ability of the models.
基金Supported by Scientific Research Program of Water Resources Department of the Xinjiang Uygur Autonomous Region (xjsl-2011-11)Young Core Project of Northwest A&F University (KZCXI-10-4-1)~~
文摘In the research, problems and damages of soil erosions in West -East Natural Gas Transmission were analyzed; the reasons were summarized and the characteristics of soil erosion were researched in order to explore principles of pipeline prevention and seek countermeasures.
文摘Simulation has proven to be an effective tool for analyzing pipeline network systems (PNS) in order to determine the design and operational variables which are essential for evaluating the performance of the system. This paper discusses the use of simulation for performance analysis of transmission PNS. A simulation model was developed for determining flow and pressure variables for different configuration of PNS. The mathematical formulation for the simulation model was derived based on the principles of energy conservation, mass balance, and compressor characteristics. For the determination of the pressure and flow variables, solution procedure was developed based on iterative Newton Raphson scheme and implemented using visual C++6. Evaluations of the simulation model with the existing pipeline network system showed that the model enabled to determine the operational variables with less than ten iterations. The performances of the compressor working in the pipeline network system xvhich includes energy consumption, compression ratio and discharge pressure were evaluated to meet pressure requirements ranging from 4000-5000 kPa at various speed. Results of the analyses from the simulation indicated that the model could be used for performance analysis to assist decisions regarding the design and optimal operations of transmission PNS.
基金supported by National Key R&D Project under Grant(2018YFB0904400).
文摘A hybrid energy transmission pipeline is proposed with the aim of long-distance cooperative transmission of electricity and chemical fuels, which is composed of an inner high-temperature superconducting (HTS) power cable and outer liquefied natural gas (LNG) pipeline. The flowing LNG could maintain the operating temperature of the inner HTS power cable within the range of 85 K-90 K, thus the Bi-2223 superconductors in the HTS power cable produce little Joule loss with the transmission current below the critical current. Owing to the advantages of high power density, low transmission losses and economical manufacturing costs, the hybrid energy transmission pipeline is expected to be widely utilized in the near future. In order to ensure the safety of the HTS power cable and explosive LNG in case of short-circuit faults, this paper tests and analyzes the characteristics of Bi-2223 HTS tapes of the Type HT-CA, Type HT-SS and Type H models under short-circuit current impacts at the LNG cooling temperature (85 K-90 K). An experimental platform is designed and established for the ampacity tests of HTS tapes above LN2 cooling temperature (77 K). The AC over-current impact tests at 85 K-90 K are carried out on each sample of Bi-2223 tapes respectively, and the experimental results are analyzed and compared to evaluate their performances under different operating conditions. The results indicate that the Type HT-CA tape can withstand 50 Hz short-circuit current impact with the amplitude of 1108 A (10 times of critical current Ic ) for 100 ms at 90 K, and its resistance is the smallest of the three tested samples under similar current impacts. Therefore, the Type HT-CA Bi-2223 tape is the optimal superconductor of the HTS power cable in the hybrid energy transmission pipeline.
基金supported by the National Natural Science Foundation of China(No.51777182)the National Natural Science Foundation(No.CMMI1635339)
文摘The sharp increase in the total installed capacity of natural gas generators has intensified the dynamic interaction between the electricity and natural gas systems,which could induce cascading failure propagation across the two systems that deserves intensive research.Considering the distinct time response behaviors of the two systems,this paper discusses an integrated simulation approach to simulate the cascading failure propagation process of integrated electricity and natural gas systems(IEGSs).On one hand,considering instantaneous re-distribution of power flows after the occurrence of disturbance or failure,the steady-state AC power flow model is employed.On the other hand,gas transmission dynamics are represented by dynamic model to capture the details of its transition process.The interactions between the two systems,intensified by energy coupling components(such as gas-fired generator and electricity-driven gas compressor)as well as the switching among the operation modes of compressors during the cascading failure propagation process,are studied.An IEGS composed of the IEEE 30-bus electricity system and a 14-node 15-pipeline gas system is established to illustrate the effectiveness of the proposed simulation approach,in which two energy sub-systems are coupled by compressor and gas-fired generator.Numerical results clearly demonstrate that heterogeneous interactions between electricity and gas systems would trigger the cascading failure propagation between the two coupling systems.
文摘With the increase in energy demand, the demand for oil and gas transmission pipes, particularly high-grade longitudinal submerged arc welded pipes (LSAWs), have been growing in recent years. The construction of the 2nd West -East natural gas transmission pipeline project shows that the oil and gas pipeline construction has entered a new phase of development with X80 pipes being applied in large scales for the first time in China. This paper briefly introduces the 2nd West-East natural gas transmission pipeline project and its main technical requirements with the focus on the features of API standard 5L X80 grade Ф 1219 mm series of U-ing-O-ing-Expanding ( UOE ) LSAW pipes, which Baosteel developed with the integrated technology for the 2nd West-East natural gas transmission pipeline project. The analysis shows the extra-low carbon content, the high contents of manganese and niobium, the fine microstructure, the high strength,the toughness and the good weldability of X80 pipes meet the requirements of "the technical specification of LSAW linepipes for the 2nd West-East natural gas transmission pipeline project in China". By the end of June 2010, Baosteel had totally produced 322000 t of Ф 1219 mm X80 UOE steel pipes, which have been successfully used in the 2nd West-East natural gas transmission pipeline project, thus filling the gap of the production of large diameter X80 UOE LSAW pipes in China.