期刊文献+
共找到315篇文章
< 1 2 16 >
每页显示 20 50 100
Design Theory of Full Face Rock Tunnel Boring Machine Transition Cutter Edge Angle and Its Application 被引量:25
1
作者 ZHANG Zhaohuang MENG Liang SUN Fei 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2013年第3期541-546,共6页
At present, the inner cutters of a full face rock tunnel boring machine (TBM) and transition cutter edge angles are designed on the basis of indentation test or linear grooving test. The inner and outer edge angles of... At present, the inner cutters of a full face rock tunnel boring machine (TBM) and transition cutter edge angles are designed on the basis of indentation test or linear grooving test. The inner and outer edge angles of disc cutters are characterized as symmetric to each other with respect to the cutter edge plane. This design has some practical defects, such as severe eccentric wear and tipping, etc. In this paper, the current design theory of disc cutter edge angle is analyzed, and the characteristics of the rock-breaking movement of disc cutters are studied. The researching results show that the rotational motion of disc cutters with the cutterhead gives rise to the difference between the interactions of inner rock and outer rock with the contact area of disc cutters, with shearing and extrusion on the inner rock and attrition on the outer rock. The wear of disc cutters at the contact area is unbalanced, among which the wear in the largest normal stress area is most apparent. Therefore, a three-dimensional model theory of rock breaking and an edge angle design theory of transition disc cutter are proposed to overcome the flaws of the currently used TBM cutter heads, such as short life span, camber wearing, tipping. And a corresponding equation is established. With reference to a specific construction case, the edge angle of the transition disc cutter has been designed based on the theory. The application of TBM in some practical project proves that the theory has obvious advantages in enhancing disc cutter life, decreasing replacement frequency, and making economic benefits. The proposed research provides a theoretical basis for the design of TBM three-dimensional disc cutters whose rock-breaking operation time can be effectively increased. 展开更多
关键词 disc cutter three-dimensional mode edge angle full face rock tunnel boring machine (TBM) flat-face cutterhead
下载PDF
Wear Analysis of Disc Cutters of Full Face Rock Tunnel Boring Machine 被引量:19
2
作者 ZHANG Zhaohuang MENG Liang SUN Fei 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2014年第6期1294-1300,共7页
Wear is a major factor of disc cutters’ failure. No current theory offers a standard for the prediction of disc cutter wear yet. In the field the wear prediction method commonly used is based on the excavation length... Wear is a major factor of disc cutters’ failure. No current theory offers a standard for the prediction of disc cutter wear yet. In the field the wear prediction method commonly used is based on the excavation length of tunnel boring machine(TBM) to predict the disc cutter wear and its wear law, considering the location number of each disc cutter on the cutterhead(radius for installation); in theory, there is a prediction method of using arc wear coefficient. However, the preceding two methods have their own errors, with their accuracy being 40% or so and largely relying on the technicians’ experience. Therefore, radial wear coefficient, axial wear coefficient and trajectory wear coefficient are defined on the basis of the operating characteristics of TBM. With reference to the installation and characteristics of disc cutters, those coefficients are modified according to penetration, which gives rise to the presentation of comprehensive axial wear coefficient, comprehensive radial wear coefficient and comprehensive trajectory wear coefficient. Calculation and determination of wear coefficients are made with consideration of data from a segment of TBM project(excavation length 173 m). The resulting wear coefficient values, after modification, are adopted to predict the disc cutter wear in the follow-up segment of the TBM project(excavation length of 5621 m). The prediction results show that the disc cutter wear predicted with comprehensive radial wear coefficient and comprehensive trajectory wear coefficient are not only accurate(accuracy 16.12%) but also highly congruous, whereas there is a larger deviation in the prediction with comprehensive axial wear coefficient(accuracy 41%, which is in agreement with the prediction of disc cutters’ life in the field). This paper puts forth a new method concerning prediction of life span and wear of TBM disc cutters as well as timing for replacing disc cutters. 展开更多
关键词 full face rock tunnel boring machine disc cutter radial wear coefficient axial wear coefficient trajectory wear coefficient
下载PDF
Performance characteristics of tunnel boring machine in basalt and pyroclastic rocks of Deccan traps–A case study 被引量:5
3
作者 Prasnna Jain A.K.Naithan T.N.Singh 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2014年第1期36-47,共12页
A12.24km long tunnel between Maroshi and Ruparel College is being excavated by tunnel boring machine(TBM)to improve the water supply system of Greater Mumbai,India.In this paper,attempt has been made to establish the ... A12.24km long tunnel between Maroshi and Ruparel College is being excavated by tunnel boring machine(TBM)to improve the water supply system of Greater Mumbai,India.In this paper,attempt has been made to establish the relationship between various litho-units of Deccan traps,stability of tunnel and TBM performances during the construction of5.83km long tunnel between Maroshi and Vakola.The Maroshi–Vakola tunnel passes under the Mumbai Airport and crosses both runways with an overburden cover of around70m.The tunneling work was carried out without disturbance to the ground.The rock types encountered during excavation arefine compacted basalt,porphyritic basalt,amygdaloidal basalt pyroclastic rocks with layers of red boles and intertrappean beds consisting of various types of shales Relations between rock mass properties,physico-mechanical properties,TBM specifications and the cor responding TBM performance were established.A number of support systems installed in the tunne during excavation were also discussed.The aim of this paper is to establish,with appropriate accuracy the nature of subsurface rock mass condition and to study how it will react to or behave during under ground excavation by TBM.The experiences gained from this project will increase the ability to cope with unexpected ground conditions during tunneling using TBM. 展开更多
关键词 TUNNELING Open-type tunnel boring machine(TBM) rock mass classification Ground supporting Deccan trap
下载PDF
Tunnelling performance prediction of cantilever boring machine in sedimentary hard-rock tunnel using deep belief network 被引量:2
4
作者 SONG Zhan-ping CHENG Yun +1 位作者 ZHANG Ze-kun YANG Teng-tian 《Journal of Mountain Science》 SCIE CSCD 2023年第7期2029-2040,共12页
Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in... Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in the field of underground space engineering.This paper presented a case study of tunnelling performance prediction method of CBM in sedimentary hard-rock tunnel of Karst landform type by using tunneling data and surrounding rock parameters.The uniaxial compressive strength(UCS),rock integrity factor(Kv),basic quality index([BQ]),rock quality index RQD,brazilian tensile strength(BTS) and brittleness index(BI) were introduced to construct a performance prediction database based on the hard-rock tunnel of Guiyang Metro Line 1 and Line 3,and then established the performance prediction model of cantilever boring machine.Then the deep belief network(DBN) was introduced into the performance prediction model,and the reliability of performance prediction model was verified by combining with engineering data.The study showed that the influence degree of surrounding rock parameters on the tunneling performance of the cantilever boring machine is UCS > [BQ] > BTS >RQD > Kv > BI.The performance prediction model shows that the instantaneous cutting rate(ICR) has a good correlation with the surrounding rock parameters,and the predicting model accuracy is related to the reliability of construction data.The prediction of limestone and dolomite sections of Line 3 based on the DBN performance prediction model shows that the measured ICR and predicted ICR is consistent and the built performance prediction model is reliable.The research results have theoretical reference significance for the applicability analysis and mechanical selection of cantilever boring machine for hard rock tunnel. 展开更多
关键词 Urban metro tunnel Cantilever boring machine Hard rock tunnel Performance prediction model Linear regression Deep belief network
下载PDF
Theoretical prediction of wear of disc cutters in tunnel boring machine and its application 被引量:8
5
作者 Zhaohuang Zhang Muhammad Aqeel +1 位作者 Cong Li Fei Sun 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2019年第1期111-120,共10页
Predicting the cutter consumption and the exact time to replace the worn-out cutters in tunneling projects constructed with tunnel boring machine(TBM) is always a challenging issue. In this paper, we focus on the anal... Predicting the cutter consumption and the exact time to replace the worn-out cutters in tunneling projects constructed with tunnel boring machine(TBM) is always a challenging issue. In this paper, we focus on the analyses of cutter motion in the rock breaking process and trajectory of rock breaking point on the cutter edge in rocks. The analytical expressions of the length of face along which the breaking point moves and the length of spiral trajectory of the maximum penetration point are derived. Through observation of rock breaking process of disc cutters as well as analysis of disc rock interaction, the following concepts are proposed: the arc length theory of predicting wear extent of inner and center cutters, and the spiral theory of predicting wear extent of gage and transition cutters. Data obtained from5621 m-long Qinling tunnel reveal that among 39 disc cutters, the relative errors between cumulatively predicted and measured wear values for nine cutters are larger than 20%, while approximately 76.9% of total cutters have the relative errors less than 20%. The proposed method could offer a new attempt to predict the disc cutter's wear extent and changing time. 展开更多
关键词 full-face rock TUNNEL boring machine(TBM) DISC CUTTER WEAR prediction
下载PDF
Laboratory tests to study the influence of rock stress confinement on the performances of TBM discs in tunnels 被引量:6
6
作者 N. Innaurato C. Oggeri +1 位作者 P. Oreste R. Vinai 《International Journal of Minerals,Metallurgy and Materials》 SCIE EI CAS CSCD 2011年第3期253-259,共7页
To clarify some aspects of rock destruction with a disc acting on a high confined tunnel face, a series of tests were carried out to examine fracture mechanisms under an indenter that simulates the tunnel boring machi... To clarify some aspects of rock destruction with a disc acting on a high confined tunnel face, a series of tests were carried out to examine fracture mechanisms under an indenter that simulates the tunnel boring machine (TBM) tool action, in the presence of an adjacent groove, when a state of stress (lateral confinement) is imposed on a rock sample. These tests proved the importance of carefully establishing the optimal distance of grooves produced by discs acting on a confined surface, and the value (as a mere order of magnitude) of the increase of the thrust to produce the initiation of chip formation, as long as the confinement pressure becomes greater. 展开更多
关键词 tunnels boring machines rock mechanics stress analysis
下载PDF
Numerical and experimental investigation of rock breaking method under free surface by TBM disc cutter 被引量:11
7
作者 ZHANG Xu-hui XIA Yi-min +2 位作者 ZENG Gui-ying TAN Qing GUO Ben 《Journal of Central South University》 SCIE EI CAS CSCD 2018年第9期2107-2118,共12页
To study the rock breaking method under the free surface induced by disc cutter,the rock breaking simulations were first conducted based on the discrete element method,and the dynamic process of rock breaking under th... To study the rock breaking method under the free surface induced by disc cutter,the rock breaking simulations were first conducted based on the discrete element method,and the dynamic process of rock breaking under the free surface was studied including stressed zone,crush zone,crack initiation and propagation.Then the crack propagation conditions,specific energy,etc.under different free surface distance(S)were also investigated combined with linear cutting experiments.The results show that the rock breaking process under the free surface induced by disc cutter is dominated by tension failure mode.There exists a critical S to promote crack propagation to free surface effectively.And this rock breaking method can improve the rock breaking force and breaking efficiency significantly when proper. 展开更多
关键词 free surface tunnel boring machine disc cutter rock breaking method
下载PDF
Machine learning-based classification of rock discontinuity trace:SMOTE oversampling integrated with GBT ensemble learning 被引量:10
8
作者 Jiayao Chen Hongwei Huang +2 位作者 Anthony G.Cohn Dongming Zhang Mingliang Zhou 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2022年第2期309-322,共14页
This paper presents a hybrid ensemble classifier combined synthetic minority oversampling technique(SMOTE),random search(RS)hyper-parameters optimization algorithm and gradient boosting tree(GBT)to achieve efficient a... This paper presents a hybrid ensemble classifier combined synthetic minority oversampling technique(SMOTE),random search(RS)hyper-parameters optimization algorithm and gradient boosting tree(GBT)to achieve efficient and accurate rock trace identification.A thirteen-dimensional database consisting of basic,vector,and discontinuity features is established from image samples.All data points are classified as either‘‘trace”or‘‘non-trace”to divide the ultimate results into candidate trace samples.It is found that the SMOTE technology can effectively improve classification performance by recommending an optimized imbalance ratio of 1:5 to 1:4.Then,sixteen classifiers generated from four basic machine learning(ML)models are applied for performance comparison.The results reveal that the proposed RS-SMOTE-GBT classifier outperforms the other fifteen hybrid ML algorithms for both trace and nontrace classifications.Finally,discussions on feature importance,generalization ability and classification error are conducted for the proposed classifier.The experimental results indicate that more critical features affecting the trace classification are primarily from the discontinuity features.Besides,cleaning up the sedimentary pumice and reducing the area of fractured rock contribute to improving the overall classification performance.The proposed method provides a new alternative approach for the identification of 3D rock trace. 展开更多
关键词 Tunnel face rock discontinuity trace machine learning Gradient boosting tree Generalization ability
下载PDF
Excavation of underground research laboratory ramp in granite using tunnel boring machine: Feasibility study 被引量:12
9
作者 Hongsu Ma Ju Wang +3 位作者 Ke Man Liang Chen Qiuming Gong Xingguang Zhao 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2020年第6期1201-1213,共13页
Underground research laboratory(URL)plays an important role in safe disposal of high-level radioactive waste(HLW).At present,the Xinchang site,located in Gansu Province of China,has been selected as the final site for... Underground research laboratory(URL)plays an important role in safe disposal of high-level radioactive waste(HLW).At present,the Xinchang site,located in Gansu Province of China,has been selected as the final site for China’s first URL,named Beishan URL.For this,a preliminary design of the Beishan URL has been proposed,including one spiral ramp,three shafts and two experimental levels.With advantages of fast advancing and limited disturbance to surrounding rock mass,the tunnel boring machine(TBM)method could be one of the excavation methods considered for the URL ramp.This paper introduces the feasibility study on using TBM to excavation of the Beishan URL ramp.The technical challenges for using TBM in Beishan URL are identified on the base of geological condition and specific layout of the spiral ramp.Then,the technical feasibility study on the specific issues,i.e.extremely hard rock mass,high abrasiveness,TBM operation,muck transportation,water drainage and material transportation,is investigated.This study demonstrates that TBM technology is a feasible method for the Beishan URL excavation.The results can also provide a reference for the design and construction of HLW disposal engineering in similar geological conditions.2020 Institute of Rock and Soil Mechanics,Chinese Academy of Sciences.Production and hosting by Elsevier B.V.This is an open access article under the CC BY-NC-ND license(http://creativecommons.org/licenses/by-nc-nd/4.0/). 展开更多
关键词 Underground research laboratory(URL) High-level radioactive waste(HLW)disposal Tunnel boring machine(TBM) Extremely hard rock mass rock mass boreability Spiral layout Beishan
下载PDF
Real-time rock mass condition prediction with TBM tunneling big data using a novel rock-machine mutual feedback perception method 被引量:12
10
作者 Zhijun Wu Rulei Wei +1 位作者 Zhaofei Chu Quansheng Liu 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2021年第6期1311-1325,共15页
Real-time perception of rock mass information is of great importance to efficient tunneling and hazard prevention in tunnel boring machines(TBMs).In this study,a TBM-rock mutual feedback perception method based on dat... Real-time perception of rock mass information is of great importance to efficient tunneling and hazard prevention in tunnel boring machines(TBMs).In this study,a TBM-rock mutual feedback perception method based on data mining(DM) is proposed,which takes 10 tunneling parameters related to surrounding rock conditions as input features.For implementation,first,the database of TBM tunneling parameters was established,in which 10,807 tunneling cycles from the Songhua River water conveyance tunnel were accommodated.Then,the spectral clustering(SC) algorithm based on graph theory was introduced to cluster the TBM tunneling data.According to the clustering results and rock mass boreability index,the rock mass conditions were classified into four classes,and the reasonable distribution intervals of the main tunneling parameters corresponding to each class were presented.Meanwhile,based on the deep neural network(DNN),the real-time prediction model regarding different rock conditions was established.Finally,the rationality and adaptability of the proposed method were validated via analyzing the tunneling specific energy,feature importance,and training dataset size.The proposed TBM-rock mutual feedback perception method enables the automatic identification of rock mass conditions and the dynamic adjustment of tunneling parameters during TBM driving.Furthermore,in terms of the prediction performance,the method can predict the rock mass conditions ahead of the tunnel face in real time more accurately than the traditional machine learning prediction methods. 展开更多
关键词 Tunnel boring machine(TBM) Data mining(DM) Spectral clustering(SC) Deep neural network(DNN) rock mass condition perception
下载PDF
Technical innovation in the “Beishan No. 1” hard rock tunnel boring machine for high-gradient spiral tunnels 被引量:1
11
作者 Ju WANG Mengxue QI +1 位作者 Bin LONG Hongsu MA 《Frontiers of Engineering Management》 CSCD 2024年第1期175-179,共5页
1 Project overview The“Beishan No.1”,the world’s first-ever hard rock Tunnel Boring Machine(TBM)tailored for high-gradient spiral tunnels,constitutes a pivotal element within the Beishan Underground Research Labora... 1 Project overview The“Beishan No.1”,the world’s first-ever hard rock Tunnel Boring Machine(TBM)tailored for high-gradient spiral tunnels,constitutes a pivotal element within the Beishan Underground Research Laboratory(URL)initiative in China.Beishan URL,the first URL for geological disposal of high level radioactive waste(HLW)in China,is a national key construction project listed in the“13th Five-Year Plan”.In 2019,subsequent to receiving approval from the China Atomic Energy Authority,the Beijing Research Institute of Uranium Geology(BRIUG),serving as the project’s owner,initiated its construction.This underground facility,categorized as a“third generation”URL for HLW disposal,i.e.,area-specific URL,was located in Beishan,Jiuquan City,Gansu Province,China,following more than three decades of rigorous research on site selection. 展开更多
关键词 tunnel boring machine extremely hard rock continuous small-radius curves high gradient equipment technology INNOVATION
原文传递
TBM tunneling in extremely hard and abrasive rocks:Problems,solutions and assisting methods 被引量:31
12
作者 ZHENG Yan-long HE Lei 《Journal of Central South University》 SCIE EI CAS CSCD 2021年第2期454-480,共27页
Extremely hard and abrasive rocks pose great challenges to the past and ongoing TBM projects by increasing cutter wear and reducing penetration rates.A considerable amount of research has been conducted to improve the... Extremely hard and abrasive rocks pose great challenges to the past and ongoing TBM projects by increasing cutter wear and reducing penetration rates.A considerable amount of research has been conducted to improve the performance of TBMs in those challenging grounds by either improving the capacity of TBMs or developing assisting rock breakage methods.This paper first highlights the challenges of hard and abrasive rocks on TBM tunneling through case studies.It then presents the development of hard rock TBMs and reviews the technologies that can be used individually or as assistance to mechanical excavators to break hard rocks.Emphases are placed on technologies of high pressure waterjet,laser and microwave.The state of the art of field and laboratory research,problems and research directions of those technologies are discussed.The assisting methods are technically feasible;however,the main challenges of using those methods in the field are that the energy consumption can be over 10 times high and that the existing equipments have robustness problems.More research should be conducted to study the overall energy consumption using TBMs and the assisting methods.Pulsed waterjet,laser and microwave technologies should also be developed to make the assistance economically viable. 展开更多
关键词 hard and abrasive rocks tunnel boring machine waterjet laser microwave
下载PDF
Real-time prediction of rock mass classification based on TBM operation big data and stacking technique of ensemble learning 被引量:21
13
作者 Shaokang Hou Yaoru Liu Qiang Yang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2022年第1期123-143,共21页
Real-time prediction of the rock mass class in front of the tunnel face is essential for the adaptive adjustment of tunnel boring machines(TBMs).During the TBM tunnelling process,a large number of operation data are g... Real-time prediction of the rock mass class in front of the tunnel face is essential for the adaptive adjustment of tunnel boring machines(TBMs).During the TBM tunnelling process,a large number of operation data are generated,reflecting the interaction between the TBM system and surrounding rock,and these data can be used to evaluate the rock mass quality.This study proposed a stacking ensemble classifier for the real-time prediction of the rock mass classification using TBM operation data.Based on the Songhua River water conveyance project,a total of 7538 TBM tunnelling cycles and the corresponding rock mass classes are obtained after data preprocessing.Then,through the tree-based feature selection method,10 key TBM operation parameters are selected,and the mean values of the 10 selected features in the stable phase after removing outliers are calculated as the inputs of classifiers.The preprocessed data are randomly divided into the training set(90%)and test set(10%)using simple random sampling.Besides stacking ensemble classifier,seven individual classifiers are established as the comparison.These classifiers include support vector machine(SVM),k-nearest neighbors(KNN),random forest(RF),gradient boosting decision tree(GBDT),decision tree(DT),logistic regression(LR)and multilayer perceptron(MLP),where the hyper-parameters of each classifier are optimised using the grid search method.The prediction results show that the stacking ensemble classifier has a better performance than individual classifiers,and it shows a more powerful learning and generalisation ability for small and imbalanced samples.Additionally,a relative balance training set is obtained by the synthetic minority oversampling technique(SMOTE),and the influence of sample imbalance on the prediction performance is discussed. 展开更多
关键词 Tunnel boring machine(TBM)operation data rock mass classification Stacking ensemble learning Sample imbalance Synthetic minority oversampling technique(SMOTE)
下载PDF
The three-dimension model for the rock-breaking mechanism of disc cutter andanalysis of rock-breaking forces 被引量:25
14
作者 Zhao-Huang Zhang Fei Sun 《Acta Mechanica Sinica》 SCIE EI CAS CSCD 2012年第3期675-682,共8页
To study the rock deformation with three- dimensional model under rolling forces of disc cutter, by car- rying out the circular-grooving test with disc cutter rolling around on the rock, the rock mechanical behavior u... To study the rock deformation with three- dimensional model under rolling forces of disc cutter, by car- rying out the circular-grooving test with disc cutter rolling around on the rock, the rock mechanical behavior under rolling disc cutter is studied, the mechanical model of disc cutter rolling around the groove is established, and the the- ory of single-point and double-angle variables is proposed. Based on this theory, the physics equations and geometric equations of rock mechanical behavior under disc cutters of tunnel boring machine (TBM) are studied, and then the bal- ance equations of interactive forces between disc cutter and rock are established. Accordingly, formulas about normal force, rolling force and side force of a disc cutter are de- rived, and their validity is studied by tests. Therefore, a new method and theory is proposed to study rock- breaking mech- anism of disc cutters. 展开更多
关键词 full face rock tunnel boring machine (TBM) Disc cutte Three-dimension model
下载PDF
Experimental study on acoustic emission characteristics of jointed rock mass by double disc cutter 被引量:5
15
作者 LIN Qi-bin CAO Ping +3 位作者 LI Kai-hui CAO Ri-hong ZHOU Ke-ping DENG Hong-wei 《Journal of Central South University》 SCIE EI CAS CSCD 2018年第2期357-367,共11页
The characteristics of joints are crucial factors which influence the penetration efficiency of tunnel boring machine(TBM).Based on the theoretical study,numerical simulation and experimental research,many researchers... The characteristics of joints are crucial factors which influence the penetration efficiency of tunnel boring machine(TBM).Based on the theoretical study,numerical simulation and experimental research,many researchers have studied the interaction between TBM disc cutters and jointed rock mass.However,in most of these works,the effect of joint on rock fragmentation by double disc cutter has been scarcely investigated.Thus,the effects of joint orientation and joint space on rock fragmentation by double disc cutter are highlighted in this study.During the test,jointed concrete specimens are adopted to simulate jointed rock mass.Improved RYL-600rock shear rheological instrument was employed during the indentation process under disc cutters,and acoustic emission location system was used to analyze the rock damage and physical deterioration.The results show that there are four failure modes and three modes of crack initiation and propagation in jointed rock mass.It is concluded that the existing joint planes have obviously restrained the crack initiation and propagation during the rock fragmentation process.The results also indicate that samples are damaged most seriously when joint orientation equals60°,which is proved to be the optimum joint orientation in TBM penetration. 展开更多
关键词 tunnel boring machine (TBM) jointed rock mass rock fragmentation crack propagation acoustic emission
下载PDF
Influence of confining stress on fracture characteristics and cutting efficiency of TBM cutters conducted on soft and hard rock 被引量:2
16
作者 刘京铄 曹平 +1 位作者 刘杰 蒋喆 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第5期1947-1955,共9页
Combined with numerical simulation, the influence of confining stress on cutting process, fracture conditions and cutting efficiencies of soft and hard rock has been conducted on the triaxial testing machine(TRW-3000)... Combined with numerical simulation, the influence of confining stress on cutting process, fracture conditions and cutting efficiencies of soft and hard rock has been conducted on the triaxial testing machine(TRW-3000) designed and manufactured in Central South University(China). Results are obtained by performing analysis on the fracture scopes of cement and granite plates,the characteristics of cutting force in cutting processes and the cutting efficiency. Firstly, the increase of latitude fracture scope and the decrease of longitude fracture scope are both more notable in the tests conducted on cement plates subjected to the increasing confining stresses; secondly, the increase tendency of peak penetration forces obtained from tests conducted on granite plates is more obvious, however, the increase tendencies of average penetration forces achieved from cement and granite plates are close to each other; thirdly, the cutting efficiency could be improved by increasing the spacing between cutters when the confining stress which acts on soft and hard rock increases in a certain degree, and the cutting efficiency of soft rock is more sensitive to the varying confining stresses. 展开更多
关键词 triaxial testing machine numerical study tunnel boring machine(TBM) cutter confining stress soft and hard rock cutting efficiency
下载PDF
Rock fragmentation under different installation polar angles of TBM disc cutters 被引量:1
17
作者 CHENG Yong-liang ZHONG Jue +1 位作者 MEI Yong-bing XIA Yi-min 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第10期2306-2313,共8页
The disc cutters of tunnel boring machine(TBM) are installed with different polar angles. This causes the cutting depth difference between adjacent disc cutters on the tunnel face. A rock-cutting model was established... The disc cutters of tunnel boring machine(TBM) are installed with different polar angles. This causes the cutting depth difference between adjacent disc cutters on the tunnel face. A rock-cutting model was established to study the rock fragmentation law between adjacent disc cutters with different polar angles based on particle flow code(PFC). The influence of polar angle of adjacent disc cutters on rock cracks and stresses under different cutter spacing and penetration was studied. Research shows that polar angle difference leads to the discontinuity of rock-fragmentation process by adjacent cutters. The effect of rock-fragmentation is influenced by the cutting depth difference between adjacent cutters. The effect of rock-fragmentation performed best, meanwhile large rock blocks were flaked when the difference of cutting depth is half of the penetration. Too large or small difference of the cutting depth will cause high specific energy consumption of rock fragmentation. The specific energy consumption is relatively small when the difference of cutting depth is half of the penetration. 展开更多
关键词 tunnel boring machine DISC CUTTER POLAR angle particle flow code rock FRAGMENTATION
下载PDF
Reducing risk in long deep tunnels by using TBM and drill-and-blast methods in the same project-the hybrid solution 被引量:2
18
作者 Nick Barton 《Journal of Rock Mechanics and Geotechnical Engineering》 2012年第2期115-126,共12页
There are many examples of TBM tunnels through mountains, or in mountainous terrain, which have suffered the ultimate fate of abandonment, due to insufficient pre-investigation. Depth-of-drilling limitations are inevi... There are many examples of TBM tunnels through mountains, or in mountainous terrain, which have suffered the ultimate fate of abandonment, due to insufficient pre-investigation. Depth-of-drilling limitations are inevitable when depths approach or even exceed l or 2 km. Uncertainties about the geology, hydro-geology, rock stresses and rock strengths go hand-in-hand with deep or ultra-deep tunnels. Unfortunately, unexpected conditions tend to have a much bigger impact on TBM projects than on drill-and-blast projects. There are two obvious reasons. Firstly the circular excavation maximizes the tangential stress, making the relation to rock strength a higher source of potential risk. Secondly, the TBM may have been progressing fast enough to make probe-drilling seem to be unnecessary. If the stress-to-strength ratio becomes too high, or if faulted rock with high water pressure is unexpectedly encountered, the "unexpected events" may have a remarkable delaying effect on TBM. A simple equation explains this phenomenon, via the adverse local Q-value that links directly to utilization. One may witness dramatic reductions in utilization, meaning ultra-steep deceleration-of-the-TBM gradients in a log-log plot of advance rate versus time. Some delays can be avoided or reduced with new TBM designs, where belief in the need for probe-drilling and sometimes also pre-injection, have been fully appreciated. Drill-and-blast tunneling, inevitably involving numerous "probe-holes" prior to each advance, should be used instead, if investigations have been too limited. TBM should be used where there is lower cover and where more is known about the rock and structural conditions. The advantages of the superior speed of TBM may then be fully realized. Choosing TBM because a tunnel is very long increases risk due to the law of deceleration with increased length, especially if there is limited pre-investigation because of tunnel depth. 展开更多
关键词 tunnel boring machine (TBM) rock strength deep tunnels tangential stress pre-injection Q-values UTILIZATION risk
下载PDF
HSP超前探测技术在煤矿TBM掘进巷道中的应用研究 被引量:2
19
作者 张盛 陈召 +5 位作者 卢松 杨战标 冀畔俊 贺飞 鲁义强 刘佳伟 《煤田地质与勘探》 EI CAS CSCD 北大核心 2024年第3期107-117,共11页
随着全断面掘进机TBM(Tunnel Boring Machine)逐渐应用于煤矿岩巷掘进,对不良地质构造进行超前准确快速预测的需求日益迫切。通过对主动源地震波超前探测方法的特点和TBM破岩震源超前探测技术的适用性进行分析,结合煤矿巷道地质和生产条... 随着全断面掘进机TBM(Tunnel Boring Machine)逐渐应用于煤矿岩巷掘进,对不良地质构造进行超前准确快速预测的需求日益迫切。通过对主动源地震波超前探测方法的特点和TBM破岩震源超前探测技术的适用性进行分析,结合煤矿巷道地质和生产条件,提出了适用于煤矿巷道TBM掘进的HSP超前探测方法。以河南平顶山首山一矿TBM掘进底板瓦斯治理巷道为工程背景,选用防爆硬件一体化设计的探测仪器在煤矿巷道中进行应用。构建了空间型观测方式对煤矿巷道近水平煤线进行探测,优化了双护盾TBM掘进巷道狭小空间检波器阵列式布置参数;基于时频分析、互相关干涉处理、反射与散射联合反演等方法处理原始信号并进行探测结果成像。研究表明:采用空间型观测方式可实现与巷道小角度斜交煤线的识别,设计震源与首检波器间距离为15 m时最优。通过时频分析提取有效信号,利用互相关干涉法获取虚拟震源道和反射特征曲线,并结合反射与散射联合反演成像得到探测区域地层反射能量分布图,能够较准确地推测得到围岩存在的不良地质构造。通过比较现场开挖揭露情况与探测结果发现两者吻合度较高,表明HSP超前探测方法可实现掘进工作面前方100 m范围内超前无损地质预测,有助于提高煤矿岩巷TBM掘进速度。 展开更多
关键词 煤矿岩巷 超前探测 水平声波探测法(HSP) TBM 破岩震源
下载PDF
天山胜利隧道敞开式TBM钢管片支护作用效果研究
20
作者 李林峰 谭忠盛 +1 位作者 周振梁 彭文波 《隧道建设(中英文)》 CSCD 北大核心 2024年第5期984-990,共7页
针对TBM穿越断层破碎带地层洞壁围岩松动掉块严重的问题,依托乌尉天山胜利隧道,采用数值模拟的方法,通过对比研究传统支护方式与新型钢管片支护方式下围岩变形和围岩塑性区情况,研究钢管片支护的作用效果;同时,为说明不同支护的适用条件... 针对TBM穿越断层破碎带地层洞壁围岩松动掉块严重的问题,依托乌尉天山胜利隧道,采用数值模拟的方法,通过对比研究传统支护方式与新型钢管片支护方式下围岩变形和围岩塑性区情况,研究钢管片支护的作用效果;同时,为说明不同支护的适用条件,采用现场调研方法开展不同支护方式下施工效率和经济性对比分析。结果表明:1)断层破碎带地层中,当围岩出露护盾后,变形量与塑性区范围增大,围岩破坏程度加剧,以锚杆和钢拱架为主的传统支护方式无法较好地控制围岩变形和塑性区发展。2)断层破碎带地层中,钢管片支护较传统支护的围岩累计沉降值降低53%,围岩变形收敛快,能更好地控制围岩变形和发展。3)钢管片支护较传统支护的围岩塑性区范围小,其中边墙的最终塑性区缩小44%,且钢管片支护可实现早封闭、及时支护,塑性区均匀,更有利于围岩的稳定。4)一般地层中,传统支护方式的经济性和效率更佳;断层破碎带地层中,钢管片支护方式可提供安全作业空间,减小钢拱架+喷锚支护作业量,较传统支护经济性和施工效率更佳。 展开更多
关键词 天山胜利隧道 敞开式TBM 断层破碎带 支护方式 围岩稳定性 钢管片支护
下载PDF
上一页 1 2 16 下一页 到第
使用帮助 返回顶部