期刊文献+
共找到2,523篇文章
< 1 2 127 >
每页显示 20 50 100
Deformation mechanism of surrounding rocks and key control technology for a roadway driven along goaf in fully mechanized top-coal caving face 被引量:10
1
作者 李学华 《Journal of Coal Science & Engineering(China)》 2003年第1期28-32,共5页
The variation of the stress in the bolted surrounding rocks structure of the roadway driven along goaf in a fully mechanized top coal caving face with moderate stable conditions are studied by using numerical calculat... The variation of the stress in the bolted surrounding rocks structure of the roadway driven along goaf in a fully mechanized top coal caving face with moderate stable conditions are studied by using numerical calculation. The essential deformation characteristics of the surrounding rocks in this kind of roadway are obtained and the key technology of bolting support used under these conditions is put forward. 展开更多
关键词 moderate stability gob side entry driving in a fully mechanized top coal caving face stress deformation bolting support
下载PDF
Statistic constitutive equation of top-coal damage for fully mechanized coal face with sublevel caving 被引量:2
2
作者 翟新献 《Journal of Coal Science & Engineering(China)》 2008年第1期6-11,共6页
Under the action of abutment pressure in front of fully mechanized coal face with sublevel caving(CFSC),top-coal over CFSC deformed.In the process of whole de- formation of top-coal,it changed from continuum elastic m... Under the action of abutment pressure in front of fully mechanized coal face with sublevel caving(CFSC),top-coal over CFSC deformed.In the process of whole de- formation of top-coal,it changed from continuum elastic mass to non-continuum plastic mass contained fissures,become a loose body.According to its bearing characteristics and mechanical properties,top-coal mass can be divided into four deformation zones along the winning direction of CFSC,i.e.initial stress zone,elastic zone,plastic zone and loose zone.Top-coal in plastic zone located in the post-peak zone of the stress-strain curve for top-coal.With equivalent strain principle of damage mechanics and mathemati- cal theory of statistic,combining the movement law of top-coal,set up a constitutive equa- tion with damage statistics for top-coal in different position in CFSC.The equation illus- trated the mathematical relationship among top-coal bearing capacity,horizontal confining pressure along the winning direction of CFSC and mechanical properties of top-coal mate- rial.The conclusions not only provide a basis for numerical computer simulations on damage deformation and failure mechanism for top-coal,but also further promote the ap- plication of damage mechanics in CFSC. 展开更多
关键词 coal seam fully mechanized coal face with sublevel caving (CFSC) top-coaldamage constitutive equation
下载PDF
Study on Filling Cross-Roadway in Fully-Mechanized Coal Faces with High Water-Content Material 被引量:1
3
作者 周华强 王光伟 +2 位作者 雷文成 曲庆贺 李峰 《Journal of China University of Mining and Technology》 2001年第2期113-117,共5页
A new method using high water content material to mechanically fill cross roadways to form artificial bottom for coal faces was introduced. The reasonable determination of filling range, the optimization of the compou... A new method using high water content material to mechanically fill cross roadways to form artificial bottom for coal faces was introduced. The reasonable determination of filling range, the optimization of the compounding ratio of high water content material, and the filling technique were discussed in detail. This new method has been spread after industrial testing in Baodian Colliery. Compared with the traditional method, the manual wooden chock method, the new one decreases about 40% of the filling range and cost in dealing every one set of cross roadway in the testing condition. 展开更多
关键词 fully mechanized coal face cross roadway high water content material FILLING artificial bottom
下载PDF
Back-and-forth mining for hard and thick coal seams—research about the mining technology for fully mechanized caving working face of Datong Mine
4
作者 金智新 于红 +1 位作者 于斌 宋华岭 《Journal of Coal Science & Engineering(China)》 2005年第2期1-4,共4页
The article introduced the key technology, mining process, and back-and-forth mining method for the caving working face of hard-thick coal seams in Datong mine, and researched this innovations process, optimized the s... The article introduced the key technology, mining process, and back-and-forth mining method for the caving working face of hard-thick coal seams in Datong mine, and researched this innovations process, optimized the systemic design and working face out-play, tried to perfect the caving mining technology of hard-thick coal seams further. 展开更多
关键词 hard and thick coal seams fully mechanized caving working face back-and- forth mining
下载PDF
Reliability analysis of the velocity matching of coal cutting and caving in fully mechanized top-coal caving face
5
作者 罗善明 缪协兴 《Journal of Coal Science & Engineering(China)》 2002年第1期68-72,共5页
The matching relationship between coal cutting and caving in fully mechanized top-coal caving face is analyzed in detail from the angle of reliability. The coupling equation of reliability is established corresponding... The matching relationship between coal cutting and caving in fully mechanized top-coal caving face is analyzed in detail from the angle of reliability. The coupling equation of reliability is established correspondingly, and the mathematical equation of the coefficient of velocity matching of coal cutting and caving is obtained, which meets a certain reliability demand for making the working procedure of coal caving not influence coal cutting of coal-cutter. The results show that the relationship between the coefficient of the velocity matching and the reliability of coal cutting and caving system is linear on the whole when R <0.9. It is pointed out that different numerical value should be selected for different coal face according to different demand for reliability. 展开更多
关键词 fully mechanized top-coal caving face velocity matching of coal cutting and caving reliability
下载PDF
Analysis and key control technologies to prevent spontaneous coal combustion occurring at a fully mechanized caving face with large obliquity in deep mines 被引量:7
6
作者 QIN Bo-tao SUN Qing-guo +2 位作者 WANG De-ming ZHANG Lei-lin XU Qin 《Mining Science and Technology》 EI CAS 2009年第4期446-451,共6页
In order to prevent spontaneous coal combustion occurring at a fully mechanized caving face with large obliquity in deep mines in China, we have analyzed the characteristics of spontaneous coal combustion and explain ... In order to prevent spontaneous coal combustion occurring at a fully mechanized caving face with large obliquity in deep mines in China, we have analyzed the characteristics of spontaneous coal combustion and explain theoretically the factors affecting spontaneous coal combustion, such as rock bursts, high temperatures, high ventilation resistance, slow advancing speed and large obliquity mining. Key technologies to prevent spontaneous combustion occurring in sharply inclined seams in deep mines are pro- posed; these include pouring water, stopping leakage in upper and lower comers of the working face, choking off the goaf and cov- eting the coal. CO concentrations were controlled within two years to less than 15×10^-6 at the upper comer by applying these tech- nologies at the 1410 working face of the Huafeng coal mine. Our method has significant theoretical value and is of practical impor- tance in controlling spontaneous coal combustion occurring at a fully mechanized caving face with large obliquity in deep mines. 展开更多
关键词 deep mine fully mechanized caving face with large obliquity spontaneous coal combustion
下载PDF
Study of mechanical principle of floor heave of roadway driving along next goaf in fully mechanized sub-level caving face 被引量:7
7
作者 王卫军 侯朝炯 《Journal of Coal Science & Engineering(China)》 2001年第1期13-17,共5页
Abstract On the basis of analyzing floor strata mechanical circumstance of the roadway, the mechanical model was established. The relative displacement of roadway floor, narrow pillar floor coal mass and floor strata ... Abstract On the basis of analyzing floor strata mechanical circumstance of the roadway, the mechanical model was established. The relative displacement of roadway floor, narrow pillar floor coal mass and floor strata was calculated, the results showed that the high abutment pressure on coal mass beside the roadway was the main reason to lead to relative displacement of floor strata. And the roadway floor heave come mainly from three aspects. Firstly, the roadway floor strata is easily fractured by the stretch stress. Secondly, because the high abutment pressure is greater than the uniaxial compressive strength of floor strata, when the roadway floor strata are fractured, the coal mass floor strata at the same depth will be fractured, and broken rock will fluid into the open roadway. Thirdly, comparing with the coal mass floor, the roadway floor is relative ascending. 展开更多
关键词 floor heave roadway driving along next goaf in coal face with fully mechanized top coal caving mechanical principle
下载PDF
Numerical simulation of coal wall cutting and lump coal formation in a fully mechanized mining face
8
作者 Yong Yuan Shengzhi Wang +1 位作者 Wenmiao Wang Cheng Zhu 《International Journal of Coal Science & Technology》 EI CAS CSCD 2021年第6期1371-1383,共13页
It is difficult to accurately calculate the lump coal rate in a fully mechanized mining face.Therefore,a numerical simulation of the coal wall cutting process,which revealed the crack expansion,development,evolution i... It is difficult to accurately calculate the lump coal rate in a fully mechanized mining face.Therefore,a numerical simulation of the coal wall cutting process,which revealed the crack expansion,development,evolution in the coal body and the corresponding lump coal formation mechanism,was performed in PFC2D.Moreover,a correlation was established between the cutting force and lump coal formation,and a statistical analysis method was proposed to determine the lump coal rate.The following conclusions are drawn from the results:(1)Based on a soft ball model,a coal wall cutting model is established.By setting the roller parameters based on linear bonding and simulating the roller cutting process of the coal body,the coal wall cutting process is effectively simulated,and accurate lump coal rate statistics are provided.(2)Under the cutting stress,the coal body in the working face underwent three stages—microfracture generation,fracture expansion,and fracture penetration—to form lump coal,in which the fracture direction is orthogonal to the cutting pressure chain.Within a certain range from the roller,as the cutting depth of the roller increased,the number of new fractures in the coal body first increases and then stabilizes.(3)Under the cutting stress,the fractured coal body is locally compressed,thereby forming a compact core.The formation and destruction of the compact core causes fluctuations in the cutting force.The fluctuation amplitude is positively related to the coal mass.(4)Because the simulation does not consider secondary damage in the coal,the simulated lump coal rate is larger than the actual lump coal rate in the working face;this deviation is mainly concentrated in large lump coal with a diameter greater than 300 mm. 展开更多
关键词 fully mechanized face Lump coal rate Fracture evolution Cutting force Particle flow simulation
下载PDF
Investigation on the stress field characteristic of top coal at FMTC faces under the influence of caving thickness 被引量:5
9
作者 谢广祥 常聚才 杨科 《Journal of Coal Science & Engineering(China)》 2007年第2期123-125,共3页
In the background of the technology condition and the geological condition of the 1151(3) fully mechanized top-coal caving face (FMTC face), and by means of taking nonlinear 3D numerical simulation, the stress red... In the background of the technology condition and the geological condition of the 1151(3) fully mechanized top-coal caving face (FMTC face), and by means of taking nonlinear 3D numerical simulation, the stress redistribution rules of top coal with different thick coal seam were obtained by investigation on the numerical simulation of the redistributions of the stress with different coal seam's thickness. The research showes that there exists a certain difference on the stress distributions of the top coal at face, the maximum principal stress is located near to the tailentry's corner. The vertical stress's peak of the top coal decreases and the distance ahead of face position increases as the once mining thickness of the coal seam increases. At the same coal seam, the vertical stresses' peak of top coal gradually decreases from the top to the bottom, the peak's position is basically the same and its changes are gradually obvious with the thickness of coal seam increas- ing. The vertical stress of top coal places in a low stress state at a certain range ahead of face and over the face, which reveals the essence that the support loads are generally low under the condition of FMTC. The study supplies the theoretical foundation for the support design and selection, the theory of top coal's fragmentation, the movement rules of top coal and improving the recovery of top coal. 展开更多
关键词 fully mechanized top-coal caving face thickness of coal seam top coal stress field
下载PDF
The Fuzzy Control Forecast of Fully-Mechanized Coal Face Production Capacity 被引量:2
10
作者 WANG Lian\|guo\ \ WANG Yu\|zhen Res. Ins. of Systems Eng., Shandong Institute of Mining and Technology, Tai′an 271000, China 《Systems Science and Systems Engineering》 CSCD 1999年第3期306-310,共5页
In this paper, the fully\|mechanized coal face system is thought of as a fuzzy controller, the various factors that have effect on the controller are found and analysis has been made as to how they effect the fully\|m... In this paper, the fully\|mechanized coal face system is thought of as a fuzzy controller, the various factors that have effect on the controller are found and analysis has been made as to how they effect the fully\|mechanized coal face′s production capacity. Based on the above analysis, this paper establishs a series of data analysis models describing the quantitative characteristics of the fully\|mechanized coal face production system. With this series of data models, 90 fully\|mechanized coal faces are processed and the fuzzy control forecasting model of the fully\|mechanized coal faces production capacity is established. This model is accurate and reliable and has achieved good results in practical applicaton. 展开更多
关键词 fully\|mechanized coal face production capacity forecast fuzzy controller
原文传递
Ground pressure and overlying strata structure for a repeated mining face of residual coal after room and pillar mining 被引量:10
11
作者 Jiang Bangyou Wang Lianguo +2 位作者 Lu Yinlong Sun Xiaokang Jin Gan 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第4期645-652,共8页
To investigate the abnormal ground pressures and roof control problem in fully mechanized repeated mining of residual coal after room and pillar mining, the roof fracture structural model and mechanical model were dev... To investigate the abnormal ground pressures and roof control problem in fully mechanized repeated mining of residual coal after room and pillar mining, the roof fracture structural model and mechanical model were developed using numerical simulation and theoretical analysis. The roof fracture characteristics of a repeated mining face were revealed and the ground pressure law and roof supporting condi- tions of the repeated mining face were obtained. The results indicate that when the repeated mining face passes the residual pillars, the sudden instability causes fracturing in the main roof above the old goal and forms an extra-large rock block above the mining face. A relatively stable "Voussoir beam" structure is formed after the advance fracturing of the main roof. When the repeated mining face passes the old goaf, as the large rock block revolves and touches gangue, the rock block will break secondarily under overburden rock loads. An example calculation was performed involving an integrated mine in Shanxi province, results showed that minimum working resistance values of support determined to be reason- able were respectively 11,412 kN and 10,743 kN when repeated mining face passed through residual pillar and goaf. On-site ground pressure monitoring results indicated that the mechanical model and support resistance calculation were reasonable. 展开更多
关键词 Residual coal after room and pillar mining Repeated mining fully mechanized caving face Roof control Support resistance
下载PDF
Mating model on production capacity for the system of cutting coal and drawing top-coal in FMMSC
12
作者 翟新献 《Journal of Coal Science & Engineering(China)》 2007年第2期113-117,共5页
Being a safe and highly-efficient mining method, fully mechanized mining with sublevel caving (FMMSC) was extensively employed in Chinese coal mines with thick seam. In order to make drawing top-coal furthest to par... Being a safe and highly-efficient mining method, fully mechanized mining with sublevel caving (FMMSC) was extensively employed in Chinese coal mines with thick seam. In order to make drawing top-coal furthest to parallel work with shearer cutting coal, decrease failure ratio of rear scraper conveyor and increase safe production capacity of equipments, based on production technology, set up the mating model of safe production capacity of equipments for the system of drawing top-coal and shearer cutting coal in coal face with sublevel caving. It is mean capability of drawing top-coal adapted to the capability of shearer cutting coal in a working circle in the coal face that was deduced. The type selection of equipment of rear scraper conveyor can be tackled with this mating model. The model was applied in FMMSC in Yangcun Coal Mine, Yima Coal Group of China. With the mating light-equipments, the coal output in coal face attained 1.05 Mt in 2004. It gained better technical-economic benefit. 展开更多
关键词 coal mine coal face fully mechanized mining with sublevel caving (FMMSC) system of curing coal and drawing top-coal mating equipments
下载PDF
长距离W型综采工作面风流-粉尘耦合运移规律 被引量:1
13
作者 曹旭生 《煤》 2023年第11期14-18,共5页
以王庄煤矿7105工作面为例,基于流体动力学原理,应用Fluent软件研究多工序、多尘源下的大采高综采工作面风流-粉尘耦合运移规律。结果表明,受采煤机设备阻碍作用的影响,风流在采煤机附近出现极大扰动,部分横向绕流促进了粉尘向整个巷道... 以王庄煤矿7105工作面为例,基于流体动力学原理,应用Fluent软件研究多工序、多尘源下的大采高综采工作面风流-粉尘耦合运移规律。结果表明,受采煤机设备阻碍作用的影响,风流在采煤机附近出现极大扰动,部分横向绕流促进了粉尘向整个巷道的运移扩散,割煤作业时,粉尘沿采煤机机道扩散的同时向人行道空间扩散,不同高度下粉尘质量浓度峰值出现的位置及最高浓度略有不同。 展开更多
关键词 粉尘运移 数值模拟 综采工作面 粉尘防治
下载PDF
煤矿井下非均匀照度图像去噪研究 被引量:1
14
作者 张旭辉 麻兵 +2 位作者 杨文娟 董征 李语阳 《工矿自动化》 CSCD 北大核心 2024年第2期1-8,共8页
煤矿综采工作面空间小、照明环境复杂多变,采煤过程中伴随着大量的粉尘、大雾,导致采集的图像出现曝光、细节特征减弱等问题,难以对井下照明区域光照强度过大的图像进行有效的特征提取。针对上述问题,提出了一种煤矿井下非均匀照度图像... 煤矿综采工作面空间小、照明环境复杂多变,采煤过程中伴随着大量的粉尘、大雾,导致采集的图像出现曝光、细节特征减弱等问题,难以对井下照明区域光照强度过大的图像进行有效的特征提取。针对上述问题,提出了一种煤矿井下非均匀照度图像去噪算法。首先,将视频截取为图像,判断图像是否需要进行光照抑制,将需要进行光照抑制的RGB图像拆分通道,并计算每个通道的光照调节因子,实现图像的整体光照调节;然后,将未进行整体光照抑制的图像和经整体光照抑制的图像进行反射分量提取,即将输入的图像转换为HSV空间图像,使用单尺度Retinex(SSR)算法对V通道图像中的光照分量进行单独处理,将V分量中的入射分量去除,保留反射分量,并对反射分量使用直方图均衡算法实现光照均衡化处理;最后,使用基于引导滤波的暗通道先验算法对经过光照处理后的图像进行去雾处理,并使用伽马校正函数重新调节亮度不均的图像。主观评价结果表明:提出的煤矿井下非均匀照度图像去噪算法有效抑制了因光照导致整体亮度较高的问题,且由于大雾、粉尘等因素导致图像模糊的部分更加清晰,图像的细节特征更加突出。采用信息熵、均值、标准差、空间频率4种评价指标对提出的算法效果进行客观评价,结果表明,提出的算法在信息熵、均值、标准差、空间频率上较多尺度Retinex(MSR)算法分别平均提升了21.87%,-56.06%,153.43%,294.45%,较基于颜色保持的多尺度视网膜增强(MSRCP)算法分别平均提升了1.18%,-39.56%,33.29%,-4.71%,较带色彩恢复的多尺度视网膜增强(MSRCR)算法分别平均提升了38.06%,-55.27%,462.10%,300.96%,说明提出的算法能更有效地增加图像信息量、抑制光照强度、提升边缘信息及图像清晰度。 展开更多
关键词 综采工作面 煤矿井下图像去噪 非均匀光照 高光抑制 亮度均衡 图像去雾 伽马校正
下载PDF
综放工作面围岩控制与智能化放煤技术现状及展望
15
作者 庞义辉 关书方 +2 位作者 姜志刚 白云 李鹏 《工矿自动化》 CSCD 北大核心 2024年第9期20-27,共8页
分析了厚及特厚煤层智能化综放工作面围岩控制技术与智能化放顶煤技术发展现状及存在的问题,从巷道围岩高效支护、工作面超前支护、坚硬特厚顶煤冒放性、液压支架位姿监测及智能化放顶煤5个方面提出了工程实际需求。针对综放工作面实现... 分析了厚及特厚煤层智能化综放工作面围岩控制技术与智能化放顶煤技术发展现状及存在的问题,从巷道围岩高效支护、工作面超前支护、坚硬特厚顶煤冒放性、液压支架位姿监测及智能化放顶煤5个方面提出了工程实际需求。针对综放工作面实现安全、高效、智能化开采存在的技术难题与工程需求,对综放工作面围岩控制技术、智能化放煤技术进行了研究:构建了坚硬特厚煤层顶煤悬臂梁力学模型,研发了提高顶煤冒放性及放出率关键技术,实现了坚硬特厚煤层超大采高综放开采;研发了单元式超前液压支架顶梁可旋转自复位装置,实现了液压支架顶梁根据巷道顶板倾斜角度自动旋转支护,有效提高了单元式超前液压支架对巷道顶底板的适应性;提出了采用巷道支护液压支架替代传统锚网支护结构的思路,具有支护效率高、成本低、节省工作面超前支护等优点;开发了基于立柱与尾梁千斤顶行程的综放液压支架支护姿态监测装置与算法,提高了液压支架支护姿态解算效率与精度;提出了基于透明地质模型、煤量监测装置与煤矸识别装置融合的智能放煤控制方法,可有效解决多夹矸层特厚顶煤智能化放煤技术难题。提出智能地质保障技术、机器视觉精准测量与智能感知技术、综放工作面设备智能精准自适应控制技术、综放工作面数字孪生技术等是智能化综放开采技术与装备的发展趋势。 展开更多
关键词 特厚煤层 综放开采 综放工作面 围岩控制 智能化放煤
下载PDF
基于残差优化的综采工作面煤壁点云补全方法
16
作者 汪卫兵 侯学谦 +3 位作者 赵栓峰 贺海涛 邢志中 路正雄 《工矿自动化》 CSCD 北大核心 2024年第6期120-128,共9页
煤矿综采工作面巷道的数字化三维重建过程中需要完整且密集的煤壁点云数据。受遮挡、视角限制等因素影响,采集的综采工作面煤壁点云数据往往不完整且稀疏,影响下游任务,需进行煤壁点云修复和补全。目前缺少针对井下点云补全任务的数据... 煤矿综采工作面巷道的数字化三维重建过程中需要完整且密集的煤壁点云数据。受遮挡、视角限制等因素影响,采集的综采工作面煤壁点云数据往往不完整且稀疏,影响下游任务,需进行煤壁点云修复和补全。目前缺少针对井下点云补全任务的数据集和网络模型,现有模型用于煤壁点云补全时存在点云密度分布不均匀、点云特征信息丢失等情况。针对上述问题,设计了一种基于残差优化的煤壁点云补全网络模型,采用监督学习方式学习点云特征信息,通过最小化密度采样和残差网络迭代优化输出完整点云。采集煤矿井下真实综采工作面煤壁点云数据,预处理后筛选可用数据,通过模拟随机空洞制作煤壁点云缺失数据集,并用缺失数据集训练基于残差优化的煤壁点云补全网络模型。实验结果表明:与经典的FoldingNet,TopNet,AtlasNet,PCN,3D-Capsule点云补全网络模型相比,基于残差优化的煤壁点云补全网络模型针对构造的缺失煤壁点云和稀疏煤壁点云补全的倒角距离、地移距离及F1分数均能达到最优水平,整体补全效果最佳;针对实际缺失的煤壁点云,该模型能够实现有效补全。 展开更多
关键词 煤矿综采工作面 数字化煤层 巷道三维重建 点云修复 点云补全 残差优化
下载PDF
特厚煤层工作面煤厚变化电磁波透视响应特征
17
作者 吴荣新 李响 +1 位作者 王锦国 肖玉林 《安徽理工大学学报(自然科学版)》 CAS 2024年第3期61-68,共8页
目的为掌握煤厚变化对特厚煤层工作面电磁波透视探测的影响,以准确圈定地质异常区,保障工作面安全高效生产。方法根据煤层工作面地质条件,利用三维仿真软件,对煤厚变化进行了电磁波透视数值模拟,并结合工作面探查实例进行了分析。结果0~... 目的为掌握煤厚变化对特厚煤层工作面电磁波透视探测的影响,以准确圈定地质异常区,保障工作面安全高效生产。方法根据煤层工作面地质条件,利用三维仿真软件,对煤厚变化进行了电磁波透视数值模拟,并结合工作面探查实例进行了分析。结果0~20m煤厚范围,随煤厚减小,电磁波透视场强值呈抛物线下降趋势,可分为缓慢降低(煤厚≥9m)、明显降低(9m>煤厚≥5m)和快速降低(煤厚<5m)3个范围。煤厚10m以上的工作面适合于依据相对煤层变薄程度和变薄区煤厚来分析透视电磁波响应:变薄程度>1/3正常煤厚且煤厚<8m的薄煤区有明显响应,变薄区煤厚越小,透视电磁波场强降低越显著。煤厚10m以下的工作面,可以仅依据相对煤层变薄程度分析透视电磁波响应:变薄程度>1/4正常煤厚的薄煤区有明显响应,变薄程度越大,透视电磁波场强降低越显著。陕西金源招贤矿业有限公司特厚煤层1304工作面探测实例表明:正常煤厚变化及薄煤区的电磁波响应特征与数值模拟结果一致;工作面物探圈定的落差1m以上断层及薄煤区范围,与实际揭露范围相吻合。结论利用煤厚变化电磁波响应特征能够可靠地探查特厚煤层工作面地质异常区范围。 展开更多
关键词 综采工作面 地质构造 电磁波透视 特厚煤层 场强
下载PDF
两次采动影响下小煤柱巷道切顶卸压围岩控制技术 被引量:2
18
作者 李汉璞 张百胜 +2 位作者 郭俊庆 杨依卓 崔俊彪 《矿业安全与环保》 CAS 北大核心 2024年第2期90-97,共8页
为解决多次采动影响下留小煤柱巷道矿压显现剧烈、围岩变形量大的问题,提出了“切顶卸压+顶、帮锚索补强”联合控制技术。以贾家沟煤矿10115运输巷为工程背景,分析了切顶卸压位置、高度与巷道围岩垂直应力分布的关系,给出切顶卸压关键参... 为解决多次采动影响下留小煤柱巷道矿压显现剧烈、围岩变形量大的问题,提出了“切顶卸压+顶、帮锚索补强”联合控制技术。以贾家沟煤矿10115运输巷为工程背景,分析了切顶卸压位置、高度与巷道围岩垂直应力分布的关系,给出切顶卸压关键参数,并研究了留小煤柱巷道在切顶卸压后受两次采动影响下的矿压显现规律。结果表明:切顶卸压后,煤柱上的应力峰值随切顶深度的增加呈指数降低;10115运输巷在邻近工作面一次采动过程中巷道围岩变形依次呈现出无变形、缓慢变形、快速变形和围岩稳定的变化规律,本工作面二次采动过程中巷道围岩变形依次呈现出明显变形和剧烈变形的规律;巷道围岩在受二次采动影响时变形更加剧烈,巷道变形量为一次采动时的3.0~7.5倍。 展开更多
关键词 切顶卸压 小煤柱 矿压显现 二次采动 综放工作面 围岩控制
下载PDF
坚硬顶板切顶卸压技术对巷道围岩变形规律影响 被引量:3
19
作者 赵常辛 李晓旭 +2 位作者 石蒙 冀瑞锋 张焱 《工矿自动化》 CSCD 北大核心 2024年第1期147-154,共8页
针对特厚煤层坚硬顶板、宽煤柱条件下临空巷道面临的高围岩应力、大变形等问题,以老石旦煤矿16403综放工作面为工程研究背景,从宽煤柱顶板侧向破断结构角度对临空巷道大变形的影响因素进行了理论分析,采用数值模拟方法研究了对16402运... 针对特厚煤层坚硬顶板、宽煤柱条件下临空巷道面临的高围岩应力、大变形等问题,以老石旦煤矿16403综放工作面为工程研究背景,从宽煤柱顶板侧向破断结构角度对临空巷道大变形的影响因素进行了理论分析,采用数值模拟方法研究了对16402运输巷实施不同切顶卸压方案时,临近采空区的16403回风巷侧向顶板采动应力传递规律,并在现场施工水力压裂钻孔进行切顶卸压,实现临空巷道围岩变形控制。研究结果表明:“低位坚硬岩层悬臂梁+高位坚硬岩层砌体梁”破断结构是特厚煤层宽煤柱临空巷道大变形的主要原因,可采用切顶卸压技术破坏宽煤柱顶板侧向破断结构来控制临空巷道围岩大变形;切顶角变化可使关键块B长度发生改变,切顶角越大,则关键块B长度越小,临空侧顶板载荷向煤柱传递的程度越弱,临空巷道围岩承受的采动应力越小,切顶角为100°时临空巷道围岩垂直应力与变形量最小;在16402运输巷以切顶角100°施工水力压裂钻孔后,16403回风巷顶底板变形量较未实施切顶卸压的16402回风巷减小86.5%,两帮变形量减小87.1%,临空巷道围岩稳定性得到极大提高。 展开更多
关键词 综放工作面 留煤柱护巷 临空巷道 围岩变形控制 切顶卸压 水力压裂
下载PDF
基于三线性应变软化模型的综采工作面煤壁片帮深度解析预测
20
作者 迟国铭 李刚 +1 位作者 张春会 徐刚 《煤炭科学技术》 EI CAS CSCD 北大核心 2024年第7期1-10,共10页
为预测综采工作面煤壁片帮深度,以煤壁为研究对象,煤壁煤体视作三线性应变软化材料;将直接顶和基本顶视作宏观顶板,建立了宏观顶板与煤层、支架相互作用的承载力学模型,结合边界条件推导了综采工作面煤壁片帮深度解析计算公式,利用该公... 为预测综采工作面煤壁片帮深度,以煤壁为研究对象,煤壁煤体视作三线性应变软化材料;将直接顶和基本顶视作宏观顶板,建立了宏观顶板与煤层、支架相互作用的承载力学模型,结合边界条件推导了综采工作面煤壁片帮深度解析计算公式,利用该公式研究上湾煤矿12401工作面煤壁片帮情况,分析影响煤壁片帮的因素及影响规律,结果表明:①推导获得的煤壁片帮深度计算公式能够较准确计算综采工作面煤壁片帮深度,能够定量分析顶板特性和支架参数等对煤壁片帮深度的影响。②增加支架初撑力能够降低煤壁片帮深度;增加支架刚度能够降低煤壁片帮深度,但效果较差;增加支架护帮板支护强度,煤壁片帮深度近似线性减小。③顶板厚度和抗拉强度增加,煤壁片帮深度增长,但增长速率随顶板厚度和抗拉强度增加逐渐趋缓。这主要由于顶板厚度和抗拉强度增加,顶板破断步距增大,向采空区内旋转下沉角度增大所致。④综采采高对煤壁片帮深度有很大影响,综采采高增大,煤壁片帮深度近似线性增长。⑤煤体单轴抗压强度增大,煤壁片帮深度减小,顶底板与煤层界面之间的摩擦因数增大,煤壁片帮深度减小。⑥顶板动载系数增大,煤壁片帮深度近似线性增大。 展开更多
关键词 综采工作面 煤壁片帮深度预测 液压支架 宏观顶板结构
下载PDF
上一页 1 2 127 下一页 到第
使用帮助 返回顶部