Back-and-forth mining for hard and thick coal seams—research about the mining technology for fully mechanized caving working face of Datong Mine
1
作者 金智新 于红 +1 位作者 于斌 宋华岭 《Journal of Coal Science & Engineering(China)》 2005年第2期1-4,共4页
The article introduced the key technology, mining process, and back-and-forth mining method for the caving working face of hard-thick coal seams in Datong mine, and researched this innovations process, optimized the s... The article introduced the key technology, mining process, and back-and-forth mining method for the caving working face of hard-thick coal seams in Datong mine, and researched this innovations process, optimized the systemic design and working face out-play, tried to perfect the caving mining technology of hard-thick coal seams further. 展开更多
关键词 hard and thick coal seams fully mechanized caving working face back-and- forth mining
下载PDF
Development and prospect on fully mechanized mining in Chinese coal mines 被引量:104
2
作者 Jinhua Wang 《International Journal of Coal Science & Technology》 EI CAS 2014年第3期253-260,共8页
Fully mechanized mining(FMM)technology has been applied in Chinese coal mines for more than 40 years.At present,the output of a FMM face has reached 10-million tons with Chinese-made equipment.In this study,the new de... Fully mechanized mining(FMM)technology has been applied in Chinese coal mines for more than 40 years.At present,the output of a FMM face has reached 10-million tons with Chinese-made equipment.In this study,the new developments in FMM technology and equipment in Chinese coal mines during past decades are introduced.The automatic FMM technology for thin seams,complete sets of FMM technology with ultra large shear height of 7 m for thick seams,complete sets of fully mechanized top coal caving technology with large shear height for ultra-thick seams of 20 m,complete sets of FMM technology for complex and difficult seams,including steeply inclined seams,soft coal seams with large inclination angle,and the mechanized filling mining technology and equipment are presented.Some typical case studies are also introduced.Finally,the existing problems with the FMM technology are discussed,and prospect of FMM technology and equipment applied in Chinese coal mines is put forward. 展开更多
关键词 fully mechanized mining mining with large shear height fully mechanized top coal caving Steeply inclined seam Back filling mining PROSPECT
下载PDF
Application of deep borehole blasting on fully mechanized hard top-coal pre-splitting and gas extraction in the special thick seam 被引量:3
3
作者 Liu Jian Liu Zegong +2 位作者 Xue Junhua Gao Kui Zhou Wei 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2015年第5期755-760,共6页
In order to solve the problems of top-coal inadequate destruction and large amounts of gas emission in mining extra thick and hard coal seam,this study investigated the pre-splitting for deep borehole blasting and gas... In order to solve the problems of top-coal inadequate destruction and large amounts of gas emission in mining extra thick and hard coal seam,this study investigated the pre-splitting for deep borehole blasting and gas pre-draining technologies on top coal.The mechanism of the technologies was systematically expounded based on hard top-coal cracks development obtained by numerical simulation and theoretical analysis.The results show that explosive blasting in the hard rock results in a large number of cracks and large displacement in the rock mass due to the effect of explosion stress.Meanwhile,the thick top-coal caves,and desorbing gas flows along the cracks improve gas extraction.Finally,the pre-splitting for deep borehole blasting and gas pre-draining technologies was applied in No.3802 working face of Shui Liandong Coal Mine,which increases monthly output in the face to 67.34 kt and the drained gas concentration to 86.2%.The drained gas average concentration from each borehole reaches 40%,and the effect is remarkable. 展开更多
关键词 Deep borehole blasting fully mechanized mining Hard thick coal seam Top-coal pre-splitting Gas extraction
下载PDF
Fracture mechanics model of fully mechanized top coal caving of shallow coal seams and its application 被引量:6
4
作者 Zhang Jiangong Miao Xiexing +1 位作者 Huang Yanli Li Meng 《International Journal of Mining Science and Technology》 SCIE EI 2014年第3期349-352,共4页
Based on break characteristics of roofs in fully mechanized top-coal mining of thick shallow coal seams, a fracture mechanics model was built, and the criterion of crack propagation in the main roof was derived using ... Based on break characteristics of roofs in fully mechanized top-coal mining of thick shallow coal seams, a fracture mechanics model was built, and the criterion of crack propagation in the main roof was derived using the fracture mechanics theory. The relationships between the fracture length of the roof and the working resistance of the supports were discovered, and the correlations between the load on the overlying strata and the ratio of the crack's length to the thickness of the roof were obtained. Using a working face of Jindi Coal Mine, Xing county Shanxi province as an example, the relationships between the fracture length of the roof and the working resistance of the supports were analysed in detail. The results give a design basis in hydraulic top coal caving supports, which could provide useful references in the practical application. On-site experiment proves that the periodic weighting step interval of the caving face is 15–16 m, which is basically consistent with the theoretical analysis results, and indicates that the mechanized caving hydraulic support is capable of meeting the support requirements in the mining of a super-thick but shallowly buried coal seam. 展开更多
关键词 Super-thick shallow coal seam fully mechanized top-caving mining Main roof Fracture mechanics model0
下载PDF
Vertical transportation system of solid material for backfilling coal mining technology 被引量:8
5
作者 Ju Feng Zhang Jixiong,Zhang Qiang 《International Journal of Mining Science and Technology》 2012年第1期41-45,共5页
For transportation of solid backfill material such as waste and fly ash from the surface to the bottom of the shaft in a fully mechanized backfilling coal backfilling coal mining technology, we developed a new vertica... For transportation of solid backfill material such as waste and fly ash from the surface to the bottom of the shaft in a fully mechanized backfilling coal backfilling coal mining technology, we developed a new vertical transportation system to transport this type of solid backfill material. Given the demands imposed on safely in feeding this material, we also investigated the structure and basic parameter of this system. For a mine in the Xingtai mining area the results show that: (1) a vertical transportation system should include three main parts, i.e., a feeding borehole, a maintenance chamber and a storage silo; (2) we determined that 486 mm is a suitable diameter for bore holes, the diameter of the storage silo is 6 m and its height 30 m in this vertical transportation system; (3) a conical buffer was developed to absorb the impact during the feeding process. To ensure normal implementation of fully mechanized backfilling coal mining technology and the safety of underground personnel, we propose a series of security technologies for anti-blockage, storage silo cleaning, high pressure air release and aspiration. This vertical transporting system has been applied in one this particular mine, which has fed about 4 million tons solid material with a feeding depth of 350 m and safely exploited 3 million tons of coal. 展开更多
关键词 fully mechanized backfilling coal mining Feeding bore hole Conical buffer Security guarantee
下载PDF
Ground pressure and overlying strata structure for a repeated mining face of residual coal after room and pillar mining 被引量:10
6
作者 Jiang Bangyou Wang Lianguo +2 位作者 Lu Yinlong Sun Xiaokang Jin Gan 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第4期645-652,共8页
To investigate the abnormal ground pressures and roof control problem in fully mechanized repeated mining of residual coal after room and pillar mining, the roof fracture structural model and mechanical model were dev... To investigate the abnormal ground pressures and roof control problem in fully mechanized repeated mining of residual coal after room and pillar mining, the roof fracture structural model and mechanical model were developed using numerical simulation and theoretical analysis. The roof fracture characteristics of a repeated mining face were revealed and the ground pressure law and roof supporting condi- tions of the repeated mining face were obtained. The results indicate that when the repeated mining face passes the residual pillars, the sudden instability causes fracturing in the main roof above the old goal and forms an extra-large rock block above the mining face. A relatively stable "Voussoir beam" structure is formed after the advance fracturing of the main roof. When the repeated mining face passes the old goaf, as the large rock block revolves and touches gangue, the rock block will break secondarily under overburden rock loads. An example calculation was performed involving an integrated mine in Shanxi province, results showed that minimum working resistance values of support determined to be reason- able were respectively 11,412 kN and 10,743 kN when repeated mining face passed through residual pillar and goaf. On-site ground pressure monitoring results indicated that the mechanical model and support resistance calculation were reasonable. 展开更多
关键词 Residual coal after room and pillar mining Repeated mining fully mechanized caving face Roof control Support resistance
下载PDF
Mating model on production capacity for the system of cutting coal and drawing top-coal in FMMSC
7
作者 翟新献 《Journal of Coal Science & Engineering(China)》 2007年第2期113-117,共5页
Being a safe and highly-efficient mining method, fully mechanized mining with sublevel caving (FMMSC) was extensively employed in Chinese coal mines with thick seam. In order to make drawing top-coal furthest to par... Being a safe and highly-efficient mining method, fully mechanized mining with sublevel caving (FMMSC) was extensively employed in Chinese coal mines with thick seam. In order to make drawing top-coal furthest to parallel work with shearer cutting coal, decrease failure ratio of rear scraper conveyor and increase safe production capacity of equipments, based on production technology, set up the mating model of safe production capacity of equipments for the system of drawing top-coal and shearer cutting coal in coal face with sublevel caving. It is mean capability of drawing top-coal adapted to the capability of shearer cutting coal in a working circle in the coal face that was deduced. The type selection of equipment of rear scraper conveyor can be tackled with this mating model. The model was applied in FMMSC in Yangcun Coal Mine, Yima Coal Group of China. With the mating light-equipments, the coal output in coal face attained 1.05 Mt in 2004. It gained better technical-economic benefit. 展开更多
关键词 coal mine coal face fully mechanized mining with sublevel caving (FMMSC) system of curing coal and drawing top-coal mating equipments
下载PDF
综采采场顶板结构模型及“支架-围岩”关系研究 被引量:22
8
作者 吴士良 刘思利 +3 位作者 佟金婉 王建行 史晨昊 赵吉玉 《山东科技大学学报(自然科学版)》 CAS 2016年第4期44-51,共8页
以综采采场上覆岩层运动规律为核心,运用"传递岩梁"理论对采场顶板运动参数进行预计算,建立了采场顶板结构模型,详细分析了支架在"给定变形"和"限定变形"两种工作状态下支护强度和活柱缩量的计算确定方... 以综采采场上覆岩层运动规律为核心,运用"传递岩梁"理论对采场顶板运动参数进行预计算,建立了采场顶板结构模型,详细分析了支架在"给定变形"和"限定变形"两种工作状态下支护强度和活柱缩量的计算确定方法。研究结果表明:直接顶由多分层组成时,具有不同运动组合特性的各分层垮落步距不同。将对采场矿压显现有明显影响的基本顶岩梁分为"单一岩梁"和"双岩梁"结构。采场顶板控制设计中对直接顶采用"给定载荷"的工作方式,根据不同的控顶要求对基本顶采用"给定变形"或"限定变形"的工作方式。在基本顶"双岩梁"结构下,既要防止下位岩梁运动时的切顶、活柱缩量超限等威胁,又要防止上位岩梁来压时对采场的动压冲击。 展开更多
关键词 综采采场 传递岩梁 顶板结构模型 支架-围岩关系
下载PDF
综放跨采巷道棚-索耦合协同支护技术 被引量:31
9
作者 田磊 谢文兵 +2 位作者 荆升国 邢艳冬 彭剑平 《煤炭科学技术》 CAS 北大核心 2011年第11期44-47,62,共5页
芦岭煤矿Ⅱ82运输上山受上方Ⅱ927综放工作面跨采影响且巷道围岩比较破碎,通过分析巷道围岩失稳机理得出了导致U型钢支架结构失稳的原因及锚索支护合理位置,提出了棚-索耦合支护技术方案;利用U型钢支架形成的基本承载结构,通过壁后充填... 芦岭煤矿Ⅱ82运输上山受上方Ⅱ927综放工作面跨采影响且巷道围岩比较破碎,通过分析巷道围岩失稳机理得出了导致U型钢支架结构失稳的原因及锚索支护合理位置,提出了棚-索耦合支护技术方案;利用U型钢支架形成的基本承载结构,通过壁后充填注浆实现了破碎围岩与U型钢支架的第一次耦合,再根据巷道围岩的变形特征和U型钢支架的结构失稳类型,通过合理布置结构补偿锚索实现支护结构补偿,使U型钢支架与锚索形成二次耦合支护,进而提高支架的整体承载能力和支护结构的稳定性,在整个跨采期间巷道顶底板移近量累计475 mm,两帮移近量累计206 mm。 展开更多
关键词 综放跨采 U型钢支架 结构补偿 高应力破碎巷道 壁后充填注浆 -索耦合支护
下载PDF
特厚煤层综放煤-矸-岩放落流动的时序规律及识别方法 被引量:13
10
作者 刘长友 张宁波 +2 位作者 郭凤岐 安森 陈宝宝 《煤炭学报》 EI CAS CSCD 北大核心 2022年第1期137-151,共15页
综放工作面放煤工艺中的煤矸智能识别是智能化综放开采的瓶颈,经过十几年的不断探索研究,基于煤层的沉积环境和岩性赋存特征,提出了煤岩层低水平自然γ射线辐射高精度实时探测方法和煤矸自动识别原理,为综放工作面放煤工序的煤矸智能识... 综放工作面放煤工艺中的煤矸智能识别是智能化综放开采的瓶颈,经过十几年的不断探索研究,基于煤层的沉积环境和岩性赋存特征,提出了煤岩层低水平自然γ射线辐射高精度实时探测方法和煤矸自动识别原理,为综放工作面放煤工序的煤矸智能识别控制奠定了基础。根据特厚煤层含多层夹矸的复杂结构特征,以提高煤矸识别的精准性为目的,分析了特厚煤层夹矸的赋存特点及自然辐射特性;开展了煤-矸(夹矸)-岩(直接顶岩石)放落流动的时序规律研究,得出顶煤中夹矸的层位、间距、层数等因素会影响放落流动时序,且呈现不同的时序状态,据此进行了放落流动时序分区;相应地不同时序区的混矸率会呈现不同的特征:当夹矸无时序放出时,混矸率在一固定的范围内波动,当煤-夹矸渐次放出时,混矸率呈现上升—稳定—连续台阶式上升的特征,直接顶矸石的混入,使得混矸率呈线性增加;基于煤-矸-岩放落流动的时序特征,得出了不同时序条件下自然射线的辐射变化特征,确定了自然射线辐射强度台阶式变化与夹矸赋存参数的影响关系,区分了放煤流中含有夹矸和直接顶矸石混入的辐射特征,确定了不同煤-矸-岩放落时序区的辐射强度范围,提出了以自然射线辐射强度作为煤-矸-岩自动识别的主要参数和2种不同关窗方式的识别方法;在同煤集团塔山煤矿进行了现场测试,测试结果与研究结果得到了很好的印证,达到了预期效果,为智能放煤的现场应用奠定了基础。 展开更多
关键词 综放开采 煤矸识别 智能化放顶煤 流动时序规律 特厚煤层
下载PDF
JBB-I型急倾斜煤层刨运综采机组研制与试验 被引量:6
11
作者 毛德兵 王耀辉 《煤炭科学技术》 CAS 北大核心 2014年第9期44-47,56,共5页
针对太平煤矿急倾斜煤层地质构造复杂,现有采煤方法落后致使采出率低的现状,研发了急倾斜煤层走向长壁综合机械化开采技术装备,即JBB-I型急倾斜煤层刨运综采机组成套装备,该机组主要由液压支架、电液控制系统及刨运机等组成。工业性试... 针对太平煤矿急倾斜煤层地质构造复杂,现有采煤方法落后致使采出率低的现状,研发了急倾斜煤层走向长壁综合机械化开采技术装备,即JBB-I型急倾斜煤层刨运综采机组成套装备,该机组主要由液压支架、电液控制系统及刨运机等组成。工业性试验结果表明,JBB-I型急倾斜煤层刨运综采机组结构简单,刨运梁既是刨头割煤时的承载体,又可用来移架,利用急倾斜煤层的特点省略了刮板输送机;机组运行时性能稳定,实现了工作面开采期间的无人化,增强了急倾斜工作面的安全性,提高了煤炭资源采出率。 展开更多
关键词 急倾斜煤层 走向长壁综合机械化采煤 刨运综采机组 工作面无人化 电液控制
下载PDF
基于L-R模糊数的综放工作面瓦斯爆燃火灾事故树分析 被引量:4
12
作者 余明高 安安 +1 位作者 贾海林 赵万里 《河南理工大学学报(自然科学版)》 CAS 2011年第1期1-5,共5页
瓦斯爆燃是矿井火灾的诱发因素之一,由于瓦斯特殊的物理化学性质和赋存条件导致其爆燃形式与煤自燃有许多不同之处.从瓦斯爆燃的三要素入手,结合综放面瓦斯爆燃事故的特点,建立了基于瓦斯爆燃的火灾事故树,在基本事件概率不清楚的情况下... 瓦斯爆燃是矿井火灾的诱发因素之一,由于瓦斯特殊的物理化学性质和赋存条件导致其爆燃形式与煤自燃有许多不同之处.从瓦斯爆燃的三要素入手,结合综放面瓦斯爆燃事故的特点,建立了基于瓦斯爆燃的火灾事故树,在基本事件概率不清楚的情况下,应用模糊数学理论将基本事件概率看作L-R模糊数,对事故树分析得出各个事件的概率值,为矿井防火提供更加科学的参考依据. 展开更多
关键词 瓦斯爆燃 事故树分析 综放工作面 L-R模糊数
下载PDF
Hilbert-Huang变换在煤矸界面探测中的应用 被引量:3
13
作者 刘伟 华臻 《计算机工程与应用》 CSCD 北大核心 2011年第9期8-11,15,共5页
为了解决煤矿综采工作面煤矸界面识别问题,将Hilbert-Huang变换应用于煤矸振动信号的特征提取。采用EMD方法可以将复杂环境下的煤矸振动加速度信号分解成固有模态分量,通过分析包含煤矸振动特征的前4个IMF分量,得到局部Hilbert边际谱和... 为了解决煤矿综采工作面煤矸界面识别问题,将Hilbert-Huang变换应用于煤矸振动信号的特征提取。采用EMD方法可以将复杂环境下的煤矸振动加速度信号分解成固有模态分量,通过分析包含煤矸振动特征的前4个IMF分量,得到局部Hilbert边际谱和局部能量谱,进而发现当顶煤放落时,其振动信号的幅值和能量主要集中在100Hz至600Hz的频率范围内;而当煤矸混放时,其幅值和能量则主要集中在1000Hz左右,此时100Hz至600Hz频率范围内的幅值和能量相对有所减弱。根据上述特征定义特征函数,应用到煤矸界面识别的仿真实验中,取得了很好的识别效果。 展开更多
关键词 综采工作面 煤矸振动信号 Hilbert—Huang变换 经验模态分解法(EMD) 局部Hilbert边际谱
下载PDF
综放工作面顶板运动规律及支架-围岩关系研究 被引量:18
14
作者 吴士良 刘思利 《煤炭科学技术》 CAS 北大核心 2016年第2期104-108,共5页
布尔台煤矿42103综放工作面回采过程中,经常出现台阶下沉甚至支架压死等现象,在对42103综放工作面支架合理工作阻力进行分析的基础上,采用理论推导和现场实测相结合的研究方法对工作面顶板运动规律进行计算,建立了42103综放工作面顶板... 布尔台煤矿42103综放工作面回采过程中,经常出现台阶下沉甚至支架压死等现象,在对42103综放工作面支架合理工作阻力进行分析的基础上,采用理论推导和现场实测相结合的研究方法对工作面顶板运动规律进行计算,建立了42103综放工作面顶板结构模型,并分析支架-围岩的相互关系,利用顶板结构模型法和动载系数法综合计算确定了42103综放工作面支架合理工作阻力。研究结果表明:42103综放工作面顶板压力为1.63 MPa,支架合理工作阻力为18 709 k N,支架合理支护强度为1.71 MPa。 展开更多
关键词 综放工作面 顶板结构模型 顶板运动规律 支架-围岩关系 支架合理工作阻力
下载PDF
砂墩子矿井4-1煤采煤方法与设备选型设计研究 被引量:15
15
作者 姬刘亭 《煤炭工程》 北大核心 2019年第8期5-8,共4页
针对砂墩子矿井4^-1号煤层赋存和开采技术条件,分析了分层开采、大采高综采和综放开采的适用性,总结了各采煤方法的优缺点,最终确定采用综放开采,同时分析了4^-1号煤层的顶煤冒放性;并根据规范要求对综放工作面的液压支架、采煤机、刮... 针对砂墩子矿井4^-1号煤层赋存和开采技术条件,分析了分层开采、大采高综采和综放开采的适用性,总结了各采煤方法的优缺点,最终确定采用综放开采,同时分析了4^-1号煤层的顶煤冒放性;并根据规范要求对综放工作面的液压支架、采煤机、刮板输送机等主要设备选型计算进行了设计研究。开采实践证明,综采放顶煤采煤法适用于砂墩子矿井4^-1煤层条件,工作面选取的配套设备合理适宜,实现了“一井一面”的高产高效矿井生产模式,为三道岭矿区4^-1、煤开采提供了指导和借鉴意义。 展开更多
关键词 采煤方法 设备选型 综放开采 三机配套 矿井设计
下载PDF
红柳林煤矿5^(-2)煤采煤方法选择 被引量:6
16
作者 牛德振 《煤炭工程》 北大核心 2014年第7期7-9,共3页
针对红柳林煤矿5-2煤赋存情况,列举出分层综采、综采放顶煤、大采高一次采全高开采方法,并对综采放顶煤和大采高一次采全高开采方法从不同方面进行了有针对性的比较,研究认为大采高一次采全高更有利于矿井安全高效开采,有利于提高煤炭... 针对红柳林煤矿5-2煤赋存情况,列举出分层综采、综采放顶煤、大采高一次采全高开采方法,并对综采放顶煤和大采高一次采全高开采方法从不同方面进行了有针对性的比较,研究认为大采高一次采全高更有利于矿井安全高效开采,有利于提高煤炭资源回收率,为类似赋存情况煤层的开采方法提供了借鉴。 展开更多
关键词 采煤方法 厚煤层 大采高综采 放顶煤
下载PDF
综放开采矿压显现规律与支架-围岩关系新认识 被引量:35
17
作者 闫少宏 《煤炭科学技术》 CAS 北大核心 2013年第9期96-99,共4页
通过分析我国10 m以下和10 m以上煤层综放开采矿压显现的主要特征,可知10 m以上煤层综放开采矿压显现强烈并有周期性;顶煤体对于综放开采矿压显现起着重要作用,在顶板变形压力作用下顶煤体可转变为"似刚性顶煤体";顶板可形成&... 通过分析我国10 m以下和10 m以上煤层综放开采矿压显现的主要特征,可知10 m以上煤层综放开采矿压显现强烈并有周期性;顶煤体对于综放开采矿压显现起着重要作用,在顶板变形压力作用下顶煤体可转变为"似刚性顶煤体";顶板可形成"组合悬臂梁—铰接岩梁"的结构,该结构的周期性运动使工作面产生"小、大"周期来压现象,并阐述了其发生机理;通过理论分析得到了支架工作阻力下限值解析计算式,分析可知支架工作阻力主要影响因素为直接顶岩块长度与厚度、基本顶断裂步距与厚度、矸石刚度、岩层破断角和冒落矸石碎胀系数。 展开更多
关键词 综放开采 矿压显现 支架-围岩关系 支架工作阻力下限值
下载PDF
薄-中厚煤层智能化综采保障技术与装备 被引量:3
18
作者 高喜才 马腾飞 +5 位作者 王琪 刘帅 张锡琛 范凯 唐建强 胡彬 《工矿自动化》 北大核心 2021年第11期95-100,共6页
针对西南地区薄-中厚煤层厚度变化大、走向断层发育、顶板破碎等复杂地质条件,提出了薄-中厚煤层智能化综采保障技术与装备。通过对断层上下盘破碎顶板实施注浆加固、挑顶改造,以及对沿空留巷采用锚网索联合支护+超前加固+爆破切顶+立... 针对西南地区薄-中厚煤层厚度变化大、走向断层发育、顶板破碎等复杂地质条件,提出了薄-中厚煤层智能化综采保障技术与装备。通过对断层上下盘破碎顶板实施注浆加固、挑顶改造,以及对沿空留巷采用锚网索联合支护+超前加固+爆破切顶+立柱挂网挡矸+滞后喷浆加固+收尾砌墙的耦合支护技术,大幅提升了巷道稳定性。设计了由8架超前支架与2架端头支架组成的横向自移式超前支架组,实现了工作面端头顶板支护与超前支架快速推进的协调配合。给出了薄-中厚煤层智能化综采工作面成套装备及其优化布置方案:当工作面两端采高小于巷道高度时,采用垫架支撑采煤机机头、机尾;将刮板输送机机头、机尾超出煤壁长度控制在800 mm,保证卧底量达97 mm,以及时清理浮煤;刮板输送机机头增设平行于底板的拖架,通过过渡支架辅助推移装置直接整体推移刮板输送机机头、机尾,有效解决了采煤机摇臂与刮板输送机互相干涉难题。提出了由端部割三角煤跟机段工序和中部斜切进刀跟机段工序组成的断层带主动预防性智能割煤工艺,利用半截深、分次截割方式,提高了断层带条件下采煤机安全割煤速度。 展开更多
关键词 煤炭开采 -中厚煤层 智能化综采 耦合支护 横向自移式超前支架组 综采成套装备 割煤工艺
下载PDF
大同“两硬”综放工作面顶煤注水-爆破联合弱化技术 被引量:16
19
作者 刘文 《中国煤炭》 北大核心 2011年第6期66-69,共4页
采用煤体注水、顶煤松动爆破和顶板预裂爆破3种工艺的注水-爆破联合弱化技术对"两硬"综放工作面顶煤进行弱化,使顶煤可放性大幅度提高。实践结果表明:注水-爆破联合弱化技术可以使煤体受到振动、碎裂,有效提高了顶煤裂隙发育... 采用煤体注水、顶煤松动爆破和顶板预裂爆破3种工艺的注水-爆破联合弱化技术对"两硬"综放工作面顶煤进行弱化,使顶煤可放性大幅度提高。实践结果表明:注水-爆破联合弱化技术可以使煤体受到振动、碎裂,有效提高了顶煤裂隙发育程度,减小了顶煤破碎块度,弱化了工作面上方顶煤的整体性,使顶煤运动步距有所减小,直接顶能够及时冒落。 展开更多
关键词 综放开采 坚硬顶板 坚硬煤层 注水弱化 爆破弱化 云冈煤矿
下载PDF
大采高坚硬顶板综放面“注-爆”一体卸压防冲技术 被引量:5
20
作者 李雁 《煤炭技术》 CAS 北大核心 2021年第11期86-89,共4页
针对千米深井综放工作面采场应力大、地质力学环境复杂、受开采扰动作用强、易诱发冲击地压等问题,分析了工作面冲击地压诱发及控制机理,提出了煤层注水+基本顶预裂爆破的“注-爆”一体化卸压防冲技术。通过对比不同注水孔及爆破孔布置... 针对千米深井综放工作面采场应力大、地质力学环境复杂、受开采扰动作用强、易诱发冲击地压等问题,分析了工作面冲击地压诱发及控制机理,提出了煤层注水+基本顶预裂爆破的“注-爆”一体化卸压防冲技术。通过对比不同注水孔及爆破孔布置间距条件下,采场超前支承压力分布特征、弹性应变能释放规律等,确定了大采高综放工作面注水及爆破钻孔的最优布置间距,在有效降低工作面冲击倾向的同时实现了较好的经济效益。 展开更多
关键词 千米深井 冲击地压 综放工作面 卸压 弹性应变能