The Shanghai High Repetition Rate XFEL and Extreme Light Facility(SHINE)project will use 6001.3 GHz fundamental power couplers,which are modified based on TTF-Ⅲ power couplers,for continuous-wave operation with input...The Shanghai High Repetition Rate XFEL and Extreme Light Facility(SHINE)project will use 6001.3 GHz fundamental power couplers,which are modified based on TTF-Ⅲ power couplers,for continuous-wave operation with input power up to approximately 7 kW.The first batch of 20 sets of 1.3 GHz coupler prototypes was fabricated from three domestic manufacturers for the SHINE project.To better characterize the radio frequency conditioning phenomena for validating the performance of power couplers,a room temperature test stand was designed,constructed,and commissioned for the SHINE 1.3 GHz power couplers.In addition,a horizontal test cryostat was built to test the 1.3 GHz superconducting cavities,fundamental power couplers,tuners,and other components as a set.The results of these tests indicate that the 1.3 GHz couplers are capable of handling up to 14 kW continuous waves.Herein,the main aspects of the radio frequency design and construction of the test stand,along with the test results of the high-power conditioning of the 1.3 GHz couplers,are described.展开更多
The third harmonic superconducting cryomodule is being designed for the Shanghai High repetition rate XFEL and Extreme light facility(SHINE)project,which is under construction.In contrast to the European X-ray Free El...The third harmonic superconducting cryomodule is being designed for the Shanghai High repetition rate XFEL and Extreme light facility(SHINE)project,which is under construction.In contrast to the European X-ray Free Electron Laser(E-XFEL)project,the 3.9 GHz cryomodules in the SHINE project will operate in the continuous wave regime with higher radio frequency average power for both cavities and couplers.We propose a 3.9 GHz fundamental power coupler with an adjustable antenna length,for satisfying the SHINE project requirements.Here,we describe the 3.9 GHz fundamental power coupler's design considerations and power requirements for various operating modes of the SHINE Linac.We also present the results of the radio frequency simulation and optimization,including the studies on multipacting and thermal analysis of the proposed 3.9 GHz coupler.展开更多
5-cell elliptical cavities have been selected for the main linac of the China Accelerator Driven subcritical System (C-ADS) in the medium energy section. According to the design, each cavity should be driven with ra...5-cell elliptical cavities have been selected for the main linac of the China Accelerator Driven subcritical System (C-ADS) in the medium energy section. According to the design, each cavity should be driven with radio frequency (RF) energy up to 150 kW by a fundamental power coupler (FPC). As the cavities work with high quality factor and high accelerating gradient, the coupler should keep the cavity from contamination in the assembly procedure. To fulfil the requirements, a single-window coaxial type coupler was designed with the capabilities of handling high RF power, class 10 clean room assembly, and heat load control. This paper presents the coupler design and gives details of RF design, heat load optimization and thermal analysis as well as multipacting simulations. In addition, a primary high power test has been performed and is described in this paper.展开更多
At the end of last year, the editors from Power and Electrical Engineers interviewed Zhou Xiaoxin on "Fundamental Research on Enhancing Operation Reliability for Large-Scale Interconnected Power Grids", a pr...At the end of last year, the editors from Power and Electrical Engineers interviewed Zhou Xiaoxin on "Fundamental Research on Enhancing Operation Reliability for Large-Scale Interconnected Power Grids", a project of "973 Program". Mr. Zhou, the chief engineer of China Electric Power Research Institute(CEPRI) and an academician of Chinese Academy of Sciences, is the chief scientist in charge of this research project.展开更多
基金supported by Shanghai Municipal Science and Technology Major Project(No.2017SHZDZX02)。
文摘The Shanghai High Repetition Rate XFEL and Extreme Light Facility(SHINE)project will use 6001.3 GHz fundamental power couplers,which are modified based on TTF-Ⅲ power couplers,for continuous-wave operation with input power up to approximately 7 kW.The first batch of 20 sets of 1.3 GHz coupler prototypes was fabricated from three domestic manufacturers for the SHINE project.To better characterize the radio frequency conditioning phenomena for validating the performance of power couplers,a room temperature test stand was designed,constructed,and commissioned for the SHINE 1.3 GHz power couplers.In addition,a horizontal test cryostat was built to test the 1.3 GHz superconducting cavities,fundamental power couplers,tuners,and other components as a set.The results of these tests indicate that the 1.3 GHz couplers are capable of handling up to 14 kW continuous waves.Herein,the main aspects of the radio frequency design and construction of the test stand,along with the test results of the high-power conditioning of the 1.3 GHz couplers,are described.
基金supported by Shanghai Municipal Science and Technology Major Project(No.2017SHZDZX02)。
文摘The third harmonic superconducting cryomodule is being designed for the Shanghai High repetition rate XFEL and Extreme light facility(SHINE)project,which is under construction.In contrast to the European X-ray Free Electron Laser(E-XFEL)project,the 3.9 GHz cryomodules in the SHINE project will operate in the continuous wave regime with higher radio frequency average power for both cavities and couplers.We propose a 3.9 GHz fundamental power coupler with an adjustable antenna length,for satisfying the SHINE project requirements.Here,we describe the 3.9 GHz fundamental power coupler's design considerations and power requirements for various operating modes of the SHINE Linac.We also present the results of the radio frequency simulation and optimization,including the studies on multipacting and thermal analysis of the proposed 3.9 GHz coupler.
基金Supported by China ADS Project(XDA03020000)National Natural Science Foundation of China(11475203)
文摘5-cell elliptical cavities have been selected for the main linac of the China Accelerator Driven subcritical System (C-ADS) in the medium energy section. According to the design, each cavity should be driven with radio frequency (RF) energy up to 150 kW by a fundamental power coupler (FPC). As the cavities work with high quality factor and high accelerating gradient, the coupler should keep the cavity from contamination in the assembly procedure. To fulfil the requirements, a single-window coaxial type coupler was designed with the capabilities of handling high RF power, class 10 clean room assembly, and heat load control. This paper presents the coupler design and gives details of RF design, heat load optimization and thermal analysis as well as multipacting simulations. In addition, a primary high power test has been performed and is described in this paper.
文摘At the end of last year, the editors from Power and Electrical Engineers interviewed Zhou Xiaoxin on "Fundamental Research on Enhancing Operation Reliability for Large-Scale Interconnected Power Grids", a project of "973 Program". Mr. Zhou, the chief engineer of China Electric Power Research Institute(CEPRI) and an academician of Chinese Academy of Sciences, is the chief scientist in charge of this research project.