Sustainability is popularly defined as meeting the needs of the present generation without compromising the ability of future generations to meet their own needs. Social, economic and environmental parameters are most...Sustainability is popularly defined as meeting the needs of the present generation without compromising the ability of future generations to meet their own needs. Social, economic and environmental parameters are most commonly accepted as the three pillars of sustainability. In this paper, various sustainability indicators have been identified during the construction stage for elevated transportation corridors and thereafter classified under various categories. Using fuzzy VIKOR technique, sustainability evaluation of transportation corridors is made on two selected project sites of two different government organizations using various identified sustainability indicators, i.e., a 3.2-km long elevated road project under construction from Vikaspuri to Meerabagh in West Delhi by PWD (Public Works Department) and the metro rail elevated corridor (part) from Punjabi Bagh to Mayapuri as a part of Phase 3, Line 7 by DMRC (Delhi Metro Rail Corporation). The study is made at both sites in the midst of the construction period and it is identified that during the construction stage, the sustainability of these transportation corridors is just not limited to three pillars, but in actuality, it is much beyond that. From the study, it is inferred that the metro rail elevated corridor is a more sustainable corridor, in the context of the identified sustainability indicators.展开更多
文摘Sustainability is popularly defined as meeting the needs of the present generation without compromising the ability of future generations to meet their own needs. Social, economic and environmental parameters are most commonly accepted as the three pillars of sustainability. In this paper, various sustainability indicators have been identified during the construction stage for elevated transportation corridors and thereafter classified under various categories. Using fuzzy VIKOR technique, sustainability evaluation of transportation corridors is made on two selected project sites of two different government organizations using various identified sustainability indicators, i.e., a 3.2-km long elevated road project under construction from Vikaspuri to Meerabagh in West Delhi by PWD (Public Works Department) and the metro rail elevated corridor (part) from Punjabi Bagh to Mayapuri as a part of Phase 3, Line 7 by DMRC (Delhi Metro Rail Corporation). The study is made at both sites in the midst of the construction period and it is identified that during the construction stage, the sustainability of these transportation corridors is just not limited to three pillars, but in actuality, it is much beyond that. From the study, it is inferred that the metro rail elevated corridor is a more sustainable corridor, in the context of the identified sustainability indicators.