期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Application of fuzzy optimization model in the evaluationof urban flood-waterloggedvulnerabilitybased on the synthetic weight ofgame theory
1
作者 LIU Ke 《International Journal of Technology Management》 2014年第5期6-9,共4页
The evaluation of urban flood-waterlogged vulnerability is very important to the safety of urban flood control. In this paper, the evaluation of consolidated index is used. Respectively, AHP and entropy method calcula... The evaluation of urban flood-waterlogged vulnerability is very important to the safety of urban flood control. In this paper, the evaluation of consolidated index is used. Respectively, AHP and entropy method calculate the subjective and objective weight of the evaluation indicators, and combine them by game theory. So we can obtain synthetic weight based on objective and subjective weights. The evaluation of urban flood-waterlogged vulnerability as target layer, a single variable multi-objective fuzzy optimization model is established. We use the model to evaluate flood-waterlogged vulnerability of 13 prefecture-level city in Hunan, and compare it with other evaluation method. The results show that the evaluation method has certain adaptability and reliability, and it' s helpfid to the construction planning of urban flood control. 展开更多
关键词 Evaluation of urban flood-waterlogged vulnerability Synthetic weights Game theory Variable fuzzy optimization model
下载PDF
Fuzzy linear model for production optimization of mining systems with multiple entities 被引量:1
2
作者 Slobodan Vujic Tomo Benovic +3 位作者 Igor Miljanovic Marjan Hudej Aleksandar Milutinovic Petar Pavlovic 《International Journal of Minerals,Metallurgy and Materials》 SCIE EI CAS CSCD 2011年第6期633-637,共5页
Planning and production optimization within multiple mines or several work sites (entities) mining systems by using fuzzy linear programming (LP) was studied. LP is the most commonly used operations research metho... Planning and production optimization within multiple mines or several work sites (entities) mining systems by using fuzzy linear programming (LP) was studied. LP is the most commonly used operations research methods in mining engineering. After the introductory review of properties and limitations of applying LP, short reviews of the general settings of deterministic and fuzzy LP models are presented. With the purpose of comparative analysis, the application of both LP models is presented using the example of the Bauxite Basin Niksic with five mines. After the assessment, LP is an efficient mathematical modeling tool in production planning and solving many other single-criteria optimization problems of mining engineering. After the comparison of advantages and deficiencies of both deterministic and fuzzy LP models, the conclusion presents benefits of the fuzzy LP model but is also stating that seeking the optimal plan of production means to accomplish the overall analysis that will encompass the LP model approaches. 展开更多
关键词 linear programming fuzzy set theory optimization production planning bauxite mines
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部