期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Application of Fuzzy QFD to Aircraft Top Hierarchy Design
1
作者 XIEJian-xi SONGBi-feng LIUDong-xia 《International Journal of Plant Engineering and Management》 2004年第4期215-221,共7页
In this paper, based on the Quality Function Deployment ( QFD) method, theFuzzy Quality Function Deployment (FQFD) theory and the step-by-step hierarchy structure in aircrafttop decision design are studied. The fuzzy ... In this paper, based on the Quality Function Deployment ( QFD) method, theFuzzy Quality Function Deployment (FQFD) theory and the step-by-step hierarchy structure in aircrafttop decision design are studied. The fuzzy model for computing competitive factor in evaluation ispresented. The decision of key technologies for improving the performance and affordability of afixed-wing aircraft is studied using the model, and the result proves the feasibility of this model. 展开更多
关键词 aircraft decision design fuzzy quality function deployment (FQFD) competitive factor fuzzy evaluation
下载PDF
Fuzzy finish time modeling for project scheduling
2
作者 Yu-chuan LIU Shih-ming YANG Yu-te LIN 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2010年第12期946-952,共7页
This research aims at developing a new fuzzy activity finish time estimation model for project scheduling management.With the application of the fuzzy quality function deployment (FQFD) and fuzzy analytic hierarchy pr... This research aims at developing a new fuzzy activity finish time estimation model for project scheduling management.With the application of the fuzzy quality function deployment (FQFD) and fuzzy analytic hierarchy process (FAHP) methods,the degree of fuzziness for every project activity is calculated in accordance with considerations of project uncertainties.These uncertainties are measured by the risk level of such project-related characteristics as time limit,activity start time,budget,manpower,technological difficulty,and facility requirements.In this paper,rather than applying the de-fuzzification technique to obtain the crisp activity duration for project scheduling,the fuzzy finish time estimation method for every activity is proposed based on the degree of fuzziness.The corresponding fuzzy activity duration time plot is also developed in a new fuzzy Gantt chart.The proposed model can provide a reasonable fuzzy finish time estimation for every activity,while most scheduling methods only provide the finish time of the entire project.Compared to existing models,this time estimation model and its corresponding Gantt chart are predicted to have higher reliability and practical application in project management and scheduling. 展开更多
关键词 fuzzy quality function deployment (FQFD) fuzzy analytic hierarchy process (FAHP) fuzzy Gantt chart Project management Project scheduling
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部