期刊文献+
共找到5篇文章
< 1 >
每页显示 20 50 100
Integrated construction technology for natural gas gravity drive and underground gas storage 被引量:2
1
作者 JIANG Tongwen WANG Zhengmao WANG Jinfang 《Petroleum Exploration and Development》 CSCD 2021年第5期1227-1236,共10页
Based on the mechanisms of gravity displacement,miscibility,viscosity reduction,and imbibition in natural gas flooding,an integrated reservoir construction technology of oil displacement and underground gas storage(UG... Based on the mechanisms of gravity displacement,miscibility,viscosity reduction,and imbibition in natural gas flooding,an integrated reservoir construction technology of oil displacement and underground gas storage(UGS)is proposed.This paper systemically describes the technical connotation,site selection principle and optimization process of operation parameters of the gas storage,and advantages of this technology.By making full use of the gravity displacement,miscibility,viscosity reduction,and imbibition features of natural gas flooding,the natural gas can be injected into oil reservoir to enhance oil recovery and build strategic gas storage at the same time,realizing the win-win situation of oil production and natural gas peak shaving.Compared with the gas reservoir storage,the integrated construction technology of gas storage has two profit models:increasing crude oil production and gas storage transfer fee,so it has better economic benefit.At the same time,in this kind of gas storage,gas is injected at high pressure in the initial stage of its construction,gas is injected and produced in small volume in the initial operation stage,and then in large volume in the middle and late operation stage.In this way,the gas storage wouldn’t have drastic changes in stress periodically,overcoming the shortcomings of large stress variations of gas reservoir storage during injection-production cycle due to large gas injection and production volume.The keys of this technology are site selection and evaluation of oil reservoir,and optimization of gravity displacement,displacement pressure,and gas storage operation parameters,etc.The pilot test shows that the technology has achieved initial success,which is a new idea for the rapid development of UGS construction in China. 展开更多
关键词 natural gas drive gravity displacement integrated gas storage construction gas storage parameter optimization EOR
下载PDF
Gas Project under Construction
2
《China Oil & Gas》 CAS 1996年第3期165-165,共1页
GasProjectunderConstructionAprojectentitled"HopeofSichuanNaturalGasIndustry"thatisfundedbySichuanPetroleumAd... GasProjectunderConstructionAprojectentitled"HopeofSichuanNaturalGasIndustry"thatisfundedbySichuanPetroleumAdministrationhasbe... 展开更多
关键词 PROJECT gas Project under construction
下载PDF
STEADY HEADWAY MADE IN CONSTRUCTION OF SE-NING-LAN GAS PIPELINE
3
《China Oil & Gas》 CAS 2000年第3期40-45,共6页
关键词 gas LAN STEADY HEADWAY MADE IN construction OF SE-NING-LAN gas PIPELINE SE
下载PDF
2013 Production of China's Shale Gas Reaches 200 Million Cubic Meters and the First Transportation Pipeline Constructed
4
作者 HAO Ziguo FEI Hongcai +1 位作者 LIU Lian Susan TURNER 《Acta Geologica Sinica(English Edition)》 SCIE CAS CSCD 2013年第5期1472-1472,共1页
Results of the global shale gas resources show that minable resources of global shale gas are 187 trillion cubic meters (tern), of which China accounts for 36 tcm (about 20% of the total amount), which is mainly d... Results of the global shale gas resources show that minable resources of global shale gas are 187 trillion cubic meters (tern), of which China accounts for 36 tcm (about 20% of the total amount), which is mainly distributed in the Sichuan Basin, Yangtze Terrace, and Ordos Basin. From 2009 to 2012, China completed an accumulative number of 129 drilling wells related to shale gas, including 46 investigated vertical wells, 55 exploration wells and 28 evaluation wells, with 2012 production ranging from 25 million cubic meters (mcm) to 30 mcm. 展开更多
关键词 Production of China’s Shale gas Reaches 200 Million Cubic Meters and the First Transportation Pipeline Constructed
下载PDF
Gas field construction on time
5
《China City Planning Review》 1994年第1期26-26,共1页
About one--fOurth of the con- sery’e capacity at l00 billion cubic me-struction on China’s largest off shore tres.drilling field is now complete. and en- By January 30. more than 240gineers say the projcct is on sch... About one--fOurth of the con- sery’e capacity at l00 billion cubic me-struction on China’s largest off shore tres.drilling field is now complete. and en- By January 30. more than 240gineers say the projcct is on schedule kilo1netres ol’ underu:ater pipelinestbr opening January l. l996. u:ere laid. about one fourth of the to-The Ya l3-- l Gas Field in the ta1. according yesterday’s o\’erseas edi-South Chlna Sea wiIl suppl} Hong tion or People’s Dall}’.Kong and Hainan Province w’ith natu- Exentually tuo underuaterral gas. Estimates put the tield’s re- pipeIInes ’’iIl he constructedt one. 展开更多
关键词 gas field construction on time THAN
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部